    A Method For Predicting Load-Settlement Relationship And Bearing Capacity Of Single Piles By Means Of CPT

    By Wang Huichang

    A tentative mathod for predicting load-settlement relationship and bearing capacity of single piles based directly on the results measured by cone penetrometer with local friction sleeve is presented

    Jan 1, 1991

  • DFI
    The Use of Lidar in Mapping and Assessing Bedrock Foundations at Bluestone Dam, Hinton, WV

    By Kellie E. Gagnon, Aidan Hodge, John Vaught, Kelli Gagnon

    The USACE geologists at the Bluestone Dam Phase 5 Dam Safety Assurance (DSA) Megaproject in Hinton, WV have employed the use of Terrestrial LiDAR scanning and photogrammetry for the purpose of mapping

    Oct 7, 2024

  • DFI
    Deep Foundation Challenges for a Combined Sewer Overflow Station

    By Tina Hastings, Karen Dawson, Ryan Dunne, Patricia Bennett

    The Georgetown Wet Weather Treatment Station is located in Seattle and will treat up to 70 million gal {265 L) per day of combined sewage that would have otherwise discharged directly to the Lower Duw

    Mar 1, 2024

  • DFI
    Experiences And New Developments In Offshore Foundation

    By Franz-Werner Gerressen

    As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n

  • DFI
    Effect of Installation Method on the Ratio of Tensile to Compressive Unit Shaft Resistance of Piles in Dense Sand

    By A. C. Galvis-Castro, R. Salgado, M. Prezzi, E. Ganju, R. D. Tovar-Valencia

    It is generally accepted that the unit shaft resistance of piles in sands is lower for tensile loading than for compressive loading. So far, very little attention has been paid to the influence of the

    Jan 1, 2019

  • DFI
    Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)

    By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen

    "As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced

    Jan 1, 2017

  • DFI
    Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWY

    By David Coleman

    This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive

  • DFI
    Sustainability and Performance at Hampton Roads Bridge Tunnel (HRBT)

    By Jarod McBride, Mike Johnston

    Over the last decade the construction industry, particularly ground enhancement services such as Jet Grouting, have seen a dramatic rise in the cost of waste transportation and disposal services; incr

    Oct 7, 2024

  • DFI
    Uncertainties In CSL Test Interpretations And Recommendations Toward A More Efficient Process

    By Rohrbach

    Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, secan

  • DFI
    Uncertainties in CSL Test Interpretations and Recommendations toward a More Efficient Process (d88ba311-8a75-4265-90f4-c083be22cd1a)

    By Mark A. Rohrbach, Timothy R. Kovacs, PhD Saidin

    "Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, seca

    Jan 1, 2017

  • DFI
    The Resonant Driver: Ultra High Frequency Pile And Casing Installation

    By Matthew Janes

    The installation of piles and casings is becoming increasingly difficult as restrictions on vibration become common in major urban areas. The use of high frequency, resonant excitation of a pile or c

    Jan 1, 2008

  • DFI
    Risk Management For Dam Rehabilitation Projects

    By Dave Paul

    Dam rehabilitation involves a range of design, construction, and operation risks, some of which are not encountered in new dam construction. These risks can have significant impact on project schedule

  • DFI
    A Case Study In Hand-Dug Caissons ? Synopsis

    Caissons hand dug to a depth of about 100 feet were used to underpin three important structures at an industrial site in the State of Utah. The caisson shafts extended through 30 to 40 feet of coarse,

    Jan 1, 2010

  • DFI
    Earth Pressure Distribution On Diaphragm Wall During Excavation

    By Ting Chinsu

    Diaphragm wall with tie-back cable is widely used for deep excavation, especially in the area with high density of buildings. This paper presents the measured earth pressure distribution on diaphragm

    Jan 1, 1991

  • DFI
    Challenges in the Design and Construction of Deep Foundations for Transportation Infrastructure Projects

    By Dan Brown

    Renewal and revitalization of transportation presents a challenge in the need for replacement, repair, and improvements of existing bridges, as well as increased construction of transit systems within

    Jan 1, 1900

  • DFI
    Stability Analysis Of A Rubble Mound Breakwater Resting On The Weak Seabed By 2D Finite Element Modelling

    By Vijaya R, Boominathan A

    The design of a rubble mound breakwater resting on a problematic seabed is quite challenging and expensive. In the present study, stage-wise construction of a typical section of the breakwater for a p

    Sep 1, 2022

  • DFI
    Professional Responsibilities In Sub-Surface Investigations For Foundations. - Introduction

    By D. J. Ketkar

    It is a frequent experience to find that the Sub-surface Investigation (S.I.) data is either inadequate or misleading. However, such cases are rarely reported. Nonetheless, the projects suffer on-acco

    Jan 1, 1996

  • DFI
    Micropile Performance Variability: A Fundamental Case Study

    By Walter E. Vanderpool

    Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.

    Jan 1, 2002

  • DFI
    Innovative Non Encroaching Retaining Wall

    By Dino Kartofilis, Rick Deschamps, Giovanni (John) Bonita

    "Anew condominium complex in Arlington, Va., presented some formidable constraints. One was the requirement for a permanent retaining wall to support a 48.5-ft (15-m) cut and an existing 16- story bui

    Jan 1, 2009

  • DFI
    Unified Specifications for Soil-Mixed Seepage Cutoff Walls

    By Wayne S. Smith, Erik James, Jose R. Gomez

    "Soil mixed seepage cutoff walls are increasingly being used in levee and dam modification projects nationwide. An important aspect of their overall quality depends greatly on the language included in

    Jan 1, 2016