Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rehabilitation of the Kölnbrein Dam / AustriaBy Frank Haehnig, Kurt Kogler
"With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas
Jan 1, 2016
-
Design and Construction of Nysted Offshore Wind Farm, DenmarkBy Jørn Thomsen, Christoffer Brodbaek
"As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th
Jan 1, 2009
-
Driven Pipe Pile Solutions for the Temporary Foundations at the New San Francisco-Oakland Bay BridgeBy Manuel M. Reyes, Thuraisamy Thavaraj, Alex Sy
"The new east span of the San Francisco-Oakland Bridge features a single tower self-anchored suspension (SAS) bridge. During construction of the SAS bridge, a temporary bridge was used to support the
Jan 1, 2015
-
Comparison of LRFD Resistance Factors to Tension Pile Load TestsBy Seth H. Hamblin, John E. Regan, Dimitrios Palantzas
"Through reliability-based calibration of larger pile load test databases, recent developments of the Load Resistance Factor Design (LRFD) methods, which include geotechnical load and resistance facto
Jan 1, 2015
-
Concrete Piles Driven In A Coral SandBy L. D. Johnson
12 groups of 12 precast prestressed (PCPS) piles were driven in the lagoon of Kwajalein Island to support a dry dock. Pre-construction investigation of the calcareous coral sands and static pile loeid
Jan 1, 1993
-
The Secret to DewateringBy Gregory M. Landry
"There is an old joke at Moretrench that defines dewatering as “that element of an underground construction project, which, when disregarded, will generate the low bidder.” Sigmund Freud wrote that al
Jan 1, 2017
-
Session 27 "Grouted Cutoffs"By Trent Dreese
For critical velocities in gravel units we use Bush-Luckner, Sichardt, other empirical equations, and equations derived from laboratory experiments too. On the base of these, we compiled critical velo
Feb 10, 2003
-
High Capacity Drilled Piles in BrooklynBy Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe
"The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount
Jan 1, 2016
-
Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)By K. Rainer Massarsch
"Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an
Jan 1, 2004
-
Comparison of Load Test Results between ACIP Piles Installed in Sand in Pre-Drilled Holes versus Conventional InstallationBy Tracy Brettmann, Shailendra Endley, Jason Leary, Shashank Valluru
"Augered Cast-in-Place (ACIP) piles have long been used for deep foundation support in sands due to their high capacity and speed of installation. Very little information exists on the effects on capa
Jan 1, 2017
-
Deep Foundations for High-Rise Building Within Footprint of Existing Parking StructureBy Mirza Shafiq Ibrahim, Martin Hudson, Rishabh Singhvi, Saiful Islam
The Landmark Apartment building is a 34-story high-rise constructed in West Los Angeles. The high-rise was constructed within a portion of the footprint of an existing parking structure with four subt
Oct 31, 2023
-
Excavation-Induced Movement of Adjacent FoundationsBy Hugo Meggitt, Damian R. Siebert, Wystan Carswell
Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras
Jan 1, 2019
-
Mindful Monitoring Of A Variable Excavation Support SystemBy B. Philip Shull, Allen W. Cadden, Johanna M. Simon, Michael S. Senior
A 670 linear meter (2,200 linear foot) large-diameter sanitary sewer interceptor installation at depths ranging from 3 to 10 m (10 to 30 ft) below existing grade in an area with a high water table req
-
Design & Installation of Offshore Driven Piles – A Gulf of Thailand Regional PerspectiveBy Kaushik Mukherjee
"Malaysian offshore and surrounding region are favorable to the installation of driven piles. During the design phase, pile driveability analysis plays a major role in pile make-up design to suit and
Jan 1, 2015
-
2017 OPA WINNER - Tri-Pod Suction Buckets for Offshore Wind Turbine FoundationBy Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu
"Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982).
Jan 1, 2017
-
Tri-Pod Suction Buckets for Offshore Wind Turbine FoundationBy Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu
"Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982).
Jan 1, 2017
-
Improvements to Commonly Used Cutoff Wall SpecificationsBy Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
New Developments of Jacked PilesBy Victor Li, Joley Lam
"INTRODUCTIONJacked piles are piles that are pressed into the ground, usually by hydraulic jacks. For this reason, jacked piles are also known as pressed in piles. Jacked piles are mainly used for the
Jan 1, 2004
-
The Use of Advanced Electronic Features in Foundation Equipment Help or Hype for the User?By Manfred Schoepf
"Construction projects using the most advanced technologies and organizational structures demand intelligent construction machinery. In this process, automation technology plays an increasingly import
Jan 1, 2015
-
Session 7: Grouting Compaction Grouting For Sinkhole Repair at WAC Bennett DamBy James Warner
Investigations of the sinkhole indicated that the loose, disturbed ground was completely encircled by dense competent core. This confinement substantially increased the effectiveness of the compaction
Feb 10, 2003