Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Heap Leaching at Camel Creek Mine

    By Menne D. M, Ladyman R

    Camel Creek Mine operated by Lynch Mining Pty Ltd is located 65 km west of inghain and 160 kin north west of Townsville in North Queensland. (Figure 1). The Camel Creek gold mineralisation was disco

    Jan 1, 1994

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018

  • AUSIMM
    Application of Computer Assisted Modelling to Final Wall Blast Design

    By Jones J. P, Arriagada J, Scherpenisse C. R

    A recently-developed model is used as a tool to optimise the design of blasts used to create final walls in large open pit mines. The use of this tool has allowed present blasting practice and propo

    Jan 1, 1995

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, Sweden

    By M Svartsjaern, D Saiang and K Mäkitaavola

    The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The

    May 9, 2016

  • AUSIMM
    The Geology of the Woodcutters Lead-Zinc-Silver Deposit and Its Environment, Rum Jungle Area, Northern Territory

    The Woodcutters deposit, 65 km south- southeast of Darwin, N.T., consists of a series of veins of pyrite, sphalerite, and galena with some silver, cadmium, antimony, and arsenic minerals. The veins

    Jan 1, 1984

  • AUSIMM
    The Prevention and Control of Burning in Waste Coal Dumps (e814abc3-2b0b-49ff-8a5e-6cd3cf04acc7)

    Indiscriminate surface disposal of coal waste in New South Wales has created a serious fire hazard and increased air pollution.A survey of numerous dumps, as well as particular investigations of one b

    Jan 1, 1971

  • AUSIMM
    Exploration and Mining on Aboriginal Land - Dispelling the Myths

    By D Pearce

    The 15-year long debate between the industry, Government and Aboriginal people about the rights and wrongs of Land Rights, the right of Aboriginal people to control development on their land and the

    Jan 1, 1994

  • AUSIMM
    Julius Kruttschnitt Mineral Separation Index - Small-Scale Test to Characterise the Flotation Response of an Ore Type

    By S Morgan, D J. Bradshaw, S Schwarz

    The characterisation of the flotation kinetic response in future mining deposits is important because the flotation response is affected by changes in ore mineralogy. Current methods for characterisin

    Oct 29, 2012

  • AUSIMM
    Monitoring Equipment Productivity Improvements in Coal Mines

    By Sengstock G. W, Spathis A. T

    Benchmarks of mine equipment involved in the excavation process of coal mines would suggest that such equipment is not always operating at an optimum level. Dragline operations and truck/shovel oper

    Jan 1, 1995

  • AUSIMM
    Gold-Rich Porphyry Copper Deposits of the Circum-Pacific Region - an Update Overview

    Gold-rich porphyry copper deposits areimportant sources of gold in the circum-Pacific region: 26 major deposits contain >7000 tonnes of gold. The deposits occur in a variety of subduction-related sett

    Jan 1, 1990

  • AUSIMM
    Managing Underground Risks in Singapore Through Geotechnical Interpretative Baseline Reports

    By L N. Loganathan

    Risk exposure in tunnel projects is extremely high due to various factors such as variability of subsurface conditions, selection of inappropriate design and tunnelling methods, improper risk assessme

    Jan 1, 2008

  • AUSIMM
    Development of the Zafranal Geometallurgical Model

    By G Harbort

    The use of geological data for optimisation of operating plants has become a significant part of the modern process mindset. The underlying principle is to convert spatial geological data into metallu

    Sep 5, 2011

  • AUSIMM
    Predicting Machine Cutting and Cutter Wear Rates for Mining Applications

    By Trueman R

    If continuous mining systems are to be successfully applied in metalliferous mines then reliable models will be needed to predict rock cutting machine advance and tool wear rates for effective machi

    Jan 1, 1995

  • AUSIMM
    Use of an on-line Moisture Meter to Investigate Product Moisture in Coal Preparation

    By Jensen B, Ofori P, He Y, White E, Stanmore B, Brien M, O&apos

    As part of a large AMIRA project, an on-line moisture meter was installed at two mine sites in Central Queensland. This project investigated the factors which control the moisture content of coarse (&

    Jan 1, 1995

  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    Significant and Recent Advances in Grinding Mill Relining Technologies

    The South American mining community leads the world in recognition and adoption of the latest grinding mill relining technologies. Clearly this region has recognised the benefits of improved relining

    Jan 1, 2009

  • AUSIMM
    Slab-Buckle Failure in Weak Coal Mine Strata - The Malvern Hills Case Study of July 2004

    By D H. Bell

    Slab-buckle failures in coal sequences involve thin slab deformation in strata dipping parallel to the footwall, and are a consequence of both unloading and the weak nature of the thinly bedded rock m

    Jan 1, 2007

  • AUSIMM
    Metallurgical QA/QC – who needs it? The Olympic Dam experience

    By K Ehrig, V Liebezeit, E Macmillan

    The results from metallurgical test programs are used in feasibility studies for design of new plants and brownfield expansions, in long term mine plans, and to make decisions in an operating plant. T

    Sep 11, 2017

  • AUSIMM
    Practical Considerations when using Auxiliary Axial Flow Fans as a Primary Mine Fan

    By D Roughsedge, J van der Sandt, L van den Berg

    Axial flow fans are commonly used as auxiliary fans in underground mines to supply air to development headings. As diesel dilution requirements increase the fans used in conjunction with ventilation b

    Jul 1, 2013