Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Electrolytic Recovery of Metallic Iron and Chlorine Gas from Chloride Waste

    By Yves Pépin, Sylvain Lefebvre, Dimitrios Filippou, Guillaume Hudon

    "Titanium dioxide pigment plants using the so-called “chloride process” produce considerable amounts of chloride waste, which contains predominantly iron chloride. In most cases, this waste is dissolv

    Jan 1, 2016

  • CIM
    Cerro Verde Concentrator – Four Years Operating HPGRs

    By S. Koski, J. Vanderbeek, J. Enriquez

    "The Cerro Verde copper-molybdenum porphyry mine, majority owned and operated by Freeport- McMoRan Copper & Gold, is located 30 km southwest of Arequipa Peru. The concentrator, which produces copper a

    Jan 1, 2012

  • CIM
    Modernization and Start-Up of the Spcc Ilo Smelter

    By W. Torres Pino, L. Mariscal Samaniego

    The Ilo Smelter has been continuously operating since 1960 with Reverberatory furnaces and Pierce Smith converters producing blister copper. The original installed capacity of 1.134 tons per day of co

    Jan 1, 2007

  • CIM
    Giant's Milling Operation

    By H. E. Pawson

    Giant Yellowknife is located 600 air miles north of Edmonton on the north shore of Great Slave Lake in the Northwest Territories. In its 24 years of operation some 7,730,000 tons of ore have been trea

    Jan 1, 1973

  • CIM
    Rubber Mill Liners General Discussion

    "ChairmanThis part of the discussion is intended as an exchange of information between those who have installed rubber liners in their mills and a means of others to get information that may help them

    Jan 1, 1968

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing

    By M. Redfearn

    "DUST COLLECTION EQUIPMENT LIST Primary Dust CollectorModular Mikro-Pulsaire - Model 2G1-96TR Capacity: 20,000 c.f.m.Bags: Total of 288; 8' x 4 1/2"" diameterMaterial: Dacron HCE feltAir to cloth rati

    Jan 1, 1976

  • CIM
    Recent electric furnace developments at Falconbridge (Sudbury Operations)

    By J. Chao, C. Tan, N. Stubina

    "Since J978, Falconbridge Limited has operated two electric furnaces at its nickel-copper smelter in Sudbury. As part of its S02 Abatement Program, the smelter has undergone many changes over the last

    Jan 1, 1994

  • CIM
    Vibration Studies-Blasting and Rock Bursts

    By L. Don Leet

    Abstract Earthborne vibrations from blasting and other sources, including rock bursts, can now be recorded effectively. The nature and magnitude of vibrations from various sources have been investiga

    Jan 1, 1951

  • CIM
    Electric Furnace Freboard Combustion CFD Modeling

    By A. Golpaygan

    Application of Computational Fluid Dynamics (CFD) modeling for simulation of fluid flow and combustion in industrial scale electric furnace is presented. Poor combustion efficiency, roof and/or side w

    Jan 1, 2011

  • CIM
    Lateral Development Drilling by 'Jumbo'

    By C. E. Dowker

    "IntroductionMechanization underground at the Buffalo Ankerite mine in Deloro township, Porcupine district, had reached a high level by 1944, both in equipment available, and in the use of this equipm

    Jan 1, 1950

  • CIM
    Assessment of Performance of Powered Shield Support used on Weak Floor

    The article presents an outline of methods and certain results of laboratory tests, underground tests and model tests, aimed at assessing performance of a powered shield support on the floor of low st

    Aug 1, 2013

  • CIM
    Ventilation of Development Headings at the Sullivan Mine

    By O E. Weightman

    This paper describes the methods used for the ventilation of raises, sublevels and drawholes at Cominco's Sullivan mine. The problems involved in ventilation during blasting, drilling and scrapin

    Jan 1, 1965

  • CIM
    VLF-EM Data Processing

    By D. C. Fraser

    "Geophysical Engineering and Surveys Limited of the Keevil Mining Group have routinely conducted ground surveys with VLF-EM receivers for the past two years. Both Crone's Radem and Ronka's EM16 have b

    Jan 1, 1971

  • CIM
    Accounting Methods at Lake Shore Mines

    By G. F. Doggett

    In describing accounting methods at Lake Shore Mines, it is the intention of the writer to limit the discussion to the principal features of the system used in securing cost figures and other statisti

    Jan 1, 1935

  • CIM
    Unsteady ... State Gas Flow-Use of Drawdown Data in the Prediction of Gas Well Behavior

    By K. Aziz

    The solutions to unsteady-state gas flow in a radial system have been reviewed in order to aid in the interpretation of drawdown data. It has been the practice to evaluate the time and rate conversion

    Jan 1, 1963

  • CIM
    Effect of Superheat and Section Thickness on Flow Characteristics for Thin Section LFC of Hypereutectic Al-Si Alloys

    By A. Haldar

    This study focuses on the flow characteristics of hypereutectic Al-Si alloys in thin sections. The pattern assembly consisted of spiral horizontal patterns, 6.25 mm (0.25 inch) and 12.50 mm (0.50 inch

    Jan 1, 2007

  • CIM
    Scheduling Production by the Critical Path Method at McIntyre

    By P. O. Parfitt

    At the McIntyre mine, there are two distinct operations: a gold mine with narrow veins, mined by cut-and-fill methods, and a copper mine with large, open, long-hole stopes. The application of the Crit

    Jan 1, 1967

  • CIM
    Inspection and rehabilitation of the Daly-Judge Tunnel, Park City, Utah

    The Daly-Judge Tunnel, begun in 1887 to drain mine workings, is now a source of potable water for the Municipality of Park City. The water is exceptionally clean; however, when roof falls occur, suspe

    Jan 1, 2006

  • CIM
    Power Analysis of the Milling Process in SAG Mills

    By A. Gutiérrez

    At present, most ore milling is done in tumbling mills, consisting of huge cylinders turning on their horizontal axis. This rotational motion causes the ore charge and the grinding balls to interact b

    Jan 1, 2007

  • CIM
    Towards Improved Metallurgy –Small Innovations at Falconbridge's Strathcona Mill

    By S. Kelebek, Gerhard W. Heinrich, Peter F. Wells

    "The review and optimization of process stages is an integral part of the program to improve the metallurgical performance of the Strathcona Mill. Improved primary grind size distributions, streamlini

    Jan 1, 1996