New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas
-
Innovative Application Of Piled Raft Foundation To Optimize The Design Of High-Rise Buildings And Bridge FoundationsBy Y. El-Mossallamy
The piled raft foundation was extensive applied in the last two decades in different soil conditions e.g. in soft to stiff clay as well as in medium to dense sand and even in highly weathered rock. Th
Jan 1, 2006
-
Reanalysis Of Piles Under Static And Dynamic Lateral LoadsThe process of pile driving disturbs the soil around the pile. The nature and magnitude of disturbance depends upon 1) the pile size, and 2) the nature of soil. Therefore, the prediction of a single p
Jan 1, 1989
-
Implementation of Kalman Filtering Techniques for Filtering CPT Cone Tip MeasurementsBy Gerald Verbeek, Erick Baziw
Cone penetration testing (CPT) is a popular and cost effective tool for geotechnical site characterization. CPT consists of pushing at a constant rate an electronic penetrometer into penetrable soils
Sep 8, 2021
-
Implementation Of Kalman Filtering Techniques For Filtering Cpt Cone Bearing MeasurementsBy Gerald Verbeek, Erick Baziw
Cone penetration testing (CPT) is a popular and cost effective tool for geotechnical site characterization. CPT consists of pushing at a constant rate an electronic penetrometer into penetrable soils
Oct 1, 2021
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014
-
Pile Foundations General - .1 Equipment informationBy Bengt H. Fellenius
.1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1
Jan 1, 1991
-
Case History: Estimating Ground Vibrations Caused By Pile DrivingBy Tracy Brettmann
A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat
Jan 1, 1999
-
Geotechnical Exploration Phase Drilled Shaft Load TestingBy Walter E. Vanderpool
Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and
Jan 1, 2011
-
Evaluating Axial Elastic Pile Response From Cone Penetration Tests (The 2009 Michael W. O?Neill Lecture)By Paul W. Mayne
Axial pile performance can be rationally evaluated within an elastic continuum framework using field results from seismic piezocone tests (SCPTu). Adopting a versatile Randolph-type elastic pile model
Jan 1, 2009
-
How Well Do Helical Piles Resist Earthquakes as Foundation Systems? WHERE TO GO FROM HERE?By Amy B. Cerato, Shawn Allred, Tatiana Vargas
"Helical piles are deep foundation elements that resemble, and are installed like, a large steel soil screw — they have a slender steel shaft with one or more round helix bearing plates welded to the
Jan 1, 2017
-
Deep Excavation Support – Shangri-La – TorontoBy Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle
"The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe
Jan 1, 2015
-
Recent Evolutions In Deep Foundation TechnologiesBy Maurice Bottiau
It is a quite challenging objective to aim at covering in one paper the most recent evolution in piling and deep foundations technologies. This report has to be understood within the limits of the ses
Jan 1, 2006
-
Jet Grouting For Deep Excavation Support For Re-Entrant CornersBy Chu E. Ho
This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew
May 1, 2022
-
Stabilization of Materials – Upgrading Of Soils and Sediments to Use in Geo-ConstructionsBy Helene Kennedy, Josef Macsik, Yvonne Rogbeck, Gregory Makusa, Göran Holm
"Constructions activities in cities often imply large volumes of surplus material which could be treated by stabilization for re-use in new geotechnical constructions. Modification of dredged sediment
Jan 1, 2015
-
Innovative Use Of Piles For Retaining Sides Of Deep Excavations ? SynopsisBy D. V. Karandikar
Contiguous bored piles have been used in the past for retaining the sides of deep excavation. An innovative version of this method was adopted successfully in two prestigeous projects in Bombay in whi
Jan 1, 1996
-
Soil Plug in Open Ended Pipe Piles Embedded in SandBy Mohammed Y. Fattah, Wissam H. S. Al-Sudani
"During installation of pile, a soil column is formed inside the pile. For small depths, the height of the soil column typically equals to the penetration depth (full coring state). As the penetration
Jan 1, 2014
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current PracticeBy Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil MixingBy Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen
"The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden
Jan 1, 2014
-
Micropile Foundation Retrofit Design For Richmond-San Rafael Bridge, Richmond, California - IntroductionBy Patrick E. Durnal
The Richmond-San Rafael Bridge was built in the early 50s' and was first opened to traffic on August 31, 1956. Among California's longest steel bridges, it spans more than 21,000 feet across
Jan 1, 1998