Geology Of The Helvetia Copper Deposit - ArizonaBy S. A. Anzalone
The Helvetia copper deposit is a large undeveloped Laramide porphyry copper system located in the Santa Rita Mountains, Pima County, Arizona. This porphyry copper system consists of four areas of copp
Jan 1, 1992
-
Material Handling For A Commercial Shale Oil PlantBy Robert B. Crookston
Oil from shale has been produced in foreign countries for more than a hundred years; however, except for short-lived, small operations, no commercial quantity of oil shale has yet been produced in the
Jan 1, 1975
-
The Place Of The Jigs In Modern Coal Preparation ? An Operator's ViewpointBy Michael P. Evans
Traditionally in coal processing jigs have been used to clean the coarse coal fraction, the +3/8" or +1/4" material. Today with the advent of modern fine coal jigs in the United States, its place was
Jan 1, 1983
-
Risk Mitigation In Global Mining DevelopmentBy Wayne W. Murdy
Since 1993, Newmont Mining has been growing through the development 'q of three major foreign mining operations with a fourth under construction. The first project, Yanacocha in Peru, began ope
Jan 1, 1997
-
Mining Through Old Underground Stopes at Mascot GoldBy C. O. Brawner, A. Bellamy, D. S. Cavers
Pit slope designs at Nickel Plate Mine have used relatively steep interim and final wall slopes of 60 degrees overall. The rock is unusually strong and tough with most discontinuity sets being steeply
Jan 1, 1988
-
Current Practices In Dimensional Stone Quarries Waterjets And Diamond Wire SawingBy T. Hall, R. Ferris
Waterjets and diamond wire saws have raised the productivity and lowered the cost in dimensional granite quarries. While the cost of diamond wire sawing is substantially lower than waterjet, the judi
Jan 1, 2004
-
Water Spray Systems For Reducing The Quartz Dust Exposure Of The Continuous Miner OperatorBy Robert A. Jankowski, Charles A. Babbitt, Natesa I. Jayaraman
The U. S. Bureau of Mines, through a contract research program with Foster-Miller, Inc., has identified guidelines for the selection of the most effective water spray system and water flow rates for u
Jan 1, 1987
-
Dewatering Uranium Mill Tailings ImpoundmentsBy Wayne Charlie, Joseph P. Martin
INTRODUCTION Typically, uranium mills produce slurred tailings which are transported by pipeline to a tailings impoundment. The slurried tailings contain about 250 solids (75% liquids) by volume an
Jan 1, 1980
-
Rapid Open Pit Design System - New System of Open Pit Design.By John McMorran
An open pit mine design system should have the characteristics of being flexible, versatile, and simple. All of these characteristics are necessary for producing a dynamic mine design. In other words,
Jan 1, 1982
-
Independent contractor fatalities in the mining industry: a look at contributing factorsBy E. A. Barrett, L. L. Rethi
Throughout all segments of the United States mining industry, 163 independent contractor employees were fatally injured between 1990 and 1997. Factors that contributed to these injuries were identifie
Jan 1, 2002
-
Soil Reconstruction And Land Use Planning Considerations For Texas Surface Lignite Mines - Reclamation PlanningBy D. G. Purdy
Planning, as defined in Webster's New Collegiate Dictionary, is a detailed program of action designed to achieve an end. When developing a detailed plan to incorporate all the complex activities
Jan 1, 1985
-
New Waterproof Shaft Lining Concept For Frozen Ground Applications ? IntroductionBy B. T. Stanley
Traditional methods of creating a water tight shaft liner involve the use of segmented or welded steel. When shafts are located in ground that exhibits extremely difficult conditions of high water in
Jan 1, 2012
-
Wolf Creek Upper Narrows Project–South Fork, Colorado, Construction of a Large Cross-Section Drill and Blast Highway Tunnel in Alpine Conditions with Multiple Staggered HeadingsBy Lyman File
This paper discusses the overall challenges to construct a two-lane highway tunnel located in southwestern Colorado on U.S. Highway 160 for the Colorado Department of Transportation by the Kiewit West
Jan 1, 2003
-
A Method to Design Optimum Pastefill Mixes Through Flow Cone and Mini Slump cone TestingBy Kugan Kuganathan
Pastefill is being increasingly considered as a viable fill by underground mine operators. Mount Isa Mines (MIM) chose pastefill to fill their deep copper mine (>1200m deep) after considering various
Jan 1, 2001
-
Cavern Response to Earthquake Shaking With and Without DilationBy M. Plesha, A. Zubelewicz, K. Connor, T. B. Belytschko, O&apos
INTRODUCTION The Northwestern University Rigid Block Model (NURBM) has been extended to explicitly model dilatant behavior of rock joints. By incorporating dilatancy, the resistance to shear displ
Jan 1, 1986
-
Maintaining The Proper Balance With Computer Aided Gear Train DesignBy John Carr
The tremendous growth in grinding mill size and horsepower during the '70s demanded advancements in gear cutting technology and equipment for the '80s. Computers are used as an aid in the
Jan 1, 1981
-
Discussion - Short Scale Spatial Variability Of Sulfur In A Coal SeamBy R. W. Barbaro, R. V. Ramani, K. V. K. Prasad, P. T. Luckie
Discussion by A. Unal Barbaro et al. (1990) implemented a tedious study aimed at delineating the short-scale spatial variability of sulfur in a coal seam. It is not possible, however, to extend the
Jan 1, 1992
-
Glauconite (c125cea5-13f8-4d25-89e7-69f61fb045e0)By Nenad Spoljaric
Greensand, greensand marl, and green earth are names given to sediments rich in the bluish green to greenish black mineral known as glauconite. The word glauconite is derived from the Greek word glauk
Jan 1, 1994
-
High-Energy Impact HammersBy Ivor Hawkes
INTRODUCTION High energy breaking is an alternative to using ex¬plosives in underground secondary breaking operations. It also is a means of upgrading conventional hand-held breakers, manual sledge
Jan 1, 1982
-
Exploration Forecasts and Exploitation Realities at the Woodsreef Mine, New South Wales, AustraliaBy Barrie Butt, V. S. Znamensky
The opportunity for an exploration geologist to follow a successful exploration project through the feasibility, financing, construction, development, and exploitation phase is rare. In addition, it i
Jan 1, 1986