Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days
Jan 1, 1988
-
Official Opening and AddressGood morning. I am very pleased to be invited to present the Opening Address to this inaugural New Zealand Minerals & Mining Conference. It is indeed a pleasure to see so many representatives of t
Jan 1, 1997
-
Phreatic uncertainty in the unsaturated zone of tailings storage facilities: an examination of two Australian case studiesBy E J. Coyle, L A. Millington
Tailings storage facilities are geotechnically complicated structures that develop heterogeneous strength profiles and varied porewater conditions. The monitoring of porewater pressures is one of the
Jul 1, 2021
-
The Role and Contribution of Revegetation Strategies to Water Management for Effective Mine ClosureMining is an intensive resource development industry, where operations are often of relatively short duration and can result in dramatic impacts on the natural environment during the operational perio
Jan 1, 2003
-
Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspectiveBy A Kleinitz, J Halilovic, K Trappitt
Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne
Mar 22, 2022
-
The Hydrogeological Problems of Groundwater Protection in Mining RegionsThe investigations of the Leningrad ruining lilstitute on this problem are carrying out in the following main directions: 1) The analysis and study of contaminants migration at particular sites of m
Jan 1, 1988
-
Water Use in the Mining Industry ù Threats and OpportunitiesBy C Hertle, B Goebel, R Fabre
The mining industry maintains a ælove-hateÆ relationship with water. Dewatering, aquifer, water disposal, irrigation, process water, tailings water, run-off water, seepage, leachate and sumps are all
Jan 1, 2006
-
Gold, Conveyor Belts, and Efficiency A Guide to Cleaning Belts and Improving Transfer Points on Gold Mining and Processing ConveyorsInefficient conveyors suffer carryback, leading to the build-up of materials on idlers, and other expensive components. They spill and leak material at loading zones and transfer points, causing acc
Jan 1, 1991
-
QEMSCAN« and Microprobe Studies on the Chromitite of Sittampundi Anorthosite Complex, Tamil Nadu û Implications for Platinum Group Element MineralisationBy R K. W Merkle, E Whiteman
The anorthosite complexes and related rock types of the Indian Precambrian shield are primarily associated with either cratons or mobile belts. They were metamorphosed under amphibolite to granulite f
Jan 1, 2008
-
Advancing slam in underground mines – a unique marker-based approach for enhanced navigation and mappingBy B P. Banerjee. S Raval, P M. Ranasinghe
Simultaneous Localisation and Mapping (SLAM) is an important technology that enables autonomous robots to navigate independently and create detailed, real-time maps of their surroundings. This capabil
Sep 1, 2024
-
Model Studies of Optimized Crater BlastingBy Fourney W. L, Dick R. D
Tests were conducted in plexiglass and Rockite models to determine if crater blasting could be improved by changes in charge geometry or by alterations to the borehole. Circumferential grooves were
Jan 1, 1990
-
Reflectance Spectroscopy Monitoring of the Petroglyphs of the Burrup Peninsula, Western AustraliaBy S Furman, M Caccetta, A Hacket, B McDonald, M A. Wells, D Lau
In 2004, the Western Australian Department of Industry and ResourcesÆ Burrup Rock Art Management Committee commissioned a number of independent scientific studies to evaluate the condition of rock art
Jan 1, 2008
-
Life of Mine Land Use Plan - Comalco WeipaThis paper outlines the aims, objectives and means by which a life of mine land use plan was established for Comalco's bauxite mine at Weipa. Comalco realises the need to strategically plan for f
Jan 1, 1992
-
Argyle Project-The Case for CommutingBy Butcher NM, Walker GS
Argyle Diamond Mines Pty. Limited (ADM), manager and operator of the Argyle Diamond Mines Joint Venture (ADMJV) will recruit approximately 400 employees during 1985 to operate the new large-scale,
Jan 1, 1984
-
Effect of Cupric on the Separation of Pyrite from ArsenopyriteBy Shinnosuke U, Zhang HE
In this paper, it is shown that the higher the pre-activation concentration of copper ions in pulp, the larger the adsorption amounts of copper ions and xanthate on arsenopyrite surface, and the bet
Jan 1, 1993
-
A higher standard of ‘safety’By A Turns
In a survey conducted by symplexi with underground miners in Australia; 78 per cent of participants believed that ‘safety’ is all about people. If ‘safety’ is about people, then is the mining industry
May 5, 2022
-
Water treatment in perpetuity – or not?By R J. Higgins, M Edraki
What is the meaning of the Life of a Mine (LOM) if that mine results in a requirement for water treatment in perpetuity? ‘In perpetuity’ is of course a duration with no relationship to a Life-of-Mine
Jul 25, 2018
-
Geology of Perseverance Nickel Deposit, Western AustraliaBy Alichurch P. D
Perseverance nickel deposit is located at latitude 27¦ 491S, longitude 1200 42'E, 330 km north of Kalgoorlie, Western Australia. Gossanous outcrops were discovered in April, 1971, and after fur
Jan 1, 1973
-
Relocating Waihi's Cornish PumphouseWaihiÆs Cornish Pumphouse is located on the edge of town in a dynamic and changeable area where history affects the future. As in any successful project, ingenuity and team work have been significant
Jan 1, 2006
-
Sinking No. 7 Shaft û Broken Hill South LimitedThe purpose of this paper is to discuss briefly the problems encountered in designing and sinking No 7 shaft, and to present the methods employed in the operation.The illustrations accompanying the pa
Jan 1, 1932