Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Quantitative Risk Assessment Tools to Assist with Waste Management and Placement Guidelines

    By S Lehane, S Pearce

    The characterisation and assessment of waste rock has been the subject of considerable research, and many guidance documents have been published both internationally and within Australia. While these

    Jul 27, 2015

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • AUSIMM
    Loading of Au(CN)2 - Solution Onto Activated Carbon

    By Linge HG, Klauber C

    The key element in the carbon-in-pulp process for gold processing is the loading of dissolved Au(CN)2 from solution onto activated carbon. The mechanism and kinetics of this step have been examined

    Jan 1, 1989

  • AUSIMM
    Use of ?Tunnel Boring Machines in the Mine Environment

    By D Mather, H R. Asche

    "In the civil tunnelling field, the use of tunnel boring machines (TBM) has now overtaken the use of conventional excavation methods (drill and blast / roadheader). This is due to a number of reasons,

    Sep 17, 2014

  • AUSIMM
    Baseline Requirements for Biological Monitoring Programs Used to Assess Mining Impact

    By C L Humphrey

    Biological monitoring programs for environmental protection require techniques that will provide both early detection of possible adverse effects, and assessment of the ecological significance of th

    Jan 1, 1994

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Ventilation contaminant characterisation for a greenfield project

    By A Hatt

    This paper presents a case study of characterisation work undertaken at a greenfield exploration project to provide engineering and OH&S inputs for the design of a ventilation system. The paper discus

    Oct 12, 2022

  • AUSIMM
    Current Occupational Health Practice in the Northern Territory Mining Industry

    By R Robinson

    Modem occupational health practice can be described as the fitting of work to the individual and each individual to his job; perhaps a non-traditional way to view occupational health. This two-compo

    Jan 1, 1994

  • AUSIMM
    AEROPHINE® 3418A Promoter as a Secondary Collector to Boost Nickel Recovery at Forrestania Nickel Operations

    By C Munro, S Emery, M Flynn, K Tan

    "AEROPHINE® 3418A Promoter is a well-known and widely used collector and is an industry standard for its excellent selectivity and efficacy in the processing of complex polymetallic sulfide ores,

    Oct 10, 2016

  • AUSIMM
    Adaptive and Intelligent Control of Cone Crushers

    By Bearman R. A, Parkin R. M

    In the comminution industry cone crushers are widely used for secondary and subsequent stages of size reduction. Traditionally cone crushers have been operated and monitored manually. Alteration of

    Jan 1, 1995

  • AUSIMM
    Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination Methods

    By S C. Dominy

    Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat

    Sep 5, 2011

  • AUSIMM
    The integration of mine-to-mill and grade engineering at Anglo American’s Los Bronces Mine using IES

    By J Rutter, E Amini, D La Rosa, N Beaton, M Scott, F Faramarz, L Keeney

    Anglo American’s Los Bronces copper mine in Chile has been conducting detailed assessments investigating value adding options for their asset. The mine has conducted several detailed Mine-to- Mill and

    Nov 10, 2020

  • AUSIMM
    Structure Response of a Brick Veneer House to Open Pit Coal Mine Blasting

    By A B. Richards

    A brick veneer house located on a open-pit coal mine lease has been subject to ground vibration levels of up to 222 mm/s, and air vibration levels of up to 145 dBL. The dynamic response of the structu

    Jan 1, 2001

  • AUSIMM
    Quantification of Drill Hole Deviation – Century Mine Case Study

    By C D. Pocock

    Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to

    Nov 8, 2011

  • AUSIMM
    Environmental Reclamation Practice in a Brazilian Coal Mine ù An Economical Approach

    By J F. Costa, A Grigorieff

    Coal mining reclamation is a worldwide concern. This paper presents a Brazilian example where the economic aspects of reclamation are considered. The basic goal of the study is to transform the reclam

    Jan 1, 2005

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Towards a model-informed process control strategy for coal flotation in a Jameson Cell

    By A J. Morrison, M Yahyaei, J S. Siong, J Wang, K Runge

    The flotation cells used to upgrade ultrafine metallurgical coal (-250 µm) are usually poorly controlled leading to unnecessary loss of combustibles from the flotation system. This is mainly because c

    Aug 24, 2022

  • AUSIMM
    Commissioning ù The Interface Between Construction and Operations

    This paper outlines the role of commissioning in the project cycle, shows how to get organised for commissioning and describes the principal commissioning activities. Emphasis is placed on appointing

    Jan 1, 2005

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021