Surface Mining Methods Employed in the United States Coal FieldsBy Mark A. Williams
Topography and geology greatly impact the decision of how to plan and operate a surface mine. To extract coal, five primary surface mrning methods are practiced in the United States. These include con
Jan 1, 1991
-
Overburden Blast Cast Designs, Economics and Case HistoriesBy Conny Postupack
The first principle one usually learns about blasting is that competence in this field is best gained by experience in making blasts rather than by reading a book or by listening to a lecture. The rea
Jan 1, 1991
-
An Investigation of The Characteristics of Linear Shaped Charges Used in DemolitionBy Paul Worsey, Seokbin Lim
There are two major types of shaped charges, conical and linear (Ref 1, 2). Conical shaped charges are used to perforate targets and are mainly used by the military as anti armor weapons and by the oi
Jan 1, 2003
-
Blast Designs and Instant Diagnostics Using the SVC500 Digital, High-Speed Smart Video Camera SystemBy Bruce Vandenberg, Andy Battfay, Don Lake, Steve Conway, Jeff Yorsz
"High-speed motion pictures are an invaluable resource for blasting analysis. Whether processed by the human eye or a computer, this imagery can provide important insight into a blast and its effects.
Jan 1, 1994
-
Blasting in the New Mellinnium: On the Road to ProfessionalismBy Steve Dillingham
Blasting crews, explosive product drivers, drillers, blasters, supervisors, and salespeople all arrive daily at customer blast sites in vehicles of every type whether passenger cars, pickup trucks, or
Jan 1, 2003
-
Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge (aa576ad1-736a-4e7e-9977-8fe1a93c21b3)By Jason M. Ryan, T Michael LeBlanc, John H. Heiiig
Drill trajectory deviation is a recurring problem in the Mining Industry retreat stoping operations. As a result of this deviation, it is quite concevable that 60 kg (165 mm 0) and 103 kg (203 mm 0) e
Jan 1, 1995
-
Innovative Blasting Mine Life Extension at a Coal Mine in AustraliaBy R. Bitmead, R Barker, A. Drake
The opencut coal mine is located about 50 km west of Brisbane, the capital city of Queensland in Australia and produces about 140 000 tonnes per annum of high grade steaming coal utilising a small tea
Jan 1, 2002
-
Stratablasttm - A New Mining MethodBy T Goswami
The conventional practice in open cut coal strip mining has been to blast the overburden or coal layers in separate blast events. This is done in order to maximise the benefits from throw blasting and
Jan 1, 2006
-
Vibration Control in a Tunnel Project under an Existing HospitalBy Pertti Paavola, Hikki Rasanen
This paper describes a very exacting tunneling project. Planning and technical realization of this service and transportation tunnel was especially difficult as a matter of vibration control, because
Jan 1, 1997
-
Cautious Blasting in Critical Areas at Ramagundam Super Thermal Power StationBy N. Jayaraman, V. Srikant, A. Radhakrishna
Addition of a 500 MW unit to the existing units at Ramagundum Thermal Power Station requires blasting of large volumes of rock very close to sensitive installations like Turbo generator, Generator tra
Jan 1, 2003
-
BLASTCAD Three Dimensional Underground Blast Design SoftwareBy David Sprott, Patrick Andrieux
In 1990 the Noranda Technology Centre commenced a project to develop an interactive three-dimensional blast design system using a commercial computer-aided drafting and design package (CADD). The obje
Jan 1, 1991
-
3000t Controlled Chamber Standing ShotBy He Guangyi
Combining living examples, the paper introduces the controlled chamber standing shot of more than 3000t explosives initiated at one time with Nonel under complicated circumstances and the experience o
Jan 1, 1998
-
Blasting Trials to Control and Monitor Displacement of Narrow Vein Gold OreBy P Geddes, K Grohs, C K. McKenzie, M Morrish
Low grade surface gold mining at the Acacia Resources, Union Reefs Gold Mine in Australia's Northern Territory, involves the excavation of benches in three slices after blasting. Blast patterns span z
Jan 1, 1998
-
Destructive Wave Interference in Underground Blasting Utilizing Precise Timing.By Kurt Oakes, Paul Worsey, Braden Lusk, Tony Brasier, Jerry Chambers, Scott Crabtree, Randy Wheeler
Destructive wave interference has been studied in theory for many years. In application however, limited information can be found. Recently, circumstances have enabled a multidisciplinary team to util
Jan 1, 2006
-
A Study on Post Blast Generation of Nitrogen DioxideBy : D. Lawrence
Certain blasting applications are more prone to the generation of significant levels of nitrogen dioxide post blast fumes, more commonly referred to as after blast smoke, generally ranging in color fr
Jan 1, 1996
-
Modified Site Response Blasting: The Role of Rock Mechanics in Perimeter ControlThis paper is written in response to a request from the UTRC Committee on Perimeter Control Blasting. That Committee is conducting "follow-on" research on the selection of appropriate blasting designs
Jan 1, 1984
-
Seismic Refraction Surveying Techniques for Use in Blasting Design Optimization and Explosive SelectionBy John Dean Smith
"In many operations the two most overlooked aspects in the drilling and blasting process is theblast optimization and explosive selection. Often times we find a blast design that seems to work andprod
Jan 1, 1995
-
Modified Case Charge for Avalanche ControlBy Eduardo Lozano, Vilem Petr
This paper provides an overview of a new method for avalanche control using a high explosive charge placed at the avalanche runout zone: the case charge technique. This new avalanche control technique
Jan 1, 2018
-
Farmers Catalog, How to Remove Stumps with Du Pont High ExplosivesBy Robert Hopler
In issuing this pamphlet on stump and boulder blasting for the use of farmers, we wish to call attention to the fact that Du Pont High Explosives have been used with universal satisfaction for many ye
Jan 1, 2008
-
Controlled Demolition of a Reinforced Concrete Building in Seoul, KoreaBy Kwang-Tae Kim, Yong-Kun Choi, Jeong-Soo Chong, Yun-Jae Lee
An annex building at the former Agency for National Security Planning(NSP) complex located in downtown Seoul was demolished by progressive collapse method. This work was done as a part of efforts to r
Jan 1, 1998