    Evaluation of Instrumented Cable and Rebar Bolts as Ground Support at a Trona Mine (958ba3b7-4ed1-4b81-9815-5e4d6ebd9ea2)

    By Lewis A. Martin

    Instrumented cable bolts developed at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health were used in conjunction with existing ground control systems to moni

    Jan 1, 2001

  • SME-ICGCM
    Case Studies Of Progressive Pillar Failure In Two Mines Using Wide Pillars

    By Hamid Maleki

    Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv

    Jan 1, 2000

  • SME-ICGCM
    Continuing Development of Innovative Cable Support Systems

    By John G. Oldsen

    Passive cable bolting and active cable trusses have been used in roof support for more than two years Excellent roof control has been experienced by many coal operations. This paper covers the new

    Jan 1, 1997

  • SME-ICGCM
    Load And Convergence Measurements In Longwall Faces And Design Guidelines For Face-Support Systems

    By Reha Ozel

    The stability in longwall faces depends on the interaction beman the roof strata, face supports and floor strata. The load distribution on the other hand, depends upon relative stiffness of the three

    Jan 1, 1990

  • SME-ICGCM
    Design Considerations for Tensioned Bolts

    By Yunqing Zhang

    The 3-D numerical modeling using ABAQUS is performed to analyze the mechanisms of the tensioned bolts by taking into considerations excavation sequence, pre-tension, bedding planes and in-situ horizon

    Jan 1, 2002

  • SME-ICGCM
    A probabilistic approach to ground support design in underground mines,

    By Kevin Beauchamp

    In many cases traditional support designs cover the many variations in ground conditions and bolt performance by a conservative factor of safety. The result is that most bolts are ineffectual most of

    Jan 1, 2003

  • SME-ICGCM
    Case Study Of Stability Investigations Related To Shallow Underground Mining Of Iron Ore In The United Kingdom

    By S. F. Smith

    Following a roof beam collapse on a major production district at the British Steel Corporation's Dragonby Iron Ore Mine, Scunthorpe, South Humberside, UK, rock mechanics investigations were under

    Jan 1, 1995

  • SME-ICGCM
    Stability And Control Of Immediate Roof Of Fully Mechanized Coal Face

    By S. Y. Liu

    Based on the underground measurements, physical model test of simulated materials in the laboratory and finite element analysis, this paper demonstrates the pattern and process of roof fall over the t

    Jan 1, 1990

  • SME-ICGCM
    New Design Criteria for Roof Bolt Systems

    By John C. Stankus

    From research started six years ago, a new design criteria has been developed for mine roof bolt systems This design criteria precisely and quantitatively determines parameters such as bolt length, in

    Jan 1, 1997

  • SME-ICGCM
    Behavioral Aspects of Roof/Rib Injuries--Implications for Training Utilizing Stereoscopic Photography

    By Edward A. Barrett

    A significant number of injuries resulting from fa118 of roof and rib may be avoided by modifying the reactive behavior of miners as they encounter potentially hazardous ground conditions. In 1984-85,

    Jan 1, 1986

  • SME-ICGCM
    Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)

    By Russell C. Frith

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b

    Jan 1, 1992

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal Bed

    By George Mishra

    In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco

    Jan 1, 1981

  • SME-ICGCM
    Pillar Design and Roof Support for Controlling Longwall Headgate Subject to High Horizontal Stresses

    By D. W. H. Su

    A two-year study was conducted by CONSOL in a northern West Virginia coal mine to evaluate pillar design and support requirements to improve roof control in right-hand longwall headgates subject to hi

    Jan 1, 2003

  • SME-ICGCM
    A Rock Mass Strength Concept For Coal Seams

    By George S. Kalamaras

    Coal strata strength is included as a vague term in most of the pillar design formulas, either as a questionable fraction of the intact coal strength or a size-dependent relationship for scaling down

    Jan 1, 1993

  • SME-ICGCM
    Application of Tensioned Cable Bolts for Supplemental Support

    By Ben Mirabile, Alan Campoli, Rodney Poland

    "The majority of U.S. underground coal mines use some form of cable bolt as supplemental support to a primary roof bolting system. Many coal operators employ the high load capacity of non-tensioned ca

    Jan 1, 2010

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    Some Factors Influencing Stability Of Longwall Gateroad

    Excessive roadway closure in the gateroads impedes the passage of equipment, supplies, personnel and ventilation air in longwall panels. This pager describes several factors that influence the gat

    Jan 1, 1994

  • SME-ICGCM
    Case Studies Of Depillaring Under Special Strata And Mining Conditions

    By P. R. Sheorey

    Four case studies of special geomining conditions from Indian coalfields are discuss- ed. These cases relate to (a) pillar extraction in two seams simultaneously under a difficult roof (Satpura I and

    Jan 1, 1988

  • SME-ICGCM
    The Utilization Of Rockbolting Technology And Monitoring Techniques In The German Coal Fields

    By Thomas Lautsch

    After a short description of geology and gateroad roof support technology in the German coalfields the development of roof bolting as primary roof support is presented. Based on geotechnical parame

    Jan 1, 2000