Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mine Hoists for the Nickel Rim South ProjectBy T Gartner
This paper describes the design, manufacture and site services associated with the supply of mine hoists for the new mine under construction by Falconbridge Limited in Ontario, Canada. Two new shafts
Jan 1, 2005
-
South-west Ventilation Shaft Project at Newstan MineBy D Piason
Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of
Aug 31, 2015
-
Dealing with uncertainties on mining equipment fleet planning and usageBy I R. Souza
At the mining industry, there are several uncertainties that may affect the mobile mining equipment fleet sizing and usage, such as commodity supply and demand, which impacts the mineral price, enviro
Nov 8, 2021
-
Application of normative ore mineralogy to geological and metallurgical data sets at the Hera Au-Pb-Zn-Ag mine, New South Wales, AustraliaBy A R. McKinnon
The recently opened Hera Au-Pb-Zn-Ag mine in central New South Wales has provided an ideal opportunity to demonstrate the calculation of sulfide ore mineralogy using normative methods. Normative miner
Sep 20, 2017
-
Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)By C E. Woolley, H Jebaliya, J Foster
The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May
Jun 22, 2022
-
Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons LearntBy M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
-
Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer ProjectsBy N Lewis
Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying
Mar 8, 2011
-
Geotechnical strata characterisation using geophysics and its application for coal mine designBy T Medhurst
Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g
Nov 30, 2018
-
Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case StudyBy A Campbell
Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en
Nov 8, 2011
-
Drag sensor and other tools for real-time monitoring of a flotation processBy H Park, L Wang
Froth flotation is one of the most widely used beneficiation processes for fine and ultrafine coals and minerals. Maintaining optimal metallurgical performance in industrial flotation operation is sti
Aug 24, 2022
-
Understanding minerals in mineral processing – the basics and beyondBy E M. Wightman, C L. Evans
A recent survey of mineral processors undertaken as part of the International Mineral Processing Council (IMPC) Education Commission identified mineralogy as one of the key skills required for mineral
Aug 29, 2018
-
Geomembranes – from design to handover and some of the lessons learntBy A Marta
Geomembrane (GMB) liners are being used more frequently for the storage or capping of mine waste due to stricter regulatory requirements relating to environmental protection. The longevity of any li
Jul 23, 2018
-
Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with RefluxBy Iley J. D, Siviour N. g, Moffatt R. J
The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p
Jan 1, 1989
-
Opening Address (426caabf-1cdd-4389-bf74-85e3eb9fdd3a)It is a great pleasure to accept the invitation to open this Joint Conference of The Australasian Institute of Mining and Metallurgy and the American Institute of Mining, Metallurgical and Petrole
Jan 1, 1978
-
High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, PhilippinesBy C Harrison, A Bowskill
The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to
Sep 17, 2014
-
Managing Risk in Mining and Other Resources Projects ù Different Stakeholder Perspectives and Management OptionsManaging project exposure and risk has numerous viewpoints, including those of engineers, owners, bankers and insurers. Fewer stakeholders are involved in early stages, though with wider risk manageme
Jan 1, 2003
-
Auriferous Paleozoic Accretionary Terranes Within the Mongol - Okhotsk Suture Zone, Russian Far EastBy A C. Edwards
The Mongol-Okhotsk belt consists of detached fragments of the Circum Pacific fold belt which have been trapped within the Mongol-Okhotsk fold belt. In its western part, the structures of the belt form
Jan 1, 1999
-
Constraints on the Dynamics of Rifting and Denudation on the Eastern Margin of Australia: Fission Track Evidence for Two Discrete Causes of Rock CoolingBy A Raza, D P. Kohn, D A. Foster, A J. W Gleadow
A large and increasing data base of apatite fission track results from sedimentary and granitic rocks exposed within the south-eastern highlands and along the continental margin ofAustralia provides c
Jan 1, 1995
-
Proposed Model for High Speed Diamond Cutting of Hard RocksBy B Bamford
High speed diamond cutting has extensive applications in civil and mining engineering. A project involving the diamond sawing of black granite is investigating the nature of the diamond cutting proces
Jan 1, 1992
-
The design and implementation of the Kibali gold mine off-shaft developmentBy T Peters
The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with
Mar 29, 2023