Search Documents

  • AIME
    Secondary Recovery and Pressure Maintenance - Oil Recovery in Five-Spot Pilot Flood

    By B. H. Caudle, L. G. Loncarie

    Pilot flooding is one method of evaluating a proposed secondary recovery project. However, the amount and rate of oil recovery from an unconfined pilot area is not usually the same as from an equal ar

  • SME
    Usage of fly ash as binder in the micropelletization process as a partial replacement of bentonite

    By Rameshwar Sah, PK GHORUI, LR SINGH, SIVALINGARAJU BARISETTY, SHYAM YADAV

    Fly ash is a by-product generated by the combustion of coal in thermal power plants. Its disposal is a major environmental concern for these power plants. Though a considerable part of fly ash is used

  • AIME
    Mining - Precision Survey for Tunnel Control

    By Douglas D. Donald

    The New Jersey Zinc Co. successfully holed through a 2 1/2-mile haulage tunnel connecting its new Ivanhoe shaft with the Van Mater Shaft at Austinville, Va. This 8x 10-ft cross-section tunnel was driv

    Jan 1, 1959

  • SME
    World?s Largest TBM Keeps Niagara Project On Track

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st

    Jan 1, 2008

  • IMPC
    Safety Requirements and Evaluation of Health Hazards in the Processing of Mineral and Waste Materials (ABSTRACT PAGE)

    By Gerke Gilian, Pretz Thomas, Pehlken Alexandra

    "The evaluation of health hazards within the treatment of mineral and waste materials is gaining more and more importance in industrial countries. The need to control occupational safety has been reco

    Jan 1, 2003

  • SME
    Promising Options for Solving the Dolomite Problem of the FloridaPhosphate Resources—a Brief Review Mining, Metallurgy and Exploration

    By Dapeng Zhang, Brij Moudgil, Shibo Zheng, Chunhui Feng, Wenyi Song, Wending Xiao, Patrick Zhang

    Separation of dolomite from phosphate is the most challenging problem in phosphate mineral processing. Over 50% of the future phosphate reserve in Florida contains too much dolomite to process using t

  • NIOSH
    IC 6677 Working an Underground Mine 6 Years Without Lost-Time Accidents

    By C. A. Herbert

    The mine of the Alpha Portland Cement ..Co., Iroaton, Ohio, ..working in. a. bed of limestone 96 feet thick at a depth of approximately 510 feet below the surface, has established a won¬ derful safety

    Jan 1, 1933

  • SME
    Measurement of RF propagation around corners in underground mines and tunnels - SME Transactions 2016

    By C. Zhou, R. Jacksha

    This paper reports measurement results for radio frequency (RF) propagation around 90° corners in tunnels and underground mines, for vertically, horizontally and longitudinally polarized signals. Meas

    Jan 1, 2016

  • AUSIMM
    Realismm, A Virtual Reality in Rational Managerial Decision Making

    Rational decision making is generally perceived by managers of operations to be a delicate process of committing large sums of money and putting other people's life at risk. Consequently most man

    Jan 1, 1993

  • AUSIMM
    Commissioning and Ramp-up of the Albion Process at the GPM Gold Project

    By M Hourn, D Turner, P Voigt, D Mallah

    The GPM Gold Project is located in Armenia, and consists of an open cut mine at Zod, near the Azerbaijan border, and a CIL processing plant at Ararat near the Turkish border. Mining at Zod commenced i

    Sep 7, 2015

  • CIM
    Bio-Liquefaction of Fushun Coal and its Model Compounds by White Rot Fungi Hypocrea Lixii Ah

    By Xiu-Xiang Tao

    This study investigated bio-liquefaction of lignite and its model compounds of thymol, bezioc acid and quinoline by a fungus, Hypocrea lixii AH. It analyzed, during bio-liquefaction, enzyme activity o

    Aug 1, 2013

  • AUSIMM
    Sampling and Grade Control Pratices at Misima Mines

    The Misima open pit gold mine is a 20Mt per annum operation. Blasthole drilling is used to sample all material at a uniform 5m square pattern, and representative sub- sampling of the blast holes en

    Jan 1, 1991

  • AUSIMM
    Laboratory Determination of the Ash Content of Some Australian Coals Using Radioisotope Techniques

    By Fookes R. A, Gardner K. J, Gravitis V. L, Watt J. S, Steffner E. J

    Two radioisotope techniques suitable for the rapid laboratory determination of the ash content of coal have been tested ou unwashed coal samples from four Australian coal seams. In one techniqne, meas

    Jan 1, 1982

  • NIOSH
    OFR-10-84 Concurrent Establishment Of Ground Cover And Hardwood Trees On Reclaimed Mineland And Unmined Reference Sites ? Summary And Conclusions ? Introduction - Background

    By W. R. Byrnes

    This project was initiated on October 1, 1980 and will be completed on December 31, 1983. The project was Initially approved and funded by the Office of Surface Mining and subsequently was moved to th

    Jan 1, 1983

  • CIM
    The Beginning of Trade Unions in Nova Scotia

    By Robert Drummond

    Away back in the eighties of the last century, when Sir Charles, then Doctor, Tupper, was not only a prominent but a dominant figure in the political life of Nova Scotia, his opponents brought the rai

    Jan 1, 1924

  • DFI
    Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information System

    By Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler

    Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e

  • AUSIMM
    The Experimental Extraction of Copper from Ukaparinga Copper Ore

    By Osetzky D, Hesp W. R

    The treatment of a hydrobiotite containing 0·64 per cent copper with various soluHons showed that a high percentage (up to 90 per cent) of the copper can be extracted under mild conditions (1 M B

    Jan 1, 1977

  • NIOSH
    RI 4198 Spectrochemical Determination of Nickel in Electrolytic Cobalt Using a Current-Regulated Direct-Current Arc

    By Graham W. Marks, Clyde A. Bridger

    "INTRODUCTION An electrolytic process for the preparation of metallic cobalt has been developed recently in the Bureau of Mines Experimental Station at Boulder City, Nev. Chemical analysis shows this

    Feb 1, 1948

  • SAIMM
    What happened to the mechanics in rock mechanics and the geology in engineering geology - Synopsis

    By P. J. N. Pells

    A good thing is becoming a bad thing. Rock mass classification systems, that are so excellent for communications between engineers and geologists, and that can be valuable in categorizing project expe

    Jan 1, 2008

  • NIOSH
    OFR-02-90 A Raw-Coal Concentration Sensor For Hydrotransport

    By Victor V. Verbinski

    This report presents the development of a raw coal concentration sensor for hydro-transport of coal and refuse (rock) from underground mines, and the results of an international test series carried ou

    Jan 1, 1988