Search Documents

  • ABM
    Geração De Gás De Pirólise Para Fins Energéticos

    By Adriana de Oliveira Vilela

    A produção de carvão vegetal em Forno Container Rima (FCR) consiste em um processo semi-contínuo composto por fornos cilíndricos metálicos móveis, com exaustão forçada dos gases. Cada ciclo se divide

    Aug 16, 2017

  • NIOSH
    IC 9187 Phosphate Availability And Supply - A Minerals Availability Appraisal

    By R. J. Fantel

    The Bureau of Mines investigated the resources, costs, capacities, market relationships, and short- and long-run supply of phosphate rock and phosphoric acid. The 206 mines and deposits evaluated in 3

    Jan 1, 1988

  • DFI
    Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled Shafts

    By Josef K. Alter

    Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr

    Jan 1, 2011

  • AUSIMM
    Metallurgical Management Tools for Continuous Improvement

    By R Dunne, W McCallum

    Continuous improvement might be defined as seeking incremental improvement over time through improved equipment, processes, technology and the efforts of people. Most people working in ore processing

    Oct 29, 2012

  • CIM
    Prepaid Medical Care for Employees of the Hollinger Mine

    By R. P. Smith

    PRIOR to June, 1937, the employees of Hollinger Consolidated Gold Mines, Ltd., at Timmins, Ontario, received medical care for themselves under a contract system developed through an agreement between

    Jan 1, 1943

  • SAIMM
    Stability analysis of a free-standing backfill wall and a predictive equation for estimating the required strength of a backfill material – a numerical modelling approach

    By S. Sekhar, S. Bhargava, A. K. Godugu, J. L. Porathur

    Cemented backfilling has enabled underground hard rock mines to extract orebodies more safely with improved ore recovery. It is important to estimate the minimum required strength parameters for a bac

    May 2, 2022

  • DFI
    Advances in Desaturation of Sandy Soil to Mitigate the Liquefaction Hazard

    By Dhanaji S. Chavan, Thallak G. Sitharam

    "It is well known that sites comprising of saturated loose sand undergoes large deformations, due to liquefaction, during seismic shaking. To cope with this, different mitigation techniques such as vi

    Jan 1, 2017

  • SAIMM
    Strategies and tactics to control seismic risks in mines - Synopsis

    The risk associated with mining induced seismicity is one of the major threats to the safety and sustainability of deep underground mines. This paper describes techniques that allow site practitioners

    Jan 1, 2009

  • SME
    TECHNICAL NOTE - Accommodating the Land Use Planning Provisions of the Surface Mining Control and Reclamation Act

    By L. W. Saperstein

    Public Law (PL) 95-87 contains explicit demands for land use planning in its reclamation and designation sections. Both sections require recognition of local land use plans; however, they are not well

    Jan 12, 1983

  • AIME
    Institute of Metals Division - On the Use of Lineal Analysis for Obtaining Particle Size Distribution Functions in Opaque Samples

    By R. L. Fullman, J. W. Cahn

    A method is derived for obtaining the distribution of sphere diameters and plate thicknesses (or pearlite spacings) from size distribution functions obtained along randomly oriented lines. The method

    Jan 1, 1957

  • AUSIMM
    Stratigraphy of the Thomson Orogen – New Insights from Mount McLaren, North-east Australia

    By C Verdel, M Lee, A Oorloff, K Welsh

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Thomson Orogen is a large but poorly understood element of Queensland geology. Extensiv

    Mar 18, 2015

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015

  • TMS
    Iron Oxide Reduction With Conventional And Microwave Heating Under CO And H2 Atmospheres

    By Jiann-Yang Hwang

    Microwave heating has been proved an effective method to rapidly heat iron oxide. This offers an opportunity to apply microwave heating in the steelmaking process. The reduction reaction of iron oxide

    Jan 1, 2006

  • CIM
    Management of Copper Solvent Extraction Plants Running At Reduced Throughput

    By D. Kachongo, Y. Cheng, A. Kashala, D. Samal, G. Mitshabu

    Many copper processing flowsheets in the Democratic Republic of Congo include the leaching of oxide ores containing copper and cobalt, copper solvent extraction, copper electrowinning, and precipitati

    Jan 1, 2019

  • ISEE
    Response of Manufactured Houses to Blast Vibrations

    By Michael Mann

    Two house trailers and a modem modular house, all pillar-supported with cantilevered perimeters, were monitored for structural response to vibrations from surface coal mine blasts. Due to the large bl

    Jan 1, 2000

  • SME
    Hydraulic Impacts Of Quarries And Pits: Critical Planning For Resource Development

    Introduction Aggregate mining impacts on water resources are a source of concern to local governments. To evaluate those impacts, the Minnesota Department of Natural Resources conducted a four-year

    Jan 1, 2007

  • SME
    EPB TBM Tunnelling in Singapore Old Alluvium

    By N. Loganathan, Tan Boon Tee, Joe O’Carroll, Richard Flanagan

    In recent years, tunnelling activities in Singapore have increased considerably with the construction of extensions to the existing sub-surface transport system, a deep tunnel sewerage disposal system

    Jan 1, 2005

  • SAIMM
    Life-Of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine (f7fec8ba-f444-4056-8367-98da9f297180)

    Resolution Copper Mine is planned to be a 2000 m deep panel cave mine with virgin rock temperatures above 80°C in rock with a high crystalline silica content. The planned run-of-mine production rate i

    Jan 1, 2014

  • NIOSH
    IC 7294 Prospect Trenching With Caterpillar-Mounted Angledozers

    By S. H. Lorain

    Mechanized dirt-moving equipment has greatly increased the scope of prospect trenching by lowering the costs and increasing the speed of such work. Where the soil covering was more than 3 or 4 feet de

    Jan 1, 1944

  • NIOSH
    RI 5400 Investigation Of Cuyuna Iron-Range Manganese Deposits, Crow Wing County, Minn. - Progress Report 1 ? Summary

    By Walter E. Lewis

    The Cuyuna iron range in Crow Wing County, Minn., is the principal producer of manganiferous iron ore in the United States. The ore is mined from a manganiferous iron formation in the bedrock of the C

    Jan 1, 1958