Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation MethodsBy Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016
-
Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike RehabilitationBy Michael Arnold
"BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d
Jan 1, 2015
-
Influence of Surface Replacement Layer on Behavior of Laterally Loaded Large Bored Piles in Soft Clay: Pile Load Tests and Numerical InvestigationBy Hayel M. El-Naggar, Mohamed Sobhi, Mamdouh M. Hamza, Marawan M. Shahien
"This paper presents the results of two lateral load tests on large bored piles in soft clay deposit for a major site in northern Egypt. The tests are carried out on 0.8 m diameter piles. One of the t
Jan 1, 2016
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab
-
A Resilience Approach for Design of Earth Retaining Systems with Application on MSE WallsBy George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis
"The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.
Jan 1, 2016
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
"The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica
Jan 1, 2017
-
Baltimore's Fort McHenry Tunnel ? Introd[u]ctionBy Axel J. Pollak
Since the late 1960's the Interstate Division for Baltimore City (IDBC) has been planning and developing the Interstate Highway System for the city to meet regional planning goals. The principal
Jan 1, 1989
-
Mini-Pile Design and Construction Methods Change to Mitigate Soil Loss through Glacial Till (db8ff9fc-ef1a-44d4-9e2e-ad6c00fcf7e5)By Cassandra A. Wetzel
"Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between
Jan 1, 2017
-
New Orleans Levee Improvement Project: An OPA ContenderBy Filippo Leoni, Wesley Schmutzler
"The LPV-111 East Back Levee Improvement Project lies along the Gulf Intracoastal Waterway (GIWW) in Orleans Parish of New Orleans, La., and is an essential component of the New Orleans Hurricane Prot
Jan 1, 2013
-
Virtual Imaging Technologies as Decision-Making Tools for Geo- HazardsBy Arpana P. Sabu, Themis Vaxevanis, Sissy Nikolaou, Guillermo Diaz-Fanas
Geo-failures from extreme events (landslides, wild fires, earthquakes, floods, etc.) have increased exponentially in recent years around the world and within the USA. When catastrophic failures occur,
Jan 1, 2019
-
A Geotechnical Data Base Development And Applying Data Mining Techniques To Extract The Common Trendes Of Offshore Geotechnical Properties Of South Pars Gas Field/ Persian Gulf IR-IranBy H. Shiri
Iran's largest natural gas field is South Pars, geologically an extension of Qatar's 900-Tcf North Field. South Pars was first identified in 1988 and originally appraised at 128 Tcf in the e
Jan 1, 2006
-
Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - SynopsisBy Anupam Saxena
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U
Jan 1, 1996
-
Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction (50051f21-259c-48c8-b98a-08fa9c39001e)By Michael Arnold, Robert Bachus, Michael Bracher, Jamey Rosen, Robert Roff
"For a high hazard USACE facility, the Center Hill Dam in Tennessee, several disparate streams of data were compiled into a single geospatial and relational enterprise data management system to store,
Jan 1, 2017
-
Explainable Machine Learning for Soilcrete UCS PredictionsBy Katerina Ziotopoulou, Martin Yossifov, Jim Gingery, Katherine Cheng
Soil mixing is an in-situ soil treatment method that consists of mixing cementitious binders with in-situ soil to create soilcrete. The success of this treatment often relies on the value of the Uncon
Oct 7, 2024
-
Goethals Bridge Replacement Foundation Design Modifications Due to Field ConditionsBy John P. Turner, Mark Jen, Bobby Daita
"The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-
Jan 1, 2016
-
Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, ORBy Vince Luongo
"INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project
Jan 1, 2006
-
A Study On Performance Of Piles Based On Methods Of InstallationBy Babu K. V., Samyukta P.
The energy demand in India is expected to show increasing growth in the next few decades. The oil companies in India are revamping the existing oil refineries as well as constructing new refineries ac
Sep 1, 2022
-
Protection of Waterfront Properties by Pressed-In Sheet Pile SeawallsBy Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa
"This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco
Jan 1, 2016
-
The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling FluidBy Ping Yang, Tian-bin Li, Min-hui Wu
"The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of
Jan 1, 2017
-
Marine Construction on Loch Lomond Inlet/Outlet Replacement Project at Newell Creek Dam, Ben Lomond, CABy Blaise Fettig
Santa Cruz Mountains, Ben Lomond, CA Vortex Project Sponsor- Blaise Fettig Vortex PM- Peter Dworetzky Obayashi Corp (Prime Contractor) PM- Kenji Yamauchi ABSTRACT: The City of Santa Cruz Water Departm
Oct 7, 2024