Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Estimation of hoisting power requirements for friction and drum hoists for prefeasibility studies in CanadaBy D. J. Farmer
Mining hoists are major components of any underground mine, however, the detailed design work required to get the actual power required for a particular hoist is outside the scope of preliminary feasi
Jan 1, 1997
-
An Economic and Environmental Case for Re-processing Gold Tailings in South AfricaBy James A. Brown, Marius Botha, Christopher A. Fleming
"The technical and economic feasibility or re-processing hundreds of millions of tons of tailings in a number of historic gold tailings dams in the Witwatersrand area of South Africa is being investig
Jan 1, 2010
-
Notes on Fire Prevention and Fire Insurance for Mine BuildingsBy W. G. Millar
Until a fire occurs, insurance and prevention work are often looked on as unavoidable necessities, but as insurance is back of all business credit, it is essential to know that in case of damage money
Jan 1, 1928
-
Learnings from Infrastructure Replacement within an Operating RefineryBy L. Trytten, S. Bass, P. Nawrocki, J. Mercer
The Sherritt Fort Site nickel refinery and fertilizer plant has been operating continuously since 1954. The ammonia leach process uses ammonia and sulphuric acid, producing nickel and cobalt and an am
Jan 1, 2015
-
Mine Rescue Work in the Sudbury DistrictBy T. J. Fee
Introduction The International Nickel Company have been pioneers in mine rescue work in Ontario. Following the fire in the Hollinger mine in the spring of 1928, the Company purchased ten self-contain
Jan 1, 1935
-
Application of Steam to the Dewatering of Metallurgical ConcentratesBy C. S. Simons, D. A. Dahlstrom
"Growing interest in the developing technique of improving the dewatering of filter cakes by the direct application of steam has been apparent during the past year. A number of applications to iron an
Jan 1, 1966
-
Mining Exploration, Geology and Geophysics in the Maritime Appalachian AreaThe writer presents a concise summary of eleven recent discoveries made in the Maritime Appalachian area, with suggestions for fur the research. This information may prove helpful to geologists workin
Jan 1, 1963
-
Capturing unrealized capacityBy M. W. Lewis
A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th
Jan 1, 2004
-
Capturing unrealized capacityBy M. W. Lewis, B. Sambirsky, J. Werner
A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh
Jan 1, 2004
-
The Reduction of Pressure Gradients in Oil PipelinesBy M. E. Charles
The use of water flowing as a lower layer to reduce pressure gradients in petroleum pipelines was investigated using 17.5 deg. A.P.I. Lloydminster crude oil in a 1-inch laboratory pipe-line and a 21h-
Jan 1, 1960
-
The Pogo project: flowsheet development and designBy Eric Konigsmann
"The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un
Jan 1, 2002
-
A Systematic Experimental Study on Gold Recovery from Electronic Waste Using Selective Ammonium Persulfate Oxidation (ABSTRACT)By Oberlando Gonzalez, Claudia Serna, Andrea Alzate, Esperanza López, Maria Holuszko
This paper presents a systematic approach on gold recovery from electronic waste (e-waste) using ammonium persulfate. This process was developed as a response to the lack of hydrometallurgical systems
Jan 1, 2017
-
Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”By Robert E. McIvor
"“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g
Jan 1, 2013
-
Real-Time as-Built Tunnel Product Modeling and Visualization by Tracking Tunnel Boring MachinesBy X. Wu
Tunnel Boring Machines (TBMs) are widely used for tunneling in urban areas because of their high advance rate, precise as-built profile and minimal impact to buildings and traffic on the ground. For a
Aug 1, 2013
-
Training to Process Analysis Methods using a Gold Leaching SimulatorBy Jessica Egan, Daniel Hodouin, Mohammed Reza Khalezi, Steve Bellec, Claude Bazin, Carl Duchesne
"A model for gold leaching was developed and implemented into a simulator. The simulator uses a description of the ore that is based on the mineral composition and precious metal content. The model ac
Jan 1, 2008
-
Ventilation System Design for the Wassa Underground MineBy B. S. Prosser, K. G. Wallace, A. Akansobe
"This paper describes a ventilation project at the Wassa gold mine in Ghana. Golden Star (Wassa) (GSWL), a subsidiary of Golden Star Resources, owns and operates the mine. Golden Star holds a 90% inte
Jan 1, 2019
-
Rapid Mine Drifting & Tunneling, A Review of the Current Situation at some Selected Mines and Civil Projects from around the WorldBy Gunnar Nord
Introduction ??Atlas Copco has customers both amongst Miners and Contractors ??We believe that the contractor's approach to tunnelling is worthstudying ??For a tunnel contractor the incenti
May 1, 2009
-
Energy Conservation in Mining & Milling OperationsBy T. B. Armstrong
"The developing world energy crisis and spiraling fuel costs have created a new public awareness and general acceptance of the need for energy conservation.Plants will have different objectives for an
Jan 1, 1978
-
Hydrochloric acid leaching of an Elliot Lake uranium oreBy G. M. Ritcey, K. E. Haque, S. H. Lucas
"Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an
Jan 1, 1980
-
Chapter 8. The Farm-In/Joint Venture AgreementBy Karl J. C. Harries
"8.1. INTRODUCTIONThe purpose of this chapter is not to provide precedents or examples of provisions, but rather to offer some comments that may be worth considering in the negotiation or review of an
Jan 1, 2003