Post-Liquefaction Settlement Reduction Due to Vertical Reinforcement of Aggregate PiersBy Francisco Humire
Contemporary design criteria for ground improvement supporting structures frequently specify a maximum post-liquefaction reconsolidation settlement value. Typically, those settlement values are evalua
Oct 7, 2024
-
Deep Excavation for Loop PitBy Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De
"This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t
Jan 1, 2015
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
Installation Effects of Drilled Screw Pile In Soft ClayBy Jianhua Wang, Jianming Yao, Zhen Meng, Jinjian Chen
"Drilled screw pile is a newly developed displacement pile foundation which has been applied in soft clay for many years. Compared with traditional circular displacement pile, It is characterized by h
Jan 1, 2015
-
Axial Behavior Of Auger Cast Piles In Inner Coastal Plain GeologyBy Brain E. Ladd
A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
-
Diaphragm Walls for Seepage Control and Remediation: Three Case HistoriesBy Fabio Santillán, Mario Mauro, Raffaella Granata
"This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis
Jan 1, 2016
-
Full Scale Uplift Load Testing of Micropiles in Cohessionless SoilBy M. Hesham El Naggar, Maged A. Abdlrahem
"Hollow bar micropiles have constructional advantages such as: fast and low-noise and low vibration installation process and small installation equipment, which allow access to tight places. In additi
Jan 1, 2016
-
Thermal Integrity Profiling Of Drilled ShaftsBy Gray Mullins
The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo
Jan 1, 2010
-
Axial Behavior of Auger Cast Piles in Inner Coastal Plain Geology (0a0de455-b1b9-4e2a-a87b-f9c3f26892a7)By Brian E. Ladd
"A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
Jan 1, 2017
-
Dynamic Pile Monitoring For Offshore Pile AcceptanceBy Scott Webster
Dynamic pile Monitoring Services (DMS) have been used for testing of offshore piles for several decades. However, most of this testing was to measure hammer performance and pile stresses rather than
Jan 1, 2010
-
Kosciuszko Bridge Main Pylon Deep Foundation SolutionBy A. Daugiala, D. Coleman
In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E
Jan 1, 2016
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Foundation Design And Construction Challenges For The Phoenix Sky Train ProjectBy John C. Niedzielski
The PHX Sky Train is a five mile long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drill
Jan 1, 2010
-
Prediction of Axial Geotechnical Resistance of Base Grouted Drilled ShaftsBy Emad Farouz, Ehab S. Shatnawi
"The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilledshaft diameters has motivated the development and increasing use of a base grouting (BG) techniq
Jan 1, 2016
-
Design And Performance Evaluation Of A Grouting Program In Weak Rock MassesBy George Moses K, Mahendran K
Grouting is performed in rock masses in order to increase its strength properties and also to reduce the seepage. In the design of underground structures such as tunnels or caverns located in weak roc
Nov 1, 2022
-
p-y Curves For Analyzing Micropiles in Sandy Soils Using Lateral Load Test DataBy Mahdi Soudkhah, Akhter Hossain
Vertical micropiles are generally considered to be low in lateral resistance. Therefore, battered micropiles are often used when additional lateral load carrying capacity is required. However, batteri
Jan 1, 2019
-
Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, GeorgiaBy Cheng Lin, Guoming Lin
"This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (
Jan 1, 1900
-
Large Diameter Auger Cast Piles At Audi Field, Dc United's New Soccer StadiumBy Christophe H. Locussol
D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system cons
-
Performance Of Stone Columns In Multi-Layered Soils Under The Action Of Seismic LoadsBy P. Kiruthika, A. Murali Krishna
Soil liquefaction is a dangerous phenomenon that involves huge damages during strong earthquake ground motion event. Stone columns (SCs) are widely used as liquefaction mitigation element which is exp
Sep 1, 2022
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling MethodBy Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015