  • AUSIMM
    Control of Water Discharge From Mine Ventilation Shafts

    Problems caused by water discharge from surface mine ventilation shafts can be significant and are usually unforseen. The discharged water is often hyper-saline or acidic and can cause environmental d

    Jan 1, 2002

  • AUSIMM
    A Modified Software Tool for Mine Waste Rock Dump Planning

    By Z Fu, E Topal, O Erten

    "Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o

    Nov 15, 2016

  • AUSIMM
    Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat Basins

    By R Strand, L Reading, G Keir

    A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart

    Nov 26, 2013

  • AUSIMM
    Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in Concentrate

    By M Spagnolo, M Ashley, D, L Reemeyer

    PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in

    Jan 1, 2003

  • AUSIMM
    Geotechnical behaviour of spent ore – impacts of metallurgical factors

    By R Rimmelin, C Vergara

    Heap leach pads are composed of mined ore, usually crushed, disposed on liners to be processed with leach solutions, and the tail of the process is called “spent ore” which are then transported by con

    Jul 23, 2018

  • AUSIMM
    Ensuring an Effective Principal Hazard Management Plan

    By A J. Clough

    There has been an unprecedented rise in the fatality rate in the Australian mining industry over the last few years. The factors behind this rise are not clear; however, it is noted that the increase

    Aug 31, 2015

  • AUSIMM
    Predicting the Benefit of Gravity Recovery Prior to Flotation

    Batch centrifugal gravity concentrators have become standard equipment in gold grinding circuits for recovery of gravity recoverable gold (GRG). The downstream benefits of installing a gravity circuit

    Aug 1, 2010

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014

  • AUSIMM
    An Expiremental Investigation on Cable Reinforcement

    By Fabjanczyk MW, Aziz NI, Hii J

    The paper presents the results of a series of pull out tests performed on roof reinforcement systems currently being adopted in mines in Australia 7mm wire, dividag bar, 15.2mm strand cable, and b

    Jan 1, 1986

  • AUSIMM
    Practical Considerations for Multimine Grade Reconciliation

    This paper discusses the implementation and potential limitations of the method for estimating sampling and analytical errors of multiple source mine output blended into a shipping product, described

    Mar 1, 2010

  • AUSIMM
    The Transition from Semi-autogenous to Autogenous Milling at Waihi Gold

    By D Bertoldi, C Haines

    "The Waihi Gold Mine (WGM) operated by OceanaGold New Zealand Limited is a wholly owned subsidiary of the OceanaGold Corporation of Australia. Traditionally WGM has stockpiled and processed separate c

    Oct 10, 2016

  • AUSIMM
    Geology and Mineralization of the Mammoth Copper Deposit

    The Mammoth Copper Deposit consists of three distinct orebodies adjacent to the Mammoth Fault. This fault is arcuate, changing from a normal tension fault to a shear strike fault just to the north

    Jan 1, 1974

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    The irrefutable value of introducing a dynamic transport term into mill modelling

    By D K. Weatherley, A N. Mainza, I Govender, L M. Tavares, M S. Powell

    It is understood that rocks do not instantaneously transport along a grinding mill and are consequently not perfectly mixed, but this is conveniently overlooked in mill modelling. A lack of understand

    Aug 24, 2022

  • AUSIMM
    Intensity quantification of coal and rock burst risk – a review

    By C Zhang, I Canbulat, G Fan, D Zhang, C Wang

    A clear understanding of the intensity of coal and rock burst is the basis for future research on burst mechanism and control. There has been a wide variety in the description of coal and rock burst d

    Nov 30, 2018

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    A General Description of Mining Operations at Vatukoula, Fiji

    Vatukoula, the Fijian equivalent of gold rock, is the name of the community embracing the gold mines owned and operated by Emperor Gold Mining Company Ltd., Loloma (Fiji) Gold Mines, N.L., and' D

    Jan 1, 1953

  • AUSIMM
    Numerical Analysis of Extreme Deformation and Ground Support Performance at the N3500 Project

    The N3500 orebody is the northern continuation of the 3500 orebody at Xstrata Copper's Enterprise Mine and occurs at a depth of 1.3 to 1.8 km. At the nearby S3500 orebody, extreme deformation was

    Nov 25, 2010

  • AUSIMM
    Life-of-Mine Planning in a Dynamic Environment

    By I Manege, S M. Bennett

    The PT Kaltim Prima Coal (KPC) operation is a large scale coalmine operating on the east coast of Kalimantan (Borneo), Indonesia. Originally developed under a coal contract of work (CCOW) with the Ind

    Jul 16, 2014

  • AUSIMM
    Sampling Quality Assurance and Quality Control Requirements for Mining Projects

    The creation of an accurate and precise enough database requires the collection of many representative samples, subsampling and assaying them without destroying their integrity. The selection and impl

    Mar 1, 2010