Search Documents

  • IOM3
    Diagnosis of tunnel roof stability with a robotic sensor test bed

    By G. Zhan, P. Mousset-Jones, G. Danko, J. J. K. Daemen, C. Mezei

    Paper presented at the conference Risk assessment in the extractive industries, held in Exeter, 23-24 March 1994, and first published London: IMM, 1994, preprint volume. 18pp., 12 refs. (Originally en

    Dec 1, 1994

  • SME
    Improvements in Magnetite Processing Utilising Magnetic Separation Technologies - SME Annual Meeting 2025

    By George Mandarakas, Johan van Zyl, Karl-Heinz Becker

    The world’s climate today has changed compared to 10 or 20 years ago. Many countries face water shortages; water sourcing for mining activities has become harder to secure. ESG’s focus on the industry

    Feb 1, 2025

  • NIOSH
    Underground And Surface Mining Facts - 2005 - Mining Operations

    In 2005, data obtained from the Mine Safety and Health Administration (MSHA) indicated a total of 922 underground (6.3%) and 13,744 surface (93.7%) mining operations.1

    Jan 1, 2008

  • CIM
    Monitoring Wastewater Quality at Falconbridge's Sudbury Operations

    By M. U. Oko

    "Monitoring of all the waste streams from Falconbridge's Sudbury Operations to determine whether they meet the required standards, has been performed for many years. By 1969, however, the number of sa

    Jan 1, 1971

  • NIOSH
    OFR-161(1)-77 Stope Mechanization - Vein Mining

    By J. Bootle

    Marrow vein deposits will continue to be an important source of valuable minerals. Productivity per manshift is not keeping pace with operating costs. Increased mechanization of stoping operations mus

    Jan 1, 1977

  • CIM
    Mineral resources in Canada?s future

    By P. L. Drake

    This paper comprises a discussion of the role which mineral resources will play in Canada's future export trade and the growing demand for minerals in Canada.

    Jan 1, 1979

  • SME
    New improvements to MFIRE to enhance fire-modeling capabilities

    By L. Yuan, A. C. Smith

    MFIRE, the mine-fire simulation program of the U.S. National Institute for Occupational Safety and Health (NIOSH), is widely accepted as a standard for assessing and predicting the impact of a fire on

    Jun 1, 2016

  • AUSIMM
    Techniques Used and Problems Encountered in Normal and Reverse Circulation Drilling at the Mt Roseby Project, Cloncurry, North West Queensland

    Techniques Used and Problems Encountered in Normal and Reverse Circulation Drilling at the Mt Roseby Project, Cloncurry, North West Queensland

    Sep 13, 2010

  • NIOSH
    OFR-67-80 Identify And Evaluate Lightweight Support Substitutes

    By Gilbert L. Forst

    The objective of this program is to identify and evaluate superior, lightweight substitutes for selected coal mine roof support concepts such as crossbars, posts, and crib blocks. Engineering analysis

    Jan 1, 1978

  • AUSIMM
    New Zealand Institute of Mining Engineers

    I would take this, opportunity of thanking you for the high honour you have conferred on me in electing me to the responsible position of President. You may rest assured I will use my best endeavours

    Jan 1, 1901

  • CIM
    Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future

    By Jean Cayouette, Paul Blatter, Paul Cousin

    "The Laronde mill was commissioned in 1988 and has been treating the Laronde Penna ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accom

    Jan 1, 2011

  • NIOSH
    Improved Respirable Dust Monitor - Objective

    Continuously monitor and record respirable dust levels underground by a reliable, sensitive, and fast-response device. Approach A light-scattering photometer, having a LED (Light Emitting Diode)

    Jan 1, 1979

  • CIM
    Operating Experience and Developments of G-Rex and Aurix100 Resin Exchange Technology

    By Peter Richards, Alexander Lewis-Gray, Mark Davies, Nicholas Katsikaros

    "Gekko Systems developed the Gekko Resin Exchange Column (G-REX) in order to optimise the recovery of gold in complex leach-to-electrowinning processes, as an intermediate step using a highly gold-sel

    Jan 1, 2016

  • NIOSH
    IC 7805 Bibliography On Extractive Metallurgy Of Nickel And Cobalt, January 1929-July 1955 ? Introduction And Summary

    By R. B. Bauder

    In connection with a Bureau of Mines research program on utilization of Cuban lateritic ores, a comprehensive review was made of the chemical literature on nickel and cobalt. Initially, the review had

    Jan 1, 1957

  • AUSIMM
    Blasthole sampling (replicate and variographic experiments) in LKAB open pit iron ore mines – fit-for-purpose representativity?

    By K H. Esbensen, K Engström

    The conclusion from the debate over the last decade in the mining sector is that, for grade control, reverse circulation (RC) drill sampling gives more reliable results due to less sampling problems t

    May 9, 2017

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • CIM
    Changes in the rules of the game for the mining industry at home and abroad

    By Dorothy Walters

    As an increase in the number of producers alters fact ors affecting supply, long-term prospects in traditional markets for many minerals weaken. At the same time, conflicts between national and intern

    Jan 1, 1979

  • SAIMM
    A Hybrid Location Methodology

    By S. M. Spottiswoode

    The aim of the hybrid location method is to improve seismic event locations by reducing the effects of errors in the wave velocity of ray paths between each event and each recording site. We report on

    Jan 1, 2005

  • CIM
    Development of a copper arsenate process for Inco's Manitoba Division

    By J. Budac, E. Krause, C. L. Stewart, D. Wrana, S. W. Laundry

    "As part of an over-all arsenic management strategy, Inco has developed a novel process that converts a by-product high moisture copper/arsenic sulphide precipitate into a crystalline copper arsenate

    Jan 1, 1995

  • AUSIMM
    Life Cycle Assessment of Process Options for Copper Production

    By Y Zhuang, S La Brooy

    The selection of the optimum process route for a new project has traditionally consisted of investigating existing options and ranking them in terms of cost, technical risk and environmental acceptabi

    Jan 1, 2002