    Development of Lattice-Shaped Cement Treatment Method for Liquefaction Countermeasure

    By Seiji Mizutani, Hirofumi Taguchi, Makoto Yoshida, Hidenori Takahashi, Naotoshi Shinkawa, Kazuo Konishi, Yoshiyuki Morikawa, Masaya Kawata

    "The lattice-shaped cement treatment method has been used to improve the seismic performance of liquefied sandy soil in Japan. The efficacy of the method has been confirmed by the huge earthquake in J

    Jan 1, 2015

  • DFI
    Complex Piling Works At London Blackfriars Station

    By Jamie D. McEwan

    To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui

    Jan 1, 2011

  • DFI
    A Simple Solution For Slope Stabilization Using Micropiles

    By Dan Brown

    A method is outlined for computing the contribution of a micropile group to global stability of a sliding mass. The forces in the micropile are computed in a way which accounts for the effect of soil

    Jan 1, 2007

  • DFI
    Permanent Displacement And Pile Driving Vibrations - Summary

    By Charles H. Dowding

    Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta

    Jan 1, 1991

  • DFI
    Base Grouted Piles - Mr. P. M Cashman, Independent Consultant

    By W. J. Kingwell

    My comments and questions are addressed to Mr. Troughton. It seems to me that the tests were very well tailored to determine long term effects on performance of bearing piles as groundwater pressures

    Jan 1, 1991

  • DFI
    Comparison Between Statnamic And Static Load Testing Of Drilled Shafts In Varved Clay

    By Carl Ealy

    Static and STATNAMIC (STN) rapid load test (RLT) was performed on 3-drilled shafts. The purpose of the RLT part of the study was to obtain data in support of FHWA research on innovative load testing m

    Jan 1, 2002

  • DFI
    Deep Foundations In Hong Kong - Synopsis

    By Martin Pratt

    This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr

    Jan 1, 2000

  • DFI
    Overview of Construction and Design of Auger Cast-in-Place and Drilled Displacement Piles

    By Monica Prezzi

    "Auger cast-in-place (ACIP} piles and drilled displacement piles are being increasingly used as foundation elements for structures, particularly in projects requiring accelerated construction or invol

    Jan 1, 2005

  • DFI
    An Evaluation of t-z Analysis Methods

    By Kirk Ellison, Sherif Elfass, Ramin Motamed, Kevin V. Stanton

    "The determination of accurate load transfer curves are essential for estimating deep foundation loadsettlement response using t-z style analyses. While recently developed semi-empirical methods from

    Jan 1, 2017

  • DFI
    Anchored Diaphragm Wall and Dewatering System for Libya Hotel

    By Claudio Asioli

    "The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima

    Jan 1, 2017

  • DFI
    Anchored Diaphragm Wall and Dewatering System for Libya Hotel

    By Claudio Asioli

    "The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima

    Jan 1, 2017

  • DFI
    Sustainability Assessment of Deep Foundations: Case Study

    By Krishna R. Reddy, Jyoti K. Chetri, Girish Kumar

    Geotechnical engineering encompasses a major portion of the civil and infrastructure projects. The large amounts of energy and resources typically used in these projects leads to undesirable emissions

    Jan 1, 2019

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • DFI
    A Cut And Cover In Stiff Clay In Eurre-France - Synopsis

    By R. Stenne

    This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly

    Jan 1, 2000

  • DFI
    Value Engineering Through Systematic Site Investigation and Design Optimization – A Case Study

    By Lu Yitan, Frances Badelow, Manish Tiwari

    "Large ‘design and construct’ projects often present significant geotechnical risks. However, these also present significant opportunities for value engineering in design. These opportunities can be r

    Jan 1, 1900

  • DFI
    Analysis Of A Deep Excavation In Calgary, Alberta

    By Thomas Lardner

    Excavation for The Bow, EnCana, in downtown Calgary, occurred between May 2007 and September 2008. A monitoring programme was used to determine the behaviour of the shoring wall, soil and bedrock dur

    Jan 1, 2010

  • DFI
    Collaborative Alliances – A Sustainable Way Forward For Construction?

    By Stefano Trevisani

    Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,

    Jan 1, 2014

  • DFI
    100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage

    1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution

    Jan 1, 1994

  • DFI
    Unconventional Solutions For Construction Of A Hybrid Cut-Off Wall At The Dead Sea

    By Karsten Beekhaus, Sander W. Odijk, Rabea Bahlum, Mazin Adnan, Ayman Abdelh Al Nuaimat, Hassan Farhat

    The Arab Potash Company, APC, is one of the 10 largest potash producers of the world. The solar ponds at the Dead Sea, used for the enrichment of the salt content in the brine, are of crucial importan

    May 1, 2022

  • DFI
    The Channel Tunnel Project - Historical Background

    By C. J. Kirkland

    For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water that separates us from mainland Europe. It has given us a sense of security agains

    Jan 1, 1991