  • AUSIMM
    Underground Stope Drill and Blast Designs Optimisation Program

    By C Preston, T Williams, D Roy

    The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in unde

    Aug 24, 2015

  • AUSIMM
    Mine to Mill Reconciliations at Paddington Gold Mine

    Paddington processing plant is located approximately 30 km north of Kalgoorlie on the Menzies Highway and is owned by Placer Dome Asia Pacific. First mining was from the Paddington Pit, but in subsequ

    Jan 1, 2003

  • AUSIMM
    The OK Tedi Project

    Ok Tedi Mining Limited commenced construction in mid-1981 of facilities and infrastructure to mine and process gold ore at Mt Fubilan in Papua ew Guinea. Production ofgold began more or less on schedu

    Jan 1, 1985

  • AUSIMM
    Performance of Cover System Field Trials for Waste Rock at Myra Falls Operations

    By S Januszewski and, G Dirom, D Christensen

    Four field test plots were constructed in 1998 on a sloped waste rock surface at the Myra Falls Operations of Boliden Westmin (Canada) Limited to evaluate hydraulic performance of alternate cover syst

    Jan 1, 2003

  • AUSIMM
    The New Latent Conditions Clause in the Recent as 2124-1986, General Conditions of Contract and its Application in Tunnelling Contracts

    The latent conditions clause in various general conditions of contract have traditionally proved to be a source of significant disputes in tunnelling contracts, even when extensive geotechnical i

    Jan 1, 1987

  • AUSIMM
    Selection of Hoisting Wire Ropes Used in Indian Mines - An Economical Approach

    By M K. Singh

    Mining is nothing but an art - besides being a science - of extracting valuable minerals from the womb of the mother earth. In this gigantic task, a large number of machinery and equipment are employe

    Jan 1, 2000

  • AUSIMM
    Research and Application of Total Tailings Backfill at Zhangmatun Iron Mine

    By Wang Xia, Zhou Aiming, Shi Shengyi

    Zhangmatun Iron Mine is situated in the suburbs of Jinan city, Shandong, China. Because of surface environmental constraints, no suitable site can be selected to dispose of mill waste. The full mill t

    Jan 1, 1998

  • AUSIMM
    The Underground Quarrying of Backfill Material - A Potentially Viable Option (3e0fe107-4258-4ea0-abd2-b85d48fc35ff)

    By Robertson AC

    Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mi

    Jan 1, 1998

  • AUSIMM
    The Underground Quarrying of Backfill Material - A Potentially Viable Option

    By A C. Robertson

    Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mini

    Jan 1, 1998

  • AUSIMM
    Review of Trailings Dam Design and Construction Techniques in North America

    There are many factors influencing the way in which a mining company disposes of tailings. Some of the more important factors include physical and chemical properties of tailings, cost, availabilit

    Jan 1, 1989

  • AUSIMM
    Recent Concepts for the Extended Use of Draglines in Deeper Stripping Applications

    By Aspinall T. O

    Draglines have found wide application in strip mining coal seams down to 60m depth. A research Project funded through NERDDC has been underway during the past two years investigating the application

    Jan 1, 1989

  • AUSIMM
    The Greenvale Mine and Railway

    Development of the Greenvale orebody, containing 40,000,000 tonnes of nickel ore, began in 1971 and production commenced in 1974. Annual capacity is 2,800,000 wet tonnes. The variations in ore grade

    Jan 1, 1974

  • AUSIMM
    Critical Comparison of Julius Kruttschnitt Mineral Research Centre (JKMRC) Blast Fragmentation Models

    By I Brunton

    Blast fragmentation can have a significant impact on the profitability of a mine. An optimum run of mine (ROM) size distribution is required to maximise the performance of downstream processes. If thi

    Jan 1, 2001

  • AUSIMM
    Strategic thinking about long-term ‘above ground’ orebody complexity using scenarios

    By T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench

    The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as

    Nov 21, 2018

  • AUSIMM
    Development of Boomtype Tunnelling Machine for Hard Rock

    By Itoh K, Sakai K, Tsuji K

    In Japan there exists a strong demand for mechanical excavation for tunnelling bacause the blasting method which produces much vibra- tions and noises is restricted in its applica- tion due to the f

    Jan 1, 1987

  • AUSIMM
    Application of Computer Assisted Modelling to Final Wall Blast Design

    By Jones J. P, Arriagada J, Scherpenisse C. R

    A recently-developed model is used as a tool to optimise the design of blasts used to create final walls in large open pit mines. The use of this tool has allowed present blasting practice and propo

    Jan 1, 1995

  • AUSIMM
    Water Management Issues for Mining Proposals at the Environmental Impact Assessment Stage

    An Environmental Impact Statement (EIS) for a major mining development typically has to address various aspects of surface water management, including some which generally tend to be the more contenti

    Jan 1, 2003

  • AUSIMM
    Application of High-resolution Seismic Reflection Surveys to Exploration for Blind Vein Systems at the Cracow Low-sulfidation Epithermal Field

    By J Cook, S Pike, D Pridmore

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The application of high-resolution seismic reflection to map structure and/or mineralisatio

    Mar 18, 2015

  • AUSIMM
    The Importance of Fine Ore Chemical Composition and High Temperature Phase Relations ù Applications to Iron Ore Sintering and Pelletising

    By J M. F Clout

    In the iron ore industry significant emphasis is placed throughout the mining process on meeting chemical composition specifications for the export of fine ores, however, little has been published on

    Jan 1, 2002

  • AUSIMM
    Integrated Photogrammetry and Discrete Fracture Network Modelling for Improved Rock Mass Characterisation and Engineering Design

    By S F. Rogers, P W. Booth

    Digital photogrammetry is revolutionising the task of geotechnical mapping of jointed rock masses and has greatly increased in popularity and sophistication in recent years. Modern commercially availa

    Sep 17, 2014