Search Documents

  • NIOSH
    OFR-175-82 Alternative Power-Line Proximity Warning Techniques

    By Frederick H. Raab

    A power-line proximity-warning (PLPW) system must have a high probability of detection (alarm activation at a specific distance), low probability of false alarm, and minimal set-up and maintenance. Te

    Jan 1, 1982

  • SME
    Geologists Add Value at Newmont’s Nevada Mines – Part One

    By Wayne Trudel, Lloyd McEvers, Lori Clarke, Eric Saderholm, Charles Lynn Bolin, Leroy Schutz

    Newmont mine geologists in Nevada are most proficient when applying technical expertise with multi-departmental teams in three main settings. The first is value creation through near-mine discovery, d

    Jan 1, 2004

  • NIOSH
    IC 8177 Oil Recovery By Miscible-Phase Displacement: A Bibliography ? Introduction (328bb1d3-3996-4ea1-925a-2089360bbaba)

    By L. K. Weaver

    The Bureau of Mines has started an engineering study of oil recovery by miscible-phase displacement. As a preliminary part of the investigation a literature and patent study was made to prevent duplic

    Jan 1, 1963

  • CIM
    A review of INCO’s mining automation efforts in the Sudbury Basin

    By P. V. Golde, R. A. Poole, G. R. Baiden

    "INCO is committed to proceed into the next century using automation and robotics to achieve safety and productivity goals necessary to enhance its competitive position. Stobie Mine, decades old, is t

    Jan 1, 1998

  • SME
    Newmont Cuts Costs and Increases Reserves at Carlin

    By Bruce D. Hansen

    For many years, Newmont has focused on improving its operations. After the merger between Newmont and Santa Fe Pacific Gold, Newmont created synergies of more than $50 million a year in Nevada. This

    Jan 1, 1999

  • SAIMM
    Quasi-chemical viscosity model for fully liquid slags in the A12O3-CaO-‘FeO’-SiO2system

    By A. Kondratiev

    A structurally-based viscosity model for fully liquid silicate slags has been developed and applied to the Al2O3-CaO-‘FeO’-SiO2system at metallic iron saturation. The model links the slag viscosity to

    Jan 1, 2004

  • IMMS
    Seafloor Backscatter Data: A Cost and Time-Effective Method for Exploration of Seafloor Massive Sulfide Deposits? A case study at the TAG district

    By Delphine Pierre, Jean-Marie Augustin, Anne-Sophie Alix, Charline Guérin, Cecile Cathalot, Yves Fouquet, Arnaud Gaillot, Ewan Pelleter, Carla Scalabrin, Florian Besson

    With the world’s growing demand for metals, seafloor massive sulfides (SMS) deposits are now seen as a possible mineral resource that could contributes to secure metal supply for human needs. SMS depo

    Jan 1, 2018

  • AUSIMM
    CRIMM - A New Process for Production of Directly Reduced Iron with Coal-Based Rotary Kiln

    By Sheng-Hui X

    This paper introduces a new coal-based rotary kiln process of DRI production - the CRIMM process, which is developed by Changsha Research Institute of Mining and Metallurgy in the past years. Its ma

    Jan 1, 1999

  • CIM
    Failure and downtime reporting — A key to improve mine equipment performance

    By J. Paraszczak

    High productivity of the equipment employed is one of the key factors in reducing production cost in mining. One of the best ways to achieve it is an increase in availability. In order to identify the

    Jan 1, 2000

  • SAIMM
    The Influence Of Mill Speed And Pulp Density On The Grinding Efficiency For Secondary Stage Grinding

    By J. Lux, B. Clermont

    Magotteaux, with the co-operation of Anglo Platinum, has erected a fully instrumented pilot plant at Frank concentrator, which is being used to study the influence of a variety of grinding parameters.

    Jan 1, 2004

  • DFI
    The Deep Cut-Off at the Walter F. George Dam

    "TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow

    Jan 1, 2014

  • NIOSH
    RI 8158 Seismic Detection of Trapped Miners Using In-Mine Geophones (bbd6751d-ec0a-4296-9101-992bc0fea64c)

    By James A. Powell

    A seismic system which utilizes in-mine geophones to detect trapped miners has been developed. Tests at the Bureau of Mines Safety Research Mine at Bruceton, Pa., and at two operating mines indicate s

    Jan 1, 1976

  • DFI
    Present To Future Design Considerations Of Deep Foundations ? 1. Introduction

    By William S. Gardner

    It is certainly an honor to have been invited to address the Deep Foundation's Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac

    Jan 1, 1991

  • AIME
    Association Work

    By J. WILLIAM WETTER

    WHEN the privilege was extended to me to address this meeting I could not help but make a mental review of my own activities and experiences in connection with association work. After having spent abo

    Jan 1, 1930

  • NIOSH
    RI 9237 - Evaluation of High-Pressure Front-Mounted Water Jets for Frictional-Ignition Suppression

    The U.S. Bureau of Mines conducted a laboratory study to determine what effect use of water-jet-assisted cutting has on frictional-ignition suppression. A single bit with a steel tip, installed on a r

    Jan 1, 1989

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • CIM
    Effective production monitoring in open pit mines: Beyond the technology

    By P. L. Richard

    An open pit a mine can be thought of as a business unit, with capital, operating and maintenance costs that exceed those of many large business enterprises. Truck-and-shovel operations have an inheren

    May 1, 2004

  • CIM
    Effective production monitoring in open pit mines: Beyond the technology

    By P. L. Richard

    An open pit a mine can be thought of as a business unit, with capital, operating and maintenance costs that exceed those of many large business enterprises. Truck-and-shovel operations have an inheren

    Jan 1, 2004

  • SME
    Oilwell Cementing: What Is Next?

    By A. Mahmoudkhani

    Primary cementing is the process of placing cement in the annulus between the casing and the formations exposed to the wellbore. Portland cement was first used in 1903 in the Lopoc Field in California

    Jan 1, 2012

  • NIOSH
    IC 9170 Cost Estimation Handbook For Small Placer Mines

    By Scott A. Stebbins

    This Bureau of Mines publication presents a method for estimating capital and operating costs associated with the exploration, mining, and processing of placer deposits. To ensure representative cost

    Jan 1, 1987