Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Computer Optimization Of Vcr?s Miring Systems: An Application At Fankou Pb-Zn Mine, ChinaBy Song Xiaotian
Studies have been carried out to optimize the VCR's mining sys- tem on the basis of synthetic analysis at Fankou Pb-Zn mine in Southern China. The synthetic e- valuation method is proposed for se
Jan 1, 1986
-
Environmental Aspects Of Bauxite Mining In Western AustraliaBy B. A. Carbon
Western Australia is the largest state in Australia with an area one and three quarter times the size of Texas. Most of the State is desert or semi-desert, and only the southwest corner is heavily pop
Jan 1, 1984
-
5. On the Use and Validity of Probabilistic Methods in Mine Valuation ? IntroductionBy Howard M. Wells
The future is uncertain. In these circum- stances how can we rationally decide whether to commit funds to an investment that may or may not turn out to be successful? To date no certain answer to this
Jan 1, 1979
-
The Coal Quality Expert: Introduction To The Acid Rain AdvisorBy C. D. Harrison, G. S. Stallard
The 199O Clean Air Act Amendments specify national objectives for reducing sulfur dioxide emissions from coal fired power plants. System-wide reductions can be achieved by combining various emissions
Jan 1, 1993
-
Colloidal Stability of Bentonite Clay in the Presence of PolymersBy David McGregor, Ashoke SenGupta, Jerry Darlington
The stability of bentonite clay suspensions against flocculation in the presence of certain anionic polymers was investigated. These polymers included a purified sodium lignosulfonate, a sodium oxylig
Jan 1, 2003
-
Seismic tomography as a tool for measuring stress in minesBy D. K. Denton, D. F. Scott, T. J. Williams
Spokane Research Center personnel have been investigating the use of seismic tomography to monitor the behavior of a rock mass, de¬tect hazardous ground conditions and assess the mechanical integrity
Jan 1, 2000
-
Planning and Design for the Westside Light Rail Project Tunnels and Deep Underground Station in Portland, OregonBy D. S. McAllister, P. M. Rice, M. E. Fowler
The Westside Light Rail Project, a major 19.3-km (12-mile) extension of Portland, Oregon's light rail system, includes 4.6 km (2.8 miles) of twin 5.8-m (19-ft) diameter running tunnels, a binocul
Jan 1, 1995
-
Capacity Of High-Pressure Grinding RollsBy H. M. von Seebach, M. P. Trubeljal, L. G. Austin
Six US coals and a crystalline quartz were tested in an instrumented laboratory high-pressure grinding rolls machine equipped with 100-mm-diam. rolls. The machine was choke-fed to maximize the capacit
Jan 1, 1996
-
Use of residence-time distribution techniques to analyze industrial-scale froth-flotation circuitsBy B. J. Arnold, F. F. Aplan, R. R. Klimpel, E. C. Jr. Dowling
Residence-time distribution techniques are useful tools in the analysis, characterization and modeling of the performance of processing equipment and circuits. This paper presents the results of both
Jan 1, 2000
-
Molybdenum Treatment at Brenda MinesBy John Stroiazzo, Bernard C. Aubé
Brenda Mines, located 22 km Northwest of Peachland in British Columbia, Canada was an open pit copper- molybdenum mine which closed in 1990 after 20 years of operation. The primary concern in Brenda&a
Jan 1, 2000
-
Continuous material handling simulator: An application to belt networks in mining operationsBy R. V. Ramani, S. Tan
A computer-oriented systems simulator (CMHS) has been developed for analysis of continuous materials handling systems. Special emphasis has been placed in the model on several features that are unique
Jan 1, 1990
-
Phosphate Rock Dissolution Using Nitric AcidBy H. E. M. N. Moursy, M. N. Ahmad, C. R. Holland, G. M. Walker, R. D. Chandler
This work describes the effect of process parameters on the acidulation of Moroccan phosphate rock using nitric acid, i.e., the nitro-phosphate process. A series of bench scale experiments were conduc
Jan 1, 2002
-
Concentration And Characterization Of Titanium Minerals And Zircon From The Western Black Sea Coast Sands Of TurkeyBy M. Akser, F. L. Pirkle, B. W. Stratford, B. Ipekoglu
To date, no ilmenite, rutile and zircon deposits of commercial importance have been reported in Turkey. However, information from recent reconnaissance activities indicates the possibility of an econo
Jan 1, 1997
-
Removal of metal ions by nonliving water hyacinth rootsBy R. W. Smith, M. C. Fuerstenau, G. X. Xang
Nonliving dried water hyacinth (Eichhornia crassipes (Mart.) Solms) roots were investigated for the biosorption of cadmium, lead and other heavy metal ions from aqueous solutions. Dried water hyacinth
Jan 1, 2000
-
Reduction of taconite concentrates in a cyclone reactorBy M. Abdel-latif, R. W. Bartlett, P. R. Taylor
A cyclone reactor system for the partial reduction and melting of taconite concentrate fines was designed and operated. A nontransferred arc plasma torch was employed as a heat source. Taconite fines,
Jan 1, 1995
-
1.2 Planning for Mining Information Systems - IntroductionAn information system (I/S) plan is a means for establishing and communicating the direction the organization intends to take to provide the information required for achievement of organizational goal
Jan 1, 1979
-
Small Scale Placer MiningBy James L. Noble
A small placer operation can be defined as one with a throughput capacity of 250 cubic yards an hour or less. The success of small placer operations after the values have been established, depend enti
Jan 1, 1992
-
Restoration Of Sloping Tailings From Asbestos Mining In Kozani Prefecture, GreeceBy C. Tsatsanifos
Following closure of an old asbestos mine in Zidani, Kozani Prefecture, Greece, the geotechnical and environmental restoration of the tailings slopes was required. The geotechnical aspects of the rest
Jan 1, 2006
-
The mass transport of slurry and solid in a laboratory overflow ball millBy R. Hogg, L. G. Austin, R. C. Klimpel
Slurry densities and holdup were measured for open circuit grinding tests in a laboratory overflow ball mill of 0.3 m diam by 0.6 m long, by emptying and drying after stoppage of the mill. Contrary to
Jan 1, 1990
-
Riverside Badlands Tunnel, Inland Feeder Project: The Challenges Between Concept and CompletionBy John Waggoner, Steve Klein, John Townsend, Jay Arabshahi
The Riverside Badlands Tunnel is a 13 km (8 mile) long segment of the Inland Feeder Project. This 3.65 m (12 ft) finished diameter water tunnel presented many challenges that had to be overcome to tak
Jan 1, 2003