Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Implementation Of Advance Control On Rougher Flotation At Teck Pogo Mine - Preprint 09-119The Pogo Mine, near Delta Junction, Alaska is a 2500 TPD gold operation employing processes including grinding, gravity, rougher flotation, leach, CIP, and E/W. An OCS(Optimizing Control System) exper
Jan 1, 2009
-
Treating Refractory Gold OresBy Lane White
Refractory gold ores are those from which a significant percentage of the gold cannot be recovered by conventional cyanidation. Historically, roasting has been the primary method for rendering such or
Jan 1, 1990
-
Research on Blasting Damage Control of 90° Slit Charge Structure - Mining, Metallurgy & Exploration (2024)By Chenxi Ding, Chenglong Xiao, Guoli Shi, Zhiwei Zhao
This study investigates the directional blasting of a 90° slit charge structure using laboratory experiments and field tests. A 90° slit charge suitable for the corner of roadway is proposed. After th
May 23, 2024
-
Geochemical Prospecting For Gold In Alabama ? IntroductionBy John B. Gustavson
Gold was first discovered in Alabama in 1830. Before a decade had passed more than 20,000 people were employed in the various gold districts scattered across east-central Alabama. By 1849 most of the
Jan 1, 1975
-
Mine PreplanningBy Christopher J. Bise
INTRODUCTION Before a mine is planned in detail, a preliminary analysis is often conducted. This preplanning permits the mining engineer to make a rapid assessment as to whether or not a particula
Jan 1, 1986
-
Thinking Outside The Box- New Ways To Close Old Tailing BasinsBy B. Anderson, P. Churak, S. Dewar, A. Johnson, P. Eger
Although vegetation can be successfully established on fine taconite tailings, innovative approaches are needed to reclaim the coarse tailings used for dam construction. Through a series of cooperati
Jan 1, 2002
-
Use of high-efficiency electrical submersible pumps for mine dewateringBy K. Lang
The use of high-efficiency electrical submersible pumps (ESPs) for large scale, open pit mine dewatering operations provides a good example of how technology, products and services from the oil and ga
Sep 1, 2013
-
On The Lateral Stiffness Of Gearless Mill BearingsBy R. L. Guerguerian
Nowadays, most grinding mills driven by a wrap-around ring motor are operating successfully. Some of the earlier problems could be attributed to the lateral stiffness and stability of their bearings.
Jan 1, 2000
-
Utilizing Paste Technology For Reclamation Of The Ute-Ulay Upper Tailings Impoundments, Lake City, CO - Project BackgroundBy T. Tafi
The Ute-Ulay project area is located approximately five miles west of Lake City, in Hinsdale County, Colorado. The Ute-Ulay Mine site is approximately one mile east of the project area. The elevatio
Jan 1, 2011
-
Distinct Element Analysis for the Effectiveness of Preliminary Coal Pillar Rib Support Systems Based on the Strength Reduction Method Using Coal Mass Constitutive Model - Mining, Metallurgy & Exploration (2023)By MAURICE SUNKPAL, Taghi Sherizadeh, Kutay E. Karadeniz, Dogukan Guner, Samuel Nowak
Despite numerous empirical, numerical, and hybrid studies conducted on the subject of coal rib failure, mine fatalities related to rib failures continue to occur at around 1.5 per year between 2009 an
Aug 5, 2023
-
Study on Optimization of Stope Structure Parameters for Steeply Inclined Medium-thick Broken Ore BodiesBy Dongjie Zhang, Shuxin Liu, Jianduo Wang
Broken rock mass and unreasonable stope structure parameters can cause excessive ore loss and dilution in sublevel caving; this is the main problem faced by caving mining in recent years. This paper p
Mar 10, 2022
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005
-
Dynamic Simulation Of Processing High-Arsenic Copper Concentrates In A Fluidized Bed RoasterBy A. Rajoria
A dynamic process model for predicting the fluidized bed roasting of copper concentrates with high arsenic content is presented in this work. Mass and energy balances were performed based on roasting
Feb 23, 2014
-
Observation Methods Using Real-Time Surface Settlement Monitoring On The South Toulon Tunnel ProjectBy B. Caro Vargas
The Toulon Tunnel project is a key component of the highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig
Jan 1, 2012
-
Rheological Behaviors In Wet Ultrafine Grinding Of LimestoneThis paper investigates the effects of solids concentration and the addition of Dispersant S40 on the flowability of original and ground limestone slurries. A rotational viscometer with a concentric c
Jan 1, 2007
-
Selective Recovery of Manganese from Low‐Grade Ferruginous Manganese Ores Through SO2 Leaching (Mining, Metallurgy & Exploration)By V. K. Reddy Kallam, NEHA PANDEY, Sunil Kumar Tripathy, ARIJIT BISWAS
The study investigates SO2 leaching of low-grade ferruginous manganese ores to selectively recover manganese as MnSO4 and produce battery-grade electrolytic manganese dioxide (EMD). The effects of lea
Apr 20, 2022
-
Subsidence Potential In The Eastern Kentucky Coal FieldBy C. A. Johnson, K. F. Unrug
The identification of the major subsidence areas in the Eastern Kentucky Coal Field has been made to distinguish the subsidence phenomena on the basis of geographical location. Further, this identific
Jan 1, 1986
-
Pre-Failure Pillar YieldingBy J. F. T. Agapito, R. R. Goodrich
Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual
Jan 1, 2001
-
Discrete Simulations Quantifying the Effects of Material Handling Conveyors in Series or Parallel Oreflow StreamsBy K. J. Shelswell
This work describes the design, analysis, and comparison of discrete simulation and static spreadsheet models developed to compare the oreflow efficiency of two conveyor-based material handling system
Feb 23, 2014
-
The Effects of Detonation Wave Collisions on Rock Throw"Cast blasting is the primary means of overburden displacement in a surface coal mine. It serves two purposes; fragmenting the rock and throwing it directly to its spoil pile using explosive energy. I
Jan 1, 2017