Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Perimeter Control Utilising Electronic Detonators at Mount Wright MineBy J Wall
The use of electronic detonators in civil tunnelling applications, to reduce vibration in small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen
Mar 21, 2011
-
Adaptation of an Open Pit Optimiser for Underground Strategic PlanningBy M Bloss, B Roberts
BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so
Nov 24, 2014
-
Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value ChainBy D Smith, A Ramdhani, J Francke
Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement
Aug 18, 2014
-
Process Implications of Ferrolysis in Hyper-Saline WaterBy J Bean
Iluka Resources Ltd developed the Jacinth-Ambrosia Mine (Jacinth) in the Eucla Basin during 2009 and 2010. In this arid climate the operation relies on hyper-saline groundwater from a palaeochannel fo
Oct 5, 2011
-
Surface and groundwater monitoring and seepage control at the Sungun Copper MineBy N Pirouznia, F Rashidi Nejad, S Naraghi
Sungun Copper Mine, which is the second largest copper mining operation in Iran has a large tailings storage facility with a seepage control dam located downstream of the main dam. Surface and groundw
Jul 23, 2018
-
On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant PerformanceBy D Morgan, K Jones
"In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co
Oct 10, 2016
-
Development of new performance prediction models for a raise boring machine based on indentation testsBy C Balci, D Tumac, A Sheterpour-Mamaghani, E Dogan, A Kocbay, T Erdogan, A Gumus, H Copur, E Altintas
Excavation of vertical and/or inclined shafts in the underground structures requiring careful design and planning. Raise Boring Machines (RBMs) are commonly used for excavation of shafts for different
Nov 29, 2022
-
Recognising and Integrating Stakeholder Landform Expectations into Life-of-mine PlanningBy P D. Erskine, A Hine
The current Queensland Government’s rehabilitation guidelines for post-mining landforms present a hierarchy of preferred outcomes for different areas within the mine site (see Figure 1). Within all ar
Jun 28, 2016
-
The 1999 JORC Code ù What Does it Mean for TodayÆs Mining Geologist?The 1999 edition of the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves (the æJORC CodeÆ) became effective in September 1999 and is the latest revision of a Code which
Jan 1, 2000
-
Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil DumpBy R Van Laeren, G Langerak, S Fityus, K Koosmen
Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal
Jul 27, 2015
-
Telfer Project Process Plant DesignBy R Dunne, G Lane, S Ha, D Dreisinger
The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine
Jan 1, 2003
-
Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western AustraliaBy D R. Anstey
The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from
Jul 11, 2011
-
Design for Tunnel Fire Life Safety – Working Together in the New Zealand ContextBy E Claridge
There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r
Mar 8, 2011
-
The Casposo Gold-Silver Project – Process Selection and DesignBy D Connelly
Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi
Aug 8, 2011
-
Lighting up the dark – the use of 3D seismic to optimise mine plans at structurally complex Blackwater mineBy N Pranoto, E Lawell, T Dean, M Grant
The Goonyella Riverside Mine is located 30 km north of Moranbah in Central Queensland, Australia. Recent mining activities have exposed the north–south striking Kenya and Zimbabwe thrust Faults. These
Mar 22, 2022
-
A Three-Dimensional Model of MuckpileFormation and Grade Boundary Movement in Open Pit BlastingBy Kavetsky A
In surface mining operations, the ease with which a muckpile may be dug is a dominant factor in mining efficiency. Within broad limits, this is largely dependent on muckpile shape and looseness with
Jan 1, 1989
-
Tailings governanceBy T Alexieva
Since the early 1900s the geotechnical community has investigated every significant failure of a tailings dam, improved our knowledge of the behaviour of the tailings storage facilities, developed ana
Jul 23, 2018
-
Effects of Melt Composition on the Interactions of Sinter Melt on a Natural Iron Ore SubstrateBy S Hapugoda, J R. Manuel, M P. Ma, L Lu
Iron ore sinter quality depends heavily on the mineralogy, textures and physical structure of the sinter, which is formed upon solidification of the primary sinter melt. The interactions of the initia
Aug 12, 2013
-
TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment ManufactureBy J M. Shekiro
In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most
Oct 5, 2011
-
Diversion decision making with an integrated approach to design for operations and mine closureBy M Rafty, A Markham, S Atkinson
Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete
Jul 25, 2018