Search Documents

  • CIM
    Clayburn-Harbison Limited Operations in British Columbia

    By R. H. Beaton

    "About 1905, a plant was constructed at C1ayburn, in the Lower Fraser valley, 4'5 miles east of Vancouver, to process shales from Sumas mountain into heavy clay products. In time, mining operations we

    Jan 1, 1959

  • TMS
    Process Considerations Before And After Failure Of The Omai Tailings Dam, August 19 To 24,1995

    By Robert R. Beebe

    On the night of August 1'9-20, 1995, seepage was seen at the toe of the Omai tailings dam in Guyana. The mill was immediately shut down, and within two hours the flow, then mostly water, was dive

    Jan 1, 1998

  • SAIMM
    Roll-to-roll coating methods for the manufacture of polymer electrolyte membrane fuel cell membrane electrode assemblies

    By O. Barron, C. Felix

    In 2023, polymer electrolyte membrane fuel cell membrane electrode assemblies accounted for about 62% of the global fuel cell market share and this demand is expected to grow. Commercialisation requir

    May 27, 2025

  • AIME
  • TMS
    Characterization of the Clay Soil of the Neighborhood Codin, Located in Campos (RJ), to Produce Soil-Cement Blocks

    By A. R. G. Azevedo, G. C. Xavier

    "This work has for objective to identify the soil of the neighborhood Codin located in a lacking area of the urban nucleus of the district of Campos dos Goytacazes - RJ, after the identification the b

    Jan 1, 2013

  • SME
    Productivity, An Ever More Critical Factor in the Mining Industry

    The US Bureau of Mines' dictionary of mining terms defines productivity as "the efficiency with which economic resources (men, material, and machines) are employed to produce goods and services."

    Jan 11, 1983

  • CIM
    Enterprise Optimization Releasing Value Through Better Planning Decisions

    By Gerald Whittle

    What is Enterprise Optimization? Releasing value through better planning decisions: Philosophy, Methodology, Software The key to 5% -35% increase in enterprise value (NPV) The culmination of 25 yea

    May 1, 2010

  • SME
    Topographic Reconstruction On Mining Sites: Landscape Stabilization And Erosion Control

    By T. J. Toy

    The topography reconstructed following land disturbance is the foundation for all other reclamation practices. As the manufactured drainage basins, hillslopes, and stream channels approach a steady-st

    Jan 1, 2002

  • SME
    Stochastic Modeling Of Iron In Coal Seams Using Two - Point And Multiple - Point Geostatistics: A Case Study

    By Nasser Madani, SULTAN ABULKHAIR

    The geological and geostatistical modeling of mineral deposits requires densely sampled drillholes that provide accurate and reliable hard data. Furthermore, quantifying orebody uncertainty through ge

    Aug 1, 2022

  • SME
    Comparative study of gold extraction from refractory pyritic ores through conventional leaching and simultaneous pressure leaching/oxidation

    By M. A. ENCINAS-ROMERO, G. TIBURCIO-MUNIVE, P. GUERRERO-GERMÁN, M. M. SALAZAR-CAMPOY, J. L. Valenzuela-García, L. S. QUIRÓZ-CASTILLO, J. R. PARGA-TORRES

    Simultaneous alkaline pressure oxidation and sodium cyanide leaching treatments on a pyritic ore from Mulatos Mine located in Sahuaripa, Sonora, Mexico, were carried out. Mineral characterization, agi

  • SME
    Numerical modeling simulation and experimental study of dynamic particle bed counter-current reactor and its effect on solid–gas reduction reaction

    By S. S. SHINDE, P. C. JIKAR, N. B. DHOKEY

    Mill scale is an oxide waste product of steel mills, containing around 70 percent iron and other allied impurities. In the present context, a dynamic prototype counter-current reactor (CCR) was used f

  • AUSIMM
    Shifting post-mining land use planning from mine site to regional scale

    By C M. Côte, S Worden, K Svobodova

    Mines in Queensland are transitioning to the progressive rehabilitation and closure plan (PRCP) framework. Mine operators are required to select and justify appropriate and viable post-mining land use

    Aug 2, 2023

  • NIOSH
    IC 7372 Electric Blasting Switches, Underground Mines. Lake Superior District

    By Frank E. Cash, Max S. Petersen

    "INTRODUCTION Explosives have been used in ever—increasing amounts since gunpowder was invented. For hundreds of years only low explosives of the deflagrating type were used, and they were fired by me

    Sep 1, 1946

  • TMS
    Submerged Bath Smelting Applied to the Non-Ferrous Metal Industry

    By J. M. Floyd

    Technology in use commercially and available for commercialisation for injection processing of base and precious metals in bath reactors is surveyed and compared. Differences between bath smelting an

    Jan 1, 1993

  • SME
    Geology And Geochemistry Of The Mule Canyon Gold Deposit, Lander County, Nevada

    By K. Thomson

    The Mule Canyon gold deposit, located 14 miles ESE of Battle Mountain, Nevada, was discovered in 1986 as the result of a GFMC grass-roots exploration program. Drilling to date has identified six discr

    Jan 1, 1993

  • AIME
    Mining and Metallurgy - Nonferrous Physical Metallurgy

    By H. W. Gillett

    MAINTENANCE of membership by the technical so¬cieties and the activity of these societies in spite of the adverse business situation have been noteworthy. This forcibly brings home the fact that indus

    Jan 1, 1933

  • AIME
    Contents

    Jan 1, 1970

  • SME
    Materials Flows Generated by Pyromet Copper Smelting

    By Thomas G. Goonan

    Copper production through smelting generates large volumes of material flows. As copper contained in ore becomes copper contained in concentrate to be fed into the smelting process, it leaves behind

    Jan 1, 2005

  • DFI
    Unconventional Solutions For Construction Of A Hybrid Cut-Off Wall At The Dead Sea

    By Karsten Beekhaus, Sander W. Odijk, Rabea Bahlum, Mazin Adnan, Ayman Abdelh Al Nuaimat, Hassan Farhat

    The Arab Potash Company, APC, is one of the 10 largest potash producers of the world. The solar ponds at the Dead Sea, used for the enrichment of the salt content in the brine, are of crucial importan

    May 1, 2022

  • CIM
    Blast optimization and stability enhancement through geotechnical mapping at Highland Valley Copper

    By D. Assmus, S. Daly

    "Poor fragmentation, high toe areas, excessive shovel wear and tear and frequent re-drilling and blasting of certain tough waste rock zones in the Lomex pit in the early 1980snecessitateda better unde

    Jan 1, 1992