Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    Oxidation at the Orieco Copper Mine, Eastern Tasmania

    At the Orieco mine quartz veins carrying sulphides were localized in parts of an extensive fault zone in the Mathinna Beds during late Middle Palaeozoic mineralization.These deposits were subsequently

    Jan 1, 1970

  • AUSIMM
    The Oxide Ore Treatment Plant, Mount Morgan

    This modern plant was installed with the object of treating all oxide ore and payable dump material by the cyanide process.The plant is located on a ridge on the eastern side of Linda Gully. The mill

    Jan 1, 1939

  • AUSIMM
    Increasing Face Ventilation in Coal Mines

    The author summarizes and extends the relevant results of papers previously published by various authors and presents these results in chart form. The charts are used to demonstrate the theory on a hy

    Jan 1, 1958

  • AUSIMM
    Oversize Reduction Project at the Iron Ore Company of Canada

    By R Pinksen

    The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque

    Jul 11, 2011

  • AUSIMM
    Structures and Field Relations of Epidiorite Dykes in the Broken Hill Orebody

    A study of literature on the epidiorite dykes which transgress the Broken Hill lode and its wall rocks reveals a considerable diversity of thought regarding the time of emplacement of such dykes. In t

    Jan 1, 1968

  • AUSIMM
    Prospecting for Fine Gold Using a Paper Chromatographic Method

    By Lever R. R

    The paper discusses assay methods generally used when prospecting for gold, and also the applicability of various chemical methods, it describes a new paper chromatographic technique.for making fairly

    Jan 1, 1959

  • AUSIMM
    Role of Bubbles in the Action of Flotation Agents

    Role of Bubbles in the Action of Flotation Agents

    Sep 13, 2010

  • AUSIMM
    Continuous Measurement of Liquid Retention and Drainage in Porous Media

    The amount of liquid retained in a porous bed is determined by weighing a column containing the bed.The column is attached to the free end of a cantilevered beam, and changes in weight are determined

    Jan 1, 1968

  • AUSIMM
    High-resolution erosion modelling using the RUSLE – an application to open cut coalmine operations

    By C M. Côte, P Bolz, R Chrystal

    The design of final landforms is an integral part of mine closure plans in Queensland and aims to ensure the rehabilitated land is safe, stable and non-polluting. Landform stability in this context is

    Aug 2, 2023

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • AUSIMM
    Smelting Practice at Mount Morgan

    By Hennessy F. L

    IntroductionEvolution of the Present SmelterRoastingFiringHearth SlopeDust HandlingFurnace DetailsSmeltingFurnaceFeed DeliveryPulverised Coal FiringWaste Heat BoilersDust HandlingAir PreheaterReverber

    Jan 1, 1952

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016

  • AUSIMM
    Mesothermal Gold Deposits of Westland, New Zealand and Southern Alaska: Products of Similar Tectonic Processes?

    By D Skinner, P Haeussler, D Bradley, A Christie

    Mesothermal gold deposits of southernAlaska and Westland, New Zealand have both formed at the seaward edge of major collisional zones in the Pacific basin. In Alaska, production of large fluid volumes

    Jan 1, 1995

  • AUSIMM
    Use of Large Twin-Power Scrapers in Prestrip Operations

    The use of scrapers in mining and earthmoving operations is not new, in fact they are one of the earliest methods of bulk earthmoving. A single machine which can load, haul, and dump material with a m

    Jan 1, 2003

  • AUSIMM
    Geotechnical Factors Affecting Coal Recovery in the Maramarua, Mokau, and Ohinewai Deposits

    By B W. Riddol1s

    The 1983 Energy Plan calls for an increase in North Island coal production from both underground and opencast sources from the 1982/1983 production of 843 000 tpa to approximately 3.4 Mtpa within the

    Jan 1, 1984

  • AUSIMM
    Economic Geology of the Wolgan Coking Coal Deposit, Western Coalfield, N.S.W., Australia

    By Graylin R. K, dea T. R, O&apos

    The Wolgan Seam of the Upper Permian IlIawarra Coal Measures of the Western Coalfield of New South Wales consists of high volatile, low sulphur, medium hard coking coal with high fluidity. This seam,

    Jan 1, 1980

  • AUSIMM
    Some Side û Lights on the Prospecting Programme of Bendigo Mines Ltd. And its Subsidiaries

    By Morgan W. M

    It is not the primary object of this paper to treat with the scheme of prospecting in detail, but it is considered that a brief description of the broad lines is necessary so that the significance of

    Jan 1, 1936

  • AUSIMM
    Microseismic monitoring for open pit slope stability and rock fall detection

    By P Dean, M Elmouttie, Y Duan, X Luo

    Slope instability is one of the major concerns in open pit mining operations. A significant collapse of the pit wall can result in injuries, damage to machinery and interruptions to production. A broa

    Nov 8, 2021

  • AUSIMM
    Mining Ventures and Environmental Changes

    A consideration of mining ventures and the changes of an environmental nature that occur. The paper is introduced with a general statement claiming recognition that mining ventures are important to hu

    Jan 1, 1981