    Copper Converter Slag Treatment at Mount Isa Mines Limited, Mount Isa, Qld

    By Hare S. M, Lumsdaine I, O&apos

    Converter slag assaying 3.7 per cent Cu is produced by Mount Isa copper smelter at a rate of up to 180 000 tonnes per annum.Priority is given to the processing of ore, however concentrator capacity pe

    Jan 1, 1993

  • AUSIMM
    Intelligent Mine Technology Program and its Implementation

    By P SSrkkS

    Mining is commonly seen as a typical basic industry with rough and even dangerous working conditions, heavy environmental load, and a low level of high-technology and automation with much manual work

    Jan 1, 2000

  • AUSIMM
    The Artificial Ventilation of the Broken Hill Proprietary Mine, N.S.W.

    UNLIKE coal mines, in which some form of artificial ventilation is rendered necessary by gases given off by the material mined and is also enforced by the mining laws of all countries, metalliferous m

    Jan 1, 1921

  • AUSIMM
    Practical Emission Control of Coal Fired Power Stations

    The following is based on two examples of emission control with coal fired power stations as practised in Germany at Heilbronn Block 7 power station and the Rheinbraun coal combined power station w

    Jan 1, 1991

  • AUSIMM
    The Relationship between Blasting Parameters and Muck Pile Configuration

    By D Van Doorselaere

    The purpose of blasting during mining is to produce a muck pile that can be efficiently loaded and transported. There is an increasing awareness of the variation in muck pile characteristics and its e

    Aug 24, 2015

  • AUSIMM
    Optimisation of Wash Water on an Iron Ore Spiral to Improve Grade

    By C M. Ramotsabi, F Bornman, W Erasmus

    Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine

    Jul 13, 2015

  • AUSIMM
    NicolsonÆs Find Gold Project, East Kimberley, Western Australia

    By M Csar

    The Nicolsons Find gold project is located 35 km southwest of Halls Creek in the east Kimberley. It was discovered in the late 1980s by John Nicolson and Stuart Skoglund, when high grade gold minerali

    Mar 26, 2012

  • AUSIMM
    Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, Australia

    By Read T. A

    THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to

    Jan 1, 1921

  • AUSIMM
    State-of-the-Art in Tunnel Ventilation Systems Design – Applicable Options to Meet Fire-Life-Safety Code Requirements

    By P C. Miclea

    Transportation networks extend every day around the world, requiring safe and well-maintained structures for efficiency and for users’ safety. Due to specific features of the infrastructure, such as l

    Mar 8, 2011

  • AUSIMM
    A Review ù Pillar Stability Issues at DOZ Block Cave Mine

    By D Flint, O Rindriatmoko

    PT FreeportÆs Deep Ore Zone (DOZ) Mine is the latest block cave mine within the East Ertsberg Skarn System (EESS).Issues with undercutting and stress concentrations at the extraction level were experi

    Jan 1, 2005

  • AUSIMM
    Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine

    By J J. Grobler

    The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified

    Mar 21, 2011

  • AUSIMM
    Quantifying the quality of cable bolt installation by acoustic testing

    By M Hawkes, Z Ji Gang, Z Ming, R Hassell

    As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif

    Mar 15, 2021

  • AUSIMM
    How Safe is Safe Enough?- A Paper on Risk Management in the Mining Industry

    By Neville Rockhouse

    This paper examines the interrelationship of conducting full risk assessments in the context of the coal mining industry and under the framework of the Health's Safety in Employment Act 1992. In the c

    Jan 1, 2007

  • AUSIMM
    Heterogeneity and bulk ore sorting – methods to estimate ore sorting performance

    By J Rutter, S Dunham

    Technological advances in sensor and material handling technology has enabled a step change in mine operations performance. Sensors capable of monitoring the grade of broken rock mass can be mounted o

    Nov 10, 2020

  • AUSIMM
    Some Practical Problems in Running Statistically Valid Plant Trials, and Their Solution

    Operating metallurgists spend a significant part of their time running plant trials to compare two or more conditions in order to improve the process, such as a new reagent, flow sheet or piece of equ

    Jan 1, 2008

  • AUSIMM
    Review of Variogram Properties and Remarks on its Use in Process Control

    By D M. Frantois-Bongarton

    Variograms can be powerful tools for the analysis and control of process streams and their sampling. Their uses and proper utilisation have been described somewhat unclearly to date, and their limitat

    Aug 21, 2012

  • AUSIMM
    Alternative Access, Mining and Hoisting for Underground Deposits

    It is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam

    Jan 1, 2000

  • AUSIMM
    Closure Planning for a Going Concern

    How do you initiate closure planning for a mine site that is on the doorstep of a major community without generating the extremes of panic or complacency? That is the question that is faced by Austral

    Jun 1, 2010

  • AUSIMM
    Classified Tailings as Part of an Integrated Regional Support System

    Western Deep Levels, a seismically active deep level gold mine, started placing backfill in their narrow tabular workings as part of the regional support strategy in 1986. Over the years the percentag

    Jan 1, 1998

  • AUSIMM
    Classified Tailings as Part of an Intergrated Regional Support System

    By D R Van Eck

    Western Deep Levels, a seismically active deep level told mine. stalled placing backfill in their narrow tabular workings as part of the regional support strategy in 1986. Over the years the percent

    Jan 1, 1998