Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc

    By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey

    Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and

    Oct 1, 2022

  • DFI
    Adapting Multiple Ground Improvement Techniques for Uniform Performance over Heterogeneous Natural and Modified Overburden

    By Michael J. Marasa

    "Geotechnical engineering and construction primarily relies on the subsurface characteristics of the particular site; however, obtaining both accurate and precise information on those features is chal

    Jan 1, 2017

  • DFI
    Design and Construction Recommendations for Driven Piles in Intermediate Geomaterials

    By Shaun Wulff, Kam Weng Ng, Nafis Bin Masud, Opeyemi Oluwatuyi

    Pile foundations are often driven in intermediate geomaterials (IGMs) to attain higher resistances in order to meet the increasing load demand, satisfy Load and Resistance Factor Design (LRFD) specifi

    Oct 31, 2023

  • DFI
    Pile Inspector's Guide To Hammers ? Introduction

    The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding

    Jan 1, 1995

  • DFI
    Case History: Comparison of CSL Results to Physical Observations

    By David S. Graham, Paul J. Axtell

    Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b

    Jan 1, 2019

  • DFI
    Building Risk Assessment For Urban Rail Transit Systems In India - Current Practices And Challenges

    By Manchanda H, Agarwal J.

    The construction industry has one of the largest numbers of injuries compared to other industries. Thus, reducing accidents and determining construction risks are extremely important. One of the essen

    Sep 1, 2022

  • DFI
    A Ten-Year Perspective of Jet Grouting: Advancements in Applications and Technology

    By Gary T. Brill

    In the presentation, the development and new applications of the jet grouting technique in the North America are briefly introduced at first and followed by the outline and advantages of Jet Grouting.

    Feb 10, 2003

  • DFI
    30 Hudson Street Foundation Design and Construction in Variable Rock

    By Joel Moskowitz, George J. Tamaro

    "A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s

    Jan 1, 2004

  • DFI
    Augered Cast-In-Place And Continuous Flight Auger Pile Foundation Systems For US Highway Projects - Why ACIPICFA Pile Foundations?

    By Silas C. Nichols

    FHWA Interest is due to: ? An increase in successful projects in the U.S. private sector and in other countries ? Cost effective and more efficient in many circumstances ? Agency Prioritie

    Jan 1, 2005

  • DFI
    SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction Event

    By Richard T. Stain

    "In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred

    Jan 1, 2005

  • DFI
    Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle East

    By Brian Metcalfe, Kord Wissmann, Gianni Martinez

    The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large

    May 1, 2022

  • DFI
    Building Class a Development Over Landfill

    By Omar Conte, Feng Lu, Roger A. Archabal

    The Sole Mia development is located in an area of North Miami, Florida currently undergoing revitalization that started in 2015. The overall site sits atop 184 acres of a former municipal waste landfi

    Oct 31, 2023

  • DFI
    CPT Methods for Helical Pile Design

    By Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter

    Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu

    Sep 8, 2021

  • DFI
    Instrumented Load Testing and Construction Monitoring of Rigid Inclusions at Seattle’S Georgetown Wet Weather Treatment Station

    By Karen Dawson, Qiang Li

    Unreinforced displacement augercast piles, or rigid inclusions (RIs), were installed for foundation support of a combined sewer overflow treatment building. The RIs penetrated loose silty sand and sof

    Oct 31, 2023

  • DFI
    Reclaiming Deep Quarry Lakes in South Florida – A Geotechnical Perspective

    By Omar Conte, Roger Archabal

    In recent years, numerous developers have invested in former deep quarry lake sites, particularly to develop massive new logistics and residential projects in South Florida. Due to the flat geology en

    Oct 7, 2024

  • DFI
    Redevelopment of the Oyster Point Landfill, South San Francisco, California

    By Cary E. Ronan, Tyler Toledo, Justin Ray

    The Oyster Point development is located near the San Francisco Bay margins in South San Francisco, just north of the San Francisco International Airport. The eastern peninsula of Oyster Point was form

    Oct 31, 2023

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    Collaborative Value Engineering Redesign - DFI 2020

    By Martin Mcdermott, Kevin Tehansky, Robert Ross, Jeffrey Goodwin

    A foundation value engineering redesign is a collaboration between the project owner, original design team, general contractor, foundation contractor and redesign team. Without the acceptance and coll

  • DFI
    Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)

    By Donald R. Clark

    "Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

    Jan 1, 2017

  • DFI
    Optimization Of Design Of Drilled Shaft Foundations By Lateral Load Testing

    By Donald R. Clark

    Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re