Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Maximising Payable Gold in Base Metal

    Breakwater Resources Ltd is a Canadian base metals producer with Cu-Pb-Zn operations in Canada, Honduras, and Chile. Two of its operations contain economical gold levels which are recovered in both gr

    Aug 1, 2010

  • AUSIMM
    Progress in Developing a Geometallurgy Flotation Indicator

    By T Napier-Munn, D J. Bradshaw, M Chauhan, L Keeney

    An important aspect of geometallurgy is quantifying mineral processing attributes, which leads to improved orebody understanding. One of these attributes is flotation performance. Several methods have

    Sep 29, 2013

  • AUSIMM
    Developments in Explosive SupplierûCustomer Relationships

    The original and most basic relationship between mining company and explosive supplier was a simple one of consumer and product supplier. The divide between the two was quite clear-cut with neither ta

    Jan 1, 2004

  • AUSIMM
    Sulfur – the new geometallurgical grade in gold-sulfide deposits

    By S Juras

    To our geologists at Eldorado Gold Corporation, the release of the gold assays on a new ore zone causes a flurry of excitement. But to our metallurgists, that news is often greeted with the question ‘

    Sep 20, 2017

  • AUSIMM
    Improved Flotation Process Control at Newcrest's Telfer Operation

    By S Hille, J Karageorgos

    With the increased variability of todayÆs large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcrest Te

    Jan 1, 2007

  • AUSIMM
    Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvals

    By C Tomlin, C Gimber

    Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation

    Aug 2, 2023

  • AUSIMM
    Some considerations on the engineering performance of subaqueously‐deposited silts

    By D Reid

    Many of the relevant engineering behaviours of tailings are controlled to a large degree by the density of the material. For example, loose tailings are prone to brittle strength loss, while dense tai

    Jul 1, 2021

  • AUSIMM
    Comparison of Excavation Methods in Different Ground Conditions with the Decision Aids for Tunnelling

    By F Sandrone, J-P Dudt, J Zhao, E Paltrinieri

    Tunnel boring machines (TBMs) excavation is nowadays more and more considered a valuable alternative to conventional tunnelling. As a matter of fact, thanks to its advantages such as greater rate of a

    Sep 17, 2014

  • AUSIMM
    HARP Modelling – A New Method of Representing Complex Stratigraphic Deposits

    By P Odins

    Traditionally, stratigraphic deposits have been represented by a large number of gridded surface and product analytical models, related to each other by naming convention. This approach, though suitab

    Aug 22, 2011

  • AUSIMM
    Pisolitic Limonite Deposits in Northwest Australia

    By Morgan B. D

    Since the mid 1950s, limonite deposits of a new type have been found in the northwest of Western Australia. The deposits consist of extensive fossil valley fillings up to several hundred feet in depth

    Jan 1, 1964

  • AUSIMM
    The Interaction Between Geology, Mining and Metallurgy at Stawell Gold Mines Pty Ltd

    Stawell Gold Mines Pty Ltd operates two underground decline mines within the township of Stawell. An active exploration program and commitment by owners to improving the ore reserves has led to an imp

    Jan 1, 2000

  • AUSIMM
    Considerations for Design of Production Level Drawpoint Layouts for a Deep Block Cave

    By P Bartlett, K Naidoo

    Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively

    Jan 1, 2000

  • AUSIMM
    Mine productivity and equipment selection impacts with operational grade engineering

    By A F. von Wielligh, M Scott, L Keeney

    Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine

    Nov 10, 2020

  • AUSIMM
    A New Look at Multiple-Point Geostatistics for Geological Modelling

    By B F. J Kelly

    Multiple-point simulation is a family of methods used to generate conditional facies simulations that present the same spatial dependence as a user-defined training image. The main advantage of using

    Sep 26, 2011

  • AUSIMM
    Methodology for Selecting Borehole Samples of Iron Ore for Mineral Processing Characterisation

    By G J. I dos Santos

    The risk assessment of mining projects is directly related to the possible failure in estimating, and as estimates are made from sampling results, this activity should be done in a judicious and plann

    Jul 11, 2011

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Recoverable Resource Estimation Using Bivariate Uniform Conditioning at the Lihir Gold Mine

    By A Tomsett, R Kidd, Z Casley

    Bivariate recoverable resource estimation aims at predicting the recovered metal for a secondary variable when a cut-off is applied to a primary variable. The choice of a consistent geostatistical mod

    Jan 1, 2009

  • AUSIMM
    Flotation Process Control Optimisation at Prominent Hill

    By J Lombardi

    OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an

    Aug 8, 2011

  • AUSIMM
    Successful Risk Management Through Project Life Cycle for Removal of the Crown Pillar at the Marvel Loch Underground Mine

    By S C. Barrie

    St BarbaraÆs Marvel Loch operations have successfully used longhole open stoping as the primary mining method for a number of years. A transition to Core and Shell mining was implemented in 2009 to re

    Nov 20, 2012

  • AUSIMM
    Lowering risk in complex mineralisation: application of mobile supersucker development

    By K Biegaj, S C. Dominy

    A high-nugget effect and presence of coarse gold characterises many styles of gold mineralisation. The effective sampling of these deposits is often difficult because of the relatively low concentrati

    Nov 21, 2018