Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Inmet?s 2004 Performance Against TSM Indicators

    Agenda ? Introduction ? Inmet?s Operations and Closed Properties ? Inmet?s SECA Philosophy ? Inmet?s SECA Framework ? The Business Case for TSM ? Inmet?s TSM Reporting ? Inmet?s 2004 TSM Perfor

    Apr 1, 2005

  • CIM
    Climate Change and Canadian Mining: Opportunities for Adaptation

    By Jason Prno

    Context ? Climate change an issue of global significance ? Research is lacking ? Study initiated by the David Suzuki Foundation, led by ArcticNorth Consulting Industry Surveying ? 34% and 48% of

    May 1, 2010

  • CIM
    The Gunnar uranium deposit

    By E. F. Evoy

    "The Gunnar uranium deposit was within metasedimentary rocks of the late Archaen Tazin Group. These rocks were intensely altered by albitization so that the immediate host to the ore consisted dominan

    Jan 1, 1986

  • CIM
    Mineralogical Investigation of the Carbon Leader Reef from Tautona Mine in South Africa

    By R. Burnette

    Gold has been mined from a variety of deposit types that range in age from Archaean to Recent. The large variability in the geological settings of the gold deposits implies transport and concentration

    Jan 1, 2011

  • CIM
    Super-Fine Crushing – Pivotal Comminution Technology from IMP Technologies Pty. Ltd.

    "Dry crushing trials at pilot scale have shown that the IMPTEC Super-fine Crusher has the capacity to generate ultra-fine products from hard mineral assemblages presenting at either coarse or fine fee

    Jan 1, 2016

  • CIM
    Process Advances at Lac Minerals Ltd. - Est Malartic Division

    By G. H. Hope, D. Green

    "Recent process advances at Lac Minerals Est Malartic Division are discussed. The Est Malartic mill treats massive sulphide, copper/gold ore from the Bousquet 2 mine, to produce a gravity gold product

    Jan 1, 1993

  • CIM
    Earth Moving Equipment Safety Round Table - The EMESRT Story (2006-2008)

    Mining companies around the globe have long struggled with the need to ensure that earth moving equipment is designed to be operated and maintained under all site conditions without causing harm to pe

    May 1, 2009

  • CIM
    Climate Classification and Quantification for Cover Design in Northern Environments

    By D. Fredlund

    The decommissioning of uranium tailings facilities often requires the design of a suitable cover system. In northern climatic environments there is a portion each year that can be considered to be ?in

    Aug 1, 2010

  • CIM
    Flotation Performance and Mechanisms of ?-Hydroxyoctyl Phosphinic Acid Adsorption to Oxide Ores

    By Hong Zhong, Shuai Wang, Fangxu Li, Guangyi Liu

    "The flotation performances and adsorption mechanisms of a-hydroxyoctyl phosphinic acid (HPA) to malachite, cassiterite and wolframite were investigated by micro-flotation tests and X-ray photoelectro

    Jan 1, 2016

  • CIM
    The Future is Open - On-Equipment Computing at Teck

    By Peter Cunningham

    Teck Facts and Figures ? Employ more than 14,000 around the world, includes: ? Over 8,600 in Canada (close to 7,800 in British Columbia) ? Close to 2,000 in Chile ? Over 2,700 in Peru ? Approxima

    Aug 1, 2013

  • CIM
    Fraser Mine Material Handling System

    Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are

    Feb 1, 2008

  • CIM
    Lead-Zinc Deposits of the Salmo Area, British Columbia

    By J. T. Fyles, C. G. Hewlett

    "THE TOWN OF Salmo, rail centre for the Salmo lead-zinc mining district, is in southeastern British Columbia 26 miles by road east of Trail an about the same distance south of Nelson. The belt in whic

    Jan 1, 1949

  • CIM
    Phakisa Number 3 Ventilation Shaft Rehabilitation Project

    By S. Deonarain, L. S. Schultz

    "This paper details the process and methodology followed to rehabilitate a rectangular ventilation shaft, situated in the Free State region of the Witwatersrand Gold Fields in South Africa. The shaft

    Jan 1, 2019

  • CIM
    Mine to Mill: Optimization of Aggregates Production

    By M. J. A. Ruszala

    Aggregates production is a huge global industry which uses an enormous amount of energy and produces a massive amount of unsalable fines. Reducing the amount of energy used per tonne of product and/or

    Aug 1, 2013

  • CIM
    Treatment of Thompson Copper/Arsenic Residue

    By T. Xue, A. Singhal, D. Wrana, I. Mihaylov

    "At Vale's Thompson Nickel Refinery, the copper and arsenic in the nickel electrolyte are removed by precipitation using H2S, generating a sulphide precipitate containing about 40% Cu, 8% Ni, 2 to 4%

    Jan 1, 2012

  • CIM
    New Miner Training Program

    By Denis Beaudoin

    Program Basics: Goals, Course Content & Training Process Sudbury: History of the Program & Lessons Learned Diavik: History of the Program & Lessons Learned Most Recent Program: Totten Mine in partn

    Oct 1, 2010

  • CIM
    Conventional Shaft Sinking Unconstrained by Equipment Availability

    By S. W. Henley

    "Shaft sinking design is typically driven by what has been successful in the past and the availability of sinking plant. This document considers a project where the sinking design and methodology is u

    Jan 1, 2019

  • CIM
    The Metso Mp1250 Cone Crusher ? Two Case Studies

    By D. A. Jacobson

    Mining operations, whether new or existing, are constantly looking for ways to maximize production and improve energy efficiency, while keeping the footprint required to a minimum. The Nordberg MP1250

    Jan 1, 2012

  • CIM
    Back-Analyses of Failures and Support Redesign of a Magnesite Roomand-Pillar Mine Excavated in Stratified Rock

    By J. Arzúa, L. R. Alejano, P. Rodríguez

    "After six years of successful excavation with a support pattern, some roof failures have happened in a room-and-pillar underground mine excavated in a stratified rock mass. In this paper the authors

    Jan 1, 2015

  • CIM
    Pyrrhotite Rejection at the Strathcona Mill

    By J. Coffin, M. Muinonen, D. Fragomeni, R. Multani, C. Deredin

    "Rejection of pyrrhotite from pentlandite is of critical importance to the economics of nickel concentrate production and the main goal of the Strathcona milling operations. A joint team of XPS, Glenc

    Jan 1, 2018