Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Implementation of the BIOX® process at the Runruno Gold projectBy J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017
-
Dealing with Water Issues in Abandoned Metalliferous Mine Reclamation in the United KingdomThis paper attempts to draw together the experience of over 30 years of research and practice in the United Kingdom on the rehabilitation of abandoned metalliferous mining wastes. The reliance on wate
Jan 1, 2006
-
Study of Waste Water Quality Management in Illawarra Coal MinesBy Dharmappa HB, Sivakumar M
This paper is concerned with two case histories of wastewater quality management in underground coal mines in the Illawarra region. The first investigation briefly presents an analysis of mine water d
Jan 1, 1998
-
Improved Planning and Scheduling by Integration of Mining Application SoftrwareBy Aspinall T. O, Just G. D
Computer software systems have been developed to assist in a wide range of specific mine planning and scheduling applications. In selecting appropriate systems for any mining operation it is apparent
Jan 1, 1992
-
Framework for Strategic Water Management in the Minerals IndustryAccess to secure and reliable water resources is fundamental to the minerals industry. In recognition of that requirement, and cognisant of extensive contemporary public water debate and reform initia
Jan 1, 2006
-
Plant Design for Remote Locations in Papua New GuineaBy Majorkiewicz A
Engineering of gold treatment facilities complete with infrastruc- ture in a remote location such as Papua NewòGuinea present unique problems to the design team. Site location, topography, ground co
Jan 1, 1991
-
An Overview of Current Planning and Production Systems at McArthur River MineBy M Gwynne
McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping
Jan 1, 1998
-
Elouera Colliery Mine Access - Design of a Portal and Tunnel in Soft GroundBy H Bleuler
A new portal and access drift was constructed by Concrete Constructions for BHPÆs Elouera Colliery, south of Wollongong.The portal area at the base of the Illawarra Escarpment is in soft colluvium mat
Jan 1, 1999
-
Increased drilling accuracy leads to significant improvement in ore recovery and dilutionBy R Stimpson, B Johnson, B Hesse
During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto
Mar 15, 2021
-
Strategic Aspects of Latrobe Valley Coal Resource UtilisationBy Henderson N, Schaap H
In large companies with mining operations spread over multiple sites, it is essential that consistency between sites is maintained in preparing and classifying resource and reserve estimates. The en
Jan 1, 1990
-
Recovery Improvement Project for the Ridgeway Concentrator at Newcrest's Cadia Valley OperationsBy F Cesnik
The past few years has seen a concerted effort to improve the recovery of gold along with its co-product copper from the æhigh-gradeÆ Ridgeway concentrator at Newcrest Mining LtdÆs Cadia Valley Operat
Jan 1, 2007
-
The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement PlantBy Hill G
The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi
Jan 1, 1992
-
Shear strength of compacted clay liner at McArthur River MineBy Y Xu, J Hacker, D J. Williams
Shear strength parameters of compacted clay liners are needed to analyse the stability of mine waste dumps containing compacted clay liners as sealing layers for potentially acid forming waste rock. A
Jul 23, 2018
-
An Alternative Circuit for Chalcopyrite-Pyrite Ores with Elevated Pyrite Content in Cu-Au Ore TreatmentBy S Farrokhpay, C Akop
Copper-gold-pyrite ore types with an elevated pyrite head grade utilise a sequential flotation circuit to recover initially a copper-gold concentrate with a pyrite-gold concentrate being produced from
Sep 1, 2014
-
Review of Microbial Involvement in Biogeochemical Processes Related to Radionuclide MigrationThe mobility of radionuclides released into aquatic, terrestrial and subsurface environments by mining, industrial processes is an area that deserves significant scientific attention. The presence of
Jan 1, 2004
-
Modular SAG mill discharge trommel for maintenance flexibility and performanceBy K Katov, S T. Ciutina, J D. Pyke
The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s
Aug 29, 2018
-
Survey Work in Connection with the Sinking of No. 7 Shaft, Broken Hill South Limited, Broken Hill, N.S.W.THE South Mine. owned by the Broken Hill South Limited, occupies mineral leases 7 and 8 on the Broken Hill lode. The ore reserves are 4,250,000 tons, and the ore hauled for the year ended June, 1930,
Jan 1, 1930
-
Acid Mine Drainage Treatment at Herbert Stream, StocktonBy M Watts, P Lindsay
Herbert Stream, a tributary of the Waimangaroa River on the Stockton Plateau, has elevated metal concentrations and low pH characteristic of acid mine drainage (AMD). Dissolved aluminium concentration
Jan 1, 2007
-
The International Code, Mineral Resource Management and Corporate GovernanceThis paper examines the broader implications of recent and ongoing changes in mineral resource managementå and reporting practices and the impact that these might have on mining companies. It is likel
Jan 1, 2002
-
Mass Blasting at Elura MineBy G Kennewell
At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in resp
Jan 1, 1999