Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
RI 6239 Performance Characteristics Of Coal-Washing Equipment: Concentrating TablesBy A. W. Deurbrouck
Five preparation plants employing concentrating tables for washing 3/8- inch to 0 raw coal were tested. Two of the plants were washing Pittsburgh-bed coal, two were washing Pocahontas-bed coal, and on
Jan 1, 1963
-
IC 8593 Determining Discounted Cash Flow Rate Of Return And Payout Time For Onshore Development Wells - A Graphical MethodBy T. M. Garland
A nomographical approach is proposed as a fast, easy-to-use, and reason- ably accurate method for estimating expected discounted cash flow (DCF) rate of return and payout time for onshore development
Jan 1, 1973
-
Integrating Machine Learning and Geostatistics for Grade Control ModelsBy Ademar Lopes, Victor Silva, Heitor Silva, Gustavo Usero, Roberto Rolo, Lucas Pereira, Gabriel Moreira, João Lague, Arthur Endlein, Matheus Feitosa
Grade control models are supposed to provide a higher resolution than long-term or interim models. However, available grids from diamond or reverse circulation drilling do not provide that required re
Jun 25, 2023
-
RI 4496 Investigation Of The Thompson Magnesium Well, Grand County, UtahBy C. L. Severy
The Reeder No. 1 well was drilled by the Bureau of Mines in cooperation with the Geological Survey as agents for the Defense Plant Corporation. The well is south of Crescent Junction near Thompson, Gr
Jan 1, 1949
-
Sources and Extent of Mine Atmosphere ContaminantsSeam gases are the most important atmos- phere contaminants in Australian collieries, their importance increasing with depth; C02 as well as CH4 may be important in intruded envir- onments. The gene
Jan 1, 1983
-
Factors to be Considered in Interpretation of Prospect-Drilling ResultsBy H. C. George
CAREFUL- sampling and good judgment as to probable recoveries are important factors in estimates of ore reserves, based on prospecting drilling results, but other factors are equally as important and
Jan 1, 1921
-
Washington Paper - The Cedar Point Iron Company's Furnace, No. 1, at Port Henry, Essex County, New YorkBy T. F. Witherbee
It is proposed to give, first, a description of the works; second, a report of the first six months of the present blast; and third, such improvements as have been suggested by the practical working.
-
The Cedar Point Iron Company's Furnace, No. 1 At Port Henry, Essex County, N. Y.By T. F. Witherbee
IT is proposed to give, first, a description of the works ; second, a report of the first six months of the present blast; and third, such improvements as have been suggested by the practical working.
Jan 1, 1876
-
Tailings Disposal, Generation of Acidity from Pyrrhotite and Limestone Neutralization of Wastewater at Falconbridge's Onaping MinesBy L. S. Rivett, U. M. Oko
The Strathcona mine, with a large new underground operation and concentrator, was recently brought into\ production by Falconbridge Nickel Mines Ltd. The tailings disposal and water utilization proble
Jan 1, 1971
-
The Effect Of Frother Type And Concentration On The Water Recovery And Entrainment Recovery RelationshipBy J-P Franzidis
A study was undertaken to determine the effect of five industrial frothers on the relationship between entrainment recovery and water recovery. The experiments were conducted using a Batequip rectangu
Jan 1, 2000
-
OFR-47(B)-81 Thermally Induced Stresses In Explosion -Proof Electrical Enclosures With Windows ? Part 2 - Final Technical ReportBy Stephen E. Stewart
This document presents the explosion-proof enclosures used severity of certification tests solutions to linear transient thermal and stress analyses of in underground mines. The results were used to a
Jan 1, 1984
-
Coal Division ? Longwall ? Underground Mining I - Strata Control Simulation During Longwall Mining ? IntroductionBy Christopher Haycocks
Because of growing pressure from government and consumers to produce more coal, the mining industry must improve existing techniques and devise more efficient mining methods. Mining of the thicker, sh
Jan 1, 1979
-
Prueba de heterogeneidad y optimización de protocolos de muestreo para el mineral de Cerro VerdeBy Luis Alberto Medina
La característica principal de la composición de un cuerpo mineralizado es la heterogeneidad, dado que sus elementos no son iguales. En ese sentido, la prueba de heterogeneidad en el mineral de Cerro
Sep 13, 2001
-
Mines and Mineral Deposits of Canada<By R. P. D. Graham
It is almost exactly two hundred years since the foundations of the mining and metallurgical industries in Canada were laid. There '."'as nothing spectacular about this early start. It had t
Jan 1, 1924
-
Forecasting Drill Bit Consumption In Surface Drilling And Blasting OperationsBy J. L. Hoover
The goal of the drill bit consumption study was to develop an equation(s) based on various components that affect bit drill wear and use the equation(s) to estimate the consumption of bits during prod
Jan 1, 2012
-
The Minerals Workforce - Is There a Need to Develop a NZ Minerals Skills and Workforce Strategy?The New Zealand Minerals Industry is small but growing. Over the next 10 years it will be facing stiff international competition for skills to support this growth, particularly from Australia who are
Jan 1, 2007
-
Site Investigation, Instrumentation and Results of a Trial Embankment on Coal TailingsBy Morris P. H
A trial embankment was constructed using coarse coal mine reject on a deposit of crusted coal mine tailings at New Hope Colliery, located in the Bundamba District of the West Moreton Coalfields in Sou
Jan 1, 1990
-
Mine Mechanization and Costs at Copper MountainBy R. S. Douglas
Introduction The operations of The Granby Consolidated Mining, Smelting and Power Company, L1mited, have always been concerned with the mining of low-grade copper ores. In the fifty years of thi
Jan 1, 1950
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017