Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rehabilitation At Stawell Joint Venture

    It was once considered sufficient to revegetate old mine sites using grass or trees. At the commencement of the Stawell JV (SJV) operation in 1981, management determined that pre-existing vegetation w

    Jan 1, 1992

  • AUSIMM
    Microalgae in mining – environmental and social opportunities

    By A E. Levett, J Durbin

    The environmental, social and governance (ESG) obligations of mining companies promote the consideration of water and land resources as well as the post-mining employment opportunities following the c

    Aug 2, 2023

  • AUSIMM
    Soft Computing Approach to Predict Blast-induced Flyrock

    By N Gupta, R Trivedi, S Bhandari

    Managing blasting operations in four mines surrounded by villages is a challenging task. This study aims to compare the blast-induced flyrock as observed in opencast mines by predicting flyrock distan

    Aug 24, 2015

  • AUSIMM
    Manganese ù From Waste to High-tech Material

    By M D. Urbani

    HiTec Energy Ltd has been conducting research since 1996 into novel process routes for the treatment of low-grade and waste manganese sources for the production of high value and high quality electrol

    Jan 1, 2004

  • AUSIMM
    Blasting Risk Management ù Hazards, Variations and Opportunities

    The risks faced by organisations are part of a risk continuum. They can be evaluated in terms of hazard, uncertainty and opportunity as well as by the degree of influence they have on conformance, ope

    Jan 1, 2001

  • AUSIMM
    Metal Balance for Olympic Dam Using a Standard Industrial Software Package

    By R Gilbertson, N Freeman

    Metallurgical accounting is key to the control and production planning process of any mining operation. This is even more crucial for complex operations involving mining, concentration, smelting, refi

    Jan 1, 2002

  • AUSIMM
    Fragmentation Optimisation – Adopting Mine to Mill for Reducing Costs and Increasing Productivity

    By V M. Silva, P A. A Martins, V O. Matthew, A L. S Fonseca, E B. Cunha, A J. D Ferrari, E M. S Silva, A C. Silva, D R. T Vilela

    The Anglo American phosphate mine is located in the Brazilian state of Goiás and possesses one of Brazil’s most important phosphate rock deposits, with the site being the country’s second largest

    Aug 24, 2015

  • AUSIMM
    Long Term Mine Planning at BHP Iron Ore Ltd's Mt Whaleback Mine

    By R D ROSENTHAL

    BHP Iron Ore Ltd's Mt Whaleback is the largest single open-pit iron ore mine in the Pilbara region of Northwestern Western Australia. A division of BHP Minerals, one of three core businesses o

    Jan 1, 1992

  • AUSIMM
    Flotation machine gas characterisation – variation between different types of flotation machines

    By D Felipe, G J. Harbort

    In the past 40 years substantial changes have occurred in flotation machines. This has included increases in mechanical cell size to 630 m3 , significant changes to flotation column aeration design

    Aug 24, 2022

  • AUSIMM
    High-Resolution Pit Water Quality Model for the Highway Reward Mine, Queensland, Australia

    By B G. Lottermoser

    Field and laboratory data combined with computational modelling have been used to predict the pit water quality for the Highway Reward mine. Open pit mining of the Highway Reward copper-gold deposit h

    Jan 1, 2003

  • AUSIMM
    Improved hydration management on Australian mine sites with the MX3 hydration testing system

    By T Kilpatrick

    Managing heat stress on Australian mine sites is a complex and enduring challenge due to the combined and variable contribution of environmental conditions, physical activities, and protective equipme

    May 5, 2022

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • AUSIMM
    Location Aware Mine Machinery for Productivity and Safety Improvements

    Fleet management systems have been adopted by many open pit mines throughout the world and the resulting improvement in truck cycle times has been one of the most significant contributors to mine effi

    Jan 1, 2008

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper Mine

    By K Myers

    Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg

    Jan 1, 2003

  • AUSIMM
    Integrated Communications for Surface and Open Pit Applications

    By G Booth

    Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope

    Jan 1, 2008

  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Quality programs (QAQC) on Sample Stations – a prerequisite to achieve standards requirements and perform a robust reconciliation

    By O Dominguez

    Mine value chain reconciliation (MVC) is a necessary procedure to evaluate a mine’s performance against the assumptions and models used to plan mining and processing operations. Using nomenclature fro

    Mar 22, 2022

  • AUSIMM
    Thermodynamic Studies of Liquid Iron Alloys by a Mass Spectrometer Equpped with a Newly Developed Ion Current Measuring System

    By Yamada K, Abe H

    Magnetic scanning type mass spectrometers have been given improved sensitivity with a large dynamic range and considerable resolution by the addition of a computer-controlled electric equipment. A

    Jan 1, 1980