Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Effect of Calculated Explosive Energy Output on Blast Design

    By P D. Kasbanis, Lyall Workman

    "The energy output of an explosive is typically calculated using an equation of state and computerapplications. Results are reported as weight and bulk strength, either in absolute terms or relative t

    Jan 1, 1996

  • ISEE
    Assessment of Perimiter Blasting at the Homestake Mine

    By J Deen, P Sterk, W Forsyth

    Homestake Mining Company has made a firm commitment to develop a functional and cost effective perimeter blasting program. The goal of the program is to develop smooth, sound walls in all development

    Jan 1, 1997

  • ISEE
    Site Specific Blasting Model Using Schmidt Tensile Strength and Image Analysis

    By K. M. Kim, J. B. Kemeny

    A case study was conducted with 5 shots with varying pre-blast block sizes and explosive energies. From this case study a site-specific predictive fragmentation model was developed. There are two main

    Jan 1, 2011

  • ISEE
    *Kuz-Ram and Digital Image Processing System Combination to Determine Specific Blasting Parameters

    By A. Karadogan, G. Tuncer, A. Kahriman

    Determination of optimal blast parameters have been the priority act for blasters on the field due to financial and technical properties of the operation. Therefore many researchs were done to establi

    Jan 1, 2005

  • ISEE
    Presplitting and Controlled Blasting Techniques, Including Air Decks and Dimension Stone Criteria

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1991

  • ISEE
    Optimization of Blast Fragmentation Curves and Determination of Rock-Blast Domains at Coimolache Mine, Based on Rock Factor Criterion and Kuz-Ram Model

    By Luis Huaroc, Augusto Sotomayor, Erick Rodriguez, Paulo Fernández, José Ricaldi, Luis Alejandro

    The application of the Kuz-Ram model for the prediction of fragmentation is used worldwide, in Coimolache Mine it was used to determine blast domains and optimize the process by obtaining drilling pat

    Feb 1, 2020

  • ISEE
    Blast Design and Diagnostics Using, Portable Solid State, High-Speed Videography Systems

    By Laura Bustemante, Bruce Vandenberg, Fred Huettig

    Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 8 seconds of data can

    Jan 1, 1998

  • ISEE
    Rock Spillover Interaction Between Two Active Mining Sectors

    By R. J. Cefalo

    Blast and mining spillover between phases or critical areas of the pit is a continuing problem in the mining industry and a safety concern for operating mines. The challenge for many mines is to produ

    Jan 1, 2024

  • ISEE
    Practical Experiences with the Use of Air-Decks in Quarry Blasting

    By Peter Moser, Frank Chiapetta, Sacha Diaj, Florian Bauer

    Good toe breakage and a flat working bench after blasting are important parameters to achieve a high productivity during material loading and reduce the necessity for secondary blasting. Good toe brea

    Jan 1, 2009

  • ISEE
    Determination of Blast Vibration Limits by Direct Strain Measurement

    By Adrian Moore, Alan Richards, Andrew Brodbeck

    Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str

  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders (52912f89-42e4-4811-8c7f-344764181b42)

    By Daniel Hauer

    Blocking. (5) The “blocking” of boulders is a much cheaper way of breaking them up than “mud capping.” It should always be used in preference to that method except when too much time will be consumed

    Jan 1, 2006

  • ISEE
    Case Study and Hands On with the New DSL2 Electronic Initiation System

    By Thierry Bernard, J. M. Laboz

    2000 HIGH-TECH SEMINAR Blasting Technology, Instrumentation and Explosives Applications

    Jan 1, 2000

  • ISEE
    Blasting 1 Million Tons, 205 Meters from a Town

    By Thierry Bernard, Guy Gagnon

    Blasting at very close proximity to urban areas is typically a situation where both local communities and mining stakeholders get nervous. The context becomes logically even more tensed when the blast

    Jan 1, 2014

  • ISEE
    The Construction and Testing of a Polycarbonate Safe Haven Wall

    By Braden T. Lusk, Rex A. Meyr, Kyle A. Perry

    Following three major mining accidents in 2006, the MINER Act of 2006 was enacted by MSHA and required every underground coal mine to install refuge alternatives to help prevent future fatalities of t

    Jan 1, 2014

  • ISEE
    Journal: Summary of Amendments of ADR concerning the Transport of Explosive Materials in the EU

    By Rolf Schillinger

    Transport of Small Quantities of Explosives Material on Public Roads The transport of dangerous goods on public roads is extensively regulated by EU and national law. The transport of explosive materi

    Jan 1, 2010

  • ISEE
    Compromising Technology with Field Expedience in Fragmentation Evaluation

    By Jason M. Ryan

    "Along with recent advances in computer technology have come cost-effective systems desiiedto evaluate fragmentation distributions through digital images of particles. In mining operations andmineral

    Jan 1, 1998

  • ISEE
    Overburden Blast Cast Designs, Factors Affecting Results and Economics

    By Connie Postupack

    The purpose of the workshop is to show the effect of various blasting factors on the overall results.

    Jan 1, 1994

  • ISEE
    Percussive Drilling Theory and Practice

    By Pat McLaughlin

    Environmental constraints are pushing many operators to change from large rotary blastholes to the smaller diameter holes drilled with down-hole or top-hammer rigs. Productivity improvements over the

    Jan 1, 1995

  • ISEE
    Oversize Reduction Project at the Iron Ore Company of Canada (Full Article)

    By Rodney Pinksen, Remi Proulx

    The IOC Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1.0 m x 1.0 m x 1.0 m; 39 inches x 39 inches x 39 inches) being produced and its subsequen

    Jan 1, 2011

  • ISEE
    Recruiting, Retaining, and Integrating Future Talent For the Explosives Industry

    By Joshua Hoffman

    The recruitment and retention of future talent into the explosives industry is becoming increasingly important. Student chapters help with this effort but what are they doing and are there things they

    Jan 1, 2013