    Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)

    By Lori A. Simpson, Linda H. Liang

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T

    Jan 1, 2017

  • DFI
    Building A High-Rise Adjacent To Transit Tunnels In San Francisco

    By Lori A. Simpson

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.

  • DFI
    Hybrid Excavation Support System for the Union Station Revitalization Project

    By Charles G. Crans, Naresh Gurpersaud

    "Toronto’s Union Station, a National Historic Site occupying an entire city block, is the busiest commuter rail transportation hub in Canada. An extensive project is being undertaken to revitalize Uni

    Jan 1, 2017

  • DFI
    Geotechnical Evaluation for the Treasure Island New Ferry Terminal Foundations

    By Christopher Stouffer, Stefanos Papadopulos, Siobhan O'Reilly-Shah, Pedro Espinosa

    Treasure Island is located in the center of San Francisco Bay, between the active San Andreas and Hayward faults. Treasure Island was constructed in 1930s at the site of the Yerba Buena Shoals, a shal

    Oct 31, 2023

  • DFI
    Bi-Directional Load Test (BDLT) for the New Headworks Facility Project in San Francisco, California

    By Joseph Seibold, Kavin Khatri, Siobhan O'Reilly-Shah, Neel Neelakantan

    San Francisco’s New Headworks Facility Project consists of the design and construction of a state-of-the-art Headworks Facility designed to treat up to 250 million gallons of wastewater a day. T

    Oct 7, 2024

  • DFI
    Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction

    By David R. Sutfin, Joseph Lodde

    110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method

    Jan 1, 2019

  • DFI
    Fogg Museum Expansion - Support of Excavation Design and Construction

    By James L. Christensen, Gregory Sanchez, Michael P. Walker

    The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat

    Jan 1, 2015

  • DFI
    Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in London

    By Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow

    "Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of

    Jan 1, 2005

  • DFI
    The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall

    By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers

    Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM

    Jan 1, 2019

  • DFI
    Engineering The Mansion's Heritage

    By Ken MacLeod

    A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi

    Jan 1, 2006

  • DFI
    Harry Nice Bridge Geotechnical Instrumentation Case Study

    By Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.

    Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans

    Oct 1, 2022

  • DFI
    Application of the Cement Deep Mixing Method for Shallow Water Areas Using the CDM-Float Technique

    By Takeo Asanuma, Sachihiko Tokunaga, Hirofumi Taguchi, Yasuhiro Ootsuka, Yosuke Tanaka

    The Cement Deep Mixing Method (CDM Method) is a ground improving method that has been used for mainly offshore sites to strengthen the soft ground below the sea bottom by injecting and adequately mixi

    Jan 1, 2015

  • DFI
    Selecting the Right Shoring System – San Francisco Experience

    By Heinrich Majewski, Rob Jameson

    "Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env

    Jan 1, 2017

  • DFI
    Gilmore Place Development

    By John Roxas, Rodrigo Fragachan, Alex Gossen, Jakub Szary

    The Gilmore Place development is mixed-use transit-oriented development in Burnaby, British Columbia, Canada. The development replaces the underutilized space surrounding the existing Gilmore SkyTrain

    Oct 31, 2023

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • DFI
    Anchored Double-Tier Retaining Walls on Sloping Embankment

    By Chu E. Ho, Paul Napoli

    A new waterfront park was developed on Long Island in close proximity to the East River and Newtown Creek. The existing ground consisted of fill over soft organic clay, medium dense silty sand, glacia

    Jan 1, 2019

  • DFI
    UB Digs Deep and Builds Over Adjacent Subway for New Medical Building Hub

    By Lisa R. Papandrea, David Chen, Walter E. Kaeck

    "Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su

    Jan 1, 2016

  • DFI
    Direct Power Compaction - a New Deep Vibro-Compaction Method for Liquefaction Mitigation of Hydraulically Placed Sand Layers in San Francisco Bay

    By Nozomu Kotake, Rakshya Shrestha, Ralph Griffin, Stefanos Papadopulos, Jeff Fippin, Sushil Kafle

    Direct Power Compaction (DPC) is a deep Vibro-compaction method used for liquefaction mitigation. In DPC, H-beams are used as vibrating rods penetrating deep into the ground, and a vibrating force is

    Sep 8, 2021

  • DFI
    Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont Tower

    By Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich

    "The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element

    Jan 1, 2017

  • DFI
    Anchored Hollow Bar Tangent Pile System For Underpinning

    By Marco D. Boscardin, Benjamin H. MacKinney, Kenneth R. Allard, Kenneth A. Pidgeon, Adriane G. Boscardin

    This paper presents a case history for a unique application of a system of vertical micropiles with horizontal soil nail bracing and shotcrete facing for underpinning. The system was used to support a