Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Time-Dependent Increase Of The Bearing Capacity Of Displacement PilesBy Florian König
It is well known that the bearing capacity and stiffness of displacement piles may increase significantly with time, a phenomenon usually referred to as set-up. In cohesive soils the set-up is commonl
Jan 1, 2006
-
Earth Pressure Acting On Single Driven Piles In SandBy Adel Hanna
Earth pressure acting on piles driven in sand is playing a major role in estimating pile capacity. In literature, researchers entertained simplifying assumptions in estimating the earth pressure actin
Jan 1, 2003
-
Diameter Effects On p-y CurvesBy Ignatius P. O. Lam
This paper presents information on design analyses of large diameter piles using conventional p-y curves as recommended by the American Petroleum Institute (API RP2A, 1993). API RP2A adopted the soft
Jan 1, 2013
-
A Realistic Approach Toward Stray Current Induced Corrosion Affecting Steel Sheet PilingBy Anne Fagot
Because of the risk of corrosion caused by stray currents, steel foundations and steel sheet piling are generally prohibited in the vicinity of railway structures. Steel solutions are only accepted if
Jan 1, 2008
-
Performance Of Toe-Grouted Large Bored Pile In Sand-Gravel Formation Of Chiang Mai City, Northern ThailandBy Narong Thasnanipan
Performance of diameter 1.5 m toe-grouted bored pile founded at depth 44 m in sand-gravel formation of Chiang Mai City is presented in this paper. Toe grouting was applied by using tube-a-manchette me
Jan 1, 2002
-
Torque Correlation Factors For Round Shaft Helical PilesBy Donald A. Deardorff
The capacity of a helical pile can be determined analytically using the individual bearing or cylindrical shear methods which are dependent on soil strength parameters and helical bearing area. The t
Jan 1, 2007
-
A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile DrivingBy H. R. Masoumi
This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative
Jan 1, 2006
-
Use Of High Capacity Grouted Tension Piles Installed Vibration Free And Soil DisplacingBy Peter de Kort
Tunnels in urban areas generally require deep excavations in soils under the groundwater table. In The Netherlands uplift loads are generally taken by piles installed into dense sand layers, which are
Jan 1, 2008
-
A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete PileBy K. Viking
It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered
Jan 1, 2004
-
Experimental And Numerical Assessment Of Osterberg Load Tests On Large Bored Piles In SandBy Roberto Nova
The selection of the Osterberg Cell (O-Cell) technology as the standard testing method for deep foundations of the Railways Po Viaduct in Northern Italy offered a relevant number of field measures on
Jan 1, 2008
-
Installation And Testing Of 260 Hollow Core Bar MicropilesBy Jesús E. Gómez
A total of 260 micropiles were installed as part of a retrofit effort for two existing bridges. The micropiles consisted of hollow core bars installed under limited headroom conditions. Of the total n
Jan 1, 2007
-
Mobilised Shear Strength on the Failure Surface of 2D Belled Anchor Model Piles under Uplift in Cohesionless SoilBy Tanaya Deb, Sujit Kumar Pal
"Experimental investigations are carried out on failure pattern around 2D models of belled anchor piles in dry sand bed of density 15.60 kN/m3 under uplift. The models are having thickness ratio (Ts/T
Jan 1, 2015
-
Settlement Monitoring Of A Building Underpinned With Micropiles And Soil NailsBy Bill Zietlow
A micropile and soil nail underpinning system was installed to support a building immediately adjacent to a 25-ft deep excavation in downtown Salt Lake City, Utah. Both the building and the underpinn
Jan 1, 2008
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
Jan 1, 2013
-
Experimental Investigation on Drag Load Acting on Single End-bearing Piles in Collapsible Soil due to InundationBy Adel M. Hanna, Ibrahim M. Mashhour
"Collapsible soil is known as one of the difficult soils, which possesses considerable strength when it is dry and significantly reduced when inundated. In practice, in case of a thick layer, pile fou
Jan 1, 2015
-
Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental ObservationsBy Andrew Budek
"Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini
Jan 1, 2005
-
Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train LoadingBy Pratik Goel, Sumanta Haldar
High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera
Sep 1, 2022
-
Underpinning Of A 16th Century Cistercian Abbey FoundationBy Michel Bustamante
The original Cistercian Lure abbey situated in eastern France and built in the second half of the 16th century, has become nowadays an administrative building. Because it has been founded on poor grou
Jan 1, 2002
-
The Wireline Undisturbed Soil Sampling In Deep Foundation ? SynopsisBy Z. Q. Bian
The wireline sampling originates from core drilling in rocks. The authors combined the wireline sampling technique with conventional undisturbed soil samplers, including Osterberg sampler, Denison sam
Jan 1, 2010
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - SynopsisBy S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996