Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Using Data to Identify Risk to Improve Safety and Health Performance

    By A Williamson

    The New South Wales Department of Mineral Resources objective is to use data and information to undertake a detailed analysis of incidents and accidents to identify risks so that the predictable can b

    Jan 1, 2003

  • AUSIMM
    Mining Open Stopes at Cannington Mine Using a Vertical Retreat Open Stoping (VROS) Method

    Vertical retreat open stoping (VROS) is a variation of sublevel open stoping (SLOS) that has been introduced at Cannington to minimise the influence of subvertical geological structures during stope e

    Jan 1, 2005

  • AUSIMM
    Measured Resources and Proven Reserves – Are they still Relevant?

    By S Juras

    The terms measured resources and proven reserves denote the highest level of estimation confidence in all of the major classification schemes. But what do they really bring to today’s project or mine

    Aug 22, 2011

  • AUSIMM
    Magnetic Recovery of Gold-Bearing Iron Oxides at Barrick GoldstrikeÆs Roaster

    By L Semenyna, W Douglas

    Gold is often present in solid solution with pyrite in the Carlin Trend. The presence of organic carbon along with gold hosted in sulfide, referred to as double refractory ore, requires that ore with

    Sep 26, 2013

  • AUSIMM
    Simulation as a Tool for Mine Planning

    By J Greberg

    This paper discusses the use of simulation in the mine planning process. A case study on the Newcrest Cadia East project is presented, and the challenges and possibilities for using simulation as a to

    Nov 22, 2011

  • AUSIMM
    Determining Gold Particle Size in Gravity Ores for Sampling and Metallurgical Characterisation - Discussion and Test Protocol

    Sampling protocols and metallurgical flow sheets should be designed to suit the style of mineralisation in question. In support, the a priori need for evaluation programs is the characterisation of th

    Aug 1, 2010

  • AUSIMM
    Lighting up the dark – the use of 3D seismic to optimise mine plans at structurally complex Blackwater mine

    By N Pranoto, E Lawell, T Dean, M Grant

    The Goonyella Riverside Mine is located 30 km north of Moranbah in Central Queensland, Australia. Recent mining activities have exposed the north–south striking Kenya and Zimbabwe thrust Faults. These

    Mar 22, 2022

  • AUSIMM
    The Autoxidation of the Thiolate Collectors Catalysed by Cobalt (II) Phthalocyanines and its Influence on the Sulphide Flotation

    By Faidel VV, Yushina TI, Yagodkina NG, Yatsimirsky AK, Chanturiya VA

    Among the problems of the flotation of sulphides by the thiol collectors is the dependence and varieties of the flotation starting with the time and oxygen contents in the slurry. For sulphides, the

    Jan 1, 1993

  • AUSIMM
    Mine Planning - Rate: A Key Criteria

    The mining industry has a well deserved reputation earned over the years for innovation, engineering, management and the quick application to mining of emerging technology. The cumulative result i

    Jan 1, 1989

  • AUSIMM
    Power Supply for Remote Mining Developments

    By Bailey H. W

    Power supply for remote mining developments is compared with supply to the general public with the conclusion that the private power plant operator has many opportunities to minimise his costs whi

    Jan 1, 1973

  • AUSIMM
    Portable Digital Voltammetry And Its Application To Ultra Trace Analysis In Exploration

    Anodic stripping voltammetry is an analytical technique which has established some popularity for trace analysis of metals because of its sensitivity, selectivity and capability for simultaneous a

    Jan 1, 1987

  • AUSIMM
    The Jacobs Sliding Floor: Current Competitive Applications

    The Jacobs Sliding Floor (Floor) is experiencing a surprisingly long competitive life. The first Floor was used on the Camino Tunnel in California in 1960. At that time the Robbins Company had bui

    Jan 1, 1987

  • AUSIMM
    Geostatistics and Sample Numbers from an Acid and Metalliferous Drainage Perspective

    By C Linklater, A Garvie, D Kentwell

    Various Australian and international regulatory bodies (Environmental Protection Authority, 2015) require an early assessment of the geochemistry of waste rock. This usually includes estimates of the

    Jun 28, 2016

  • AUSIMM
    Seismic Surveying for Coal Mine Planning

    More and more coal in Australia is extracted by underground mining methods especially by longwall mining. These methods can be particularly sensitive to relatively small-scale structural discontinuiti

    Jan 1, 2002

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Raising Sangdong – A Staged Approach to the Redevelopment of an Old Operation

    By C Lutherborrow

    The Sangdong Tungsten/Molybdenum Deposit is located in the Republic of Korea and was discovered in 1916. At this time Korea was a colony of Japan. It was mined for two years after discovery closing in

    Aug 22, 2011

  • AUSIMM
    Perimeter Control Utilising Electronic Detonators at Mount Wright Mine

    By J Wall

    The use of electronic detonators in civil tunnelling applications, to reduce vibration in small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen

    Mar 21, 2011

  • AUSIMM
    Novel Use of Ice Thermal Storage for Energy Management on a Mine Refrigeration Plant

    By R W. Wilson, A R. Branch, T S. Pooe

    The original bulk air cooling system at this particular mine made use of two water chilling refrigeration machines to produce peak cooling of approximately 12 MWR with a downcast air temperature of ab

    Aug 31, 2015

  • AUSIMM
    Safety Management - A Multifaceted Approach

    In todayÆs demanding business landscape continual change and technological advancement is a given. With these changes there is now, more than ever, a need to ensure sustainable growth in respect of va

    Jan 1, 2006

  • AUSIMM
    A comparison of CPT based state parameter estimates in coal boiler ash

    By B Wentzinger

    This paper presents the results of state parameter estimates in an active coal boiler ash storage facility using the most recent methods currently in use for cone penetrometer interpretation. State pa

    Jul 1, 2021