  • DFI
    Load Testing High Capacity Drilled Shafts - Summary

    By Jorj O. Osterberg

    Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a

    Jan 1, 2002

  • DFI
    Foundation Stabilization of the Morris Island Lighthouse

    "The Morris Island Lighthouse (MIL) is located between the jetties leading to the Charleston Harbor and Folly Beach, S.C. The present structure is the third lighthouse to occupy this location. The fir

    Jan 1, 2017

  • DFI
    Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical Consultant

    By Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell

    In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur

    May 1, 2022

  • DFI
    Load Testing Of Steel Sheet Piling Driven With A Vibratory Hammer

    By Drew Floyd

    Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi

    Jan 1, 1989

  • DFI
    Foundation Rehabilitation of the Henry Hudson Bridge

    By Dharmil S. Patel, Zoyav S. Benyaminov, Cassandra A. Wetzel

    Rehabilitation of the Henry Hudson Bridge is nearing completion, connecting Spuyten Duyvil in the Bronx to Inwood Hill in Manhattan, New York. Constructed in 1936, the Henry Hudson Bridge spans 840 fe

    Sep 8, 2021

  • DFI
    Application of Non-Destructive Testing to Drilled Shafts

    Technically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde

    Jan 1, 2004

  • DFI
    Willow Island Hydroelectric Project: Taming the Ohio River to Create Green Energy

    By James M. Tantalla, Jr. Ellman

    "Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff

    Jan 1, 2016

  • DFI
    Consultants Can Be Safe, Too – A Collaborative Approach

    By Brian FitzPatrick, Michael J. Weaver

    Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration

    Jan 1, 2019

  • DFI
    House & Commercial Building Foundation - Introduction & History

    By Roger A. Bullivant

    As the UK's foremost domestic foundation underpinning contractor over the last 25 years it has become abundantly clear that the size of the repair market, some £500m per annum is a significant wa

    Jan 1, 1995

  • DFI
    “Value Engineering” — Four Case Histories

    By Maral Papazian Bedian

    "Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans

    Jan 1, 2003

  • DFI
    Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase Ii

    By Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.

    The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris

    Nov 1, 2022

  • DFI
    Designing Piles for Seismic Events

    By H G. Poulos

    "This paper sets out a simplified approach by which the practical foundation designer can undertake the relevant calculations to satisfy the requirements for deep foundation design in seismic areas. T

    Jan 1, 1900

  • DFI
    Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution Imaging

    By Gerald Verbeek, Erick Baziw

    Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T

    Oct 1, 2022

  • DFI
    Detecting Cement Mixing Pile with Cone Penetration Test in the Reserved Hole

    By Wu Jian-tao, LI Guo-wei

    "The Cement Mixing Pile (CMP) quality assurance assessment is an important programme in evaluating the efficiency of foundation improvement. Coring is the current specified method of quality assessmen

    Jan 1, 2015

  • DFI
    Foundation Reuse Is the Future

    By Andy Boeckmann

    Engineers and owners widely recognize the benefits of foundation reuse - cost savings, reduced construction schedules and reduced environmental impacts, among others. Yet for many projects with existi

    Jul 1, 2022

  • DFI
    Integrity Testing Methods

    "Integrity tests refer to a variety of non-destructive tests (NDT) whose purpose is to measure or determine the quality and uniformity, and some- times dimensions, of cast-in-place concrete foundation

    Jan 1, 2004

  • DFI
    Design Methods For Earthquake-Induced Pile Bending

    By George Mylonakis

    The curvatures and subsequent bending imposed to piles by the surrounding soil during the passage of strong seismic waves is studied. This type of bending develops even in the absence of a superstruct

    Jan 1, 2002

  • DFI
    St. Croix Bridge, Minnesota: The Influence of Construction on the Axial Resistance of Drilled Shaft Foundations in Weak Sandstone

    By William G. Ryan, David S. Graham, Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "The St. Croix River Crossing project on the Minnesota-Wisconsin border has been in the process of planning and public debate for two decades, with several changes in alignment. During the course of t

    Jan 1, 2015

  • DFI
    Meadowlands Megaproject: 9,000 Piles and Counting

    By Ronald D. Boyer

    "Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,

    Jan 1, 2009

  • DFI
    Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47)

    By Ilhan Chang, Ernest Nsabimana, Kiseok Kwak, Juhyung Lee, Young-Hoon Jung

    "Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silt

    Jan 1, 2017