Is The Mining Industry Ready To Go Green?By Michele Ashby
The mining industry is facing new risks from peak commodities, the energy and economic crisis and stock market pressures. The Green Mining Industry Initiative is a risk management strategy for the fut
Jan 1, 2008
-
Geostatistical Assessment And Quantification Of Uncertainity Of Methane In The Caved And Fractured Zone Of Longwall MinesBy C. Özgen Karacan
The formation of the gas emission zone in longwall mining and the potential amount of gas in this zone are factors of local geology and spatial variability within this geology. Therefore, geostatistic
Jan 1, 2012
-
Mine production scheduling optimization at Newmont?s Twin Creeks Mine (7465774a-78ae-4d2d-b25a-11e1b6274c11)By P. Kawahata
Newmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on-site facilities depending on ore type
Jun 1, 2013
-
Keynote highlights push for US mineral security and domestic production - ME Feature ArticleBy Carrie Smith
Leaders from the U.S. government and the global mining industry opened the MINEXCHANGE 2026 SME Annual Conference & Expo with a keynote session centered on restoring U.S. critical mineral production a
Apr 1, 2026
-
Achieving A Dry TunnelBy Vernon K. Garrett, Gerhard Sauer
INTRODUCTION Generations of tunneling engineers had to fight not only against bursting rock and squeezing ground but also against the destroying power of water. Intrusion of groundwater into the
Jan 1, 1987
-
Optimization Of The FGX Dry Separator For Cleaning High Sulfur Coal.By Baojie Zhang
The main goal of this study was not only to investigate the effectiveness of the FGX Dry Separator for removing pure rock from run-of-mine coal producing a better feed stock for conventional coal prep
Jan 1, 2012
-
Maintenance Scheduling And Inventory Control Computer Systems At The Iron Ore Company Of Canada ? I. IntroductionBy William V. Robinson
The Iron Ore Company of Canada mines, processes and ships crude iron ore, concentrate and pellets from the rich ore bodies of the Labrador Trough area in the extreme north-eastern part of Canada, some
Jan 1, 1975
-
The Value Proposition: High Annual Return On Investment, And Short-Term Payback Realized In Integrated Mining Processing Automation And Optimization Using IndustrialIT SolutionsBy M. C. Mound, E. Gallestey, C. Colbert
Continuous operating performance and high profit is one of the major concerns in the mining industry. Information systems are expected to reinforce and enable conformance to these requirements. The co
Jan 1, 2004
-
Modern Tunneling With A Tunnel Boring MachineBy Leo Wagner
In relation with the construction of the Sölk power station in Steiermark, Austria, tenders were called in October, 1976, for the construction of the 12-km "Donnersbach collector tunnel" by "Steirisch
Jan 1, 1979
-
Pillar Design and Coal Burst Experience in Utah Book Cliffs Longwall OperationsLongwall mining has existed in Utah for more than half a century. Much of this mining occurred at depths of cover that significantly exceed those encountered by most other U.S. longwall operations. De
Jan 7, 2020
-
Three Dimensional Geological And Resource Modelling Of The Lisheen Base Metal Deposit, Co Tipperary, Ireland.By John D. Elmes
The purpose of this paper is to describe the geology and the modelling work carried out to date. The Lisheen Zinc-Lead deposit was discovered in April, 1990. The deposit comprises two stratiform sul
Jan 1, 1998
-
Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, WashingtonBy Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson
A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR
Jan 1, 2005
-
Accelerated Weathering Of Limestone For CO2 Mitigation: Opportunities For The Stone And Cement IndustriesBy William H. Langer
Large amounts of limestone fines co-produced during the processing of crushed lime-stone may be useful in the sequestration of carbon dioxide (CO2). Accelerated weathering of limestone (AWL) is propos
Jan 1, 2009
-
Practical Application of Surfactants for Respirable Silica Dust Control - SME Annual Meeting 2024By Randy Reed, Barbara J. Arnold
Respirable crystalline silica poses a significant health risk, with the American Lung Association estimating that 2.3 million workers are exposed to silica in the workplace. This includes mine workers
Feb 1, 2024
-
Dust To GoldBy D. Marino
Over the last 20 years, the manufacturing sector of our country has been called upon to comply with ever core stringent environmental standards. The primary metals sector was particularly hard hit ea
Jan 1, 1992
-
Mining project evaluation process for investment decisions: Demonstration of the risk assessment model - part threeBy H. M. Park
Risk is a major factor in all mining activities, arising from many internal and external variables. The authors? research has resulted in a systematic method for the quantification of risk in mining p
Oct 1, 2013
-
Solution Mining At Searles Lake, Trona, CABy Stephen P. Mulqueen
Searles Lake is an evaporite basin located near the community of Trona in northwestern San Bernardino County, CA. Searles Valley Minerals Operations Inc. (SVM), a subsidiary of Nirma Limited, current
Jan 1, 2012
-
Large Grinding Mills - The Need For Good Specifications ? IntroductionBy John Berney-Ficklin
Large scale grinding mills can reduce both capital and operating costs for concentrators. These mills can be effectively used, but they must be free from design and manufacturing deficiencies if they
Jan 1, 1987
-
Movements Due to Freezing, Thawing and Tunneling Beneath Two BuildingsBy K. E. Wood, K. J. DiRocco, L. A. Becker
The Russia Wharf segment of the Silver Line Phase II Project for the MBTA incorporated ground freezing and underpinning during New Austrian Tunneling Method(NATM) tunneling through timber pile foundat
Jan 1, 2005
-
Engineering Risk Analysis Of Sand And Gravel OperationsBy Burton E. Gilpin, Dr. George W. Annadale
A two level risk analysis procedure which is specially designed for use in river environments, is presented. The first level risk assessment (Level I) is often adequate for purposes of most projects,
Jan 1, 1992