Search Documents

  • SME
    Engineering Work Leading To A Rock Tunnel Plan

    By Forrest C. Neil, Clint J. Keifer

    The pollution of our water supply, Lake Michigan, is a continuing threat so long as our overflows from combined sewers exist. The problems have become even more acute during recent years, due to the i

    Jan 1, 1997

  • NIOSH
    RI 6047 Methods Of Analyzing Oilfield Waters: Flame-Spectrophotometric Determination Of Potassium, Lithium, Strontium, Barium, And Manganese

    By A. Gene Collins

    Potassium, lithium, strontium, barium, and manganese are present in many oilfield brines, None of them except barium is determined routinely in brine analyses. Therefore, sensitive and accurate flame-

    Jan 1, 1962

  • SME-ICGCM
    The Design And Selection Of Powered Supports For Application In 4.5 Metre Extraction At Daw Mill Colliery

    By Clive Chadbourne

    Investigations of world wide coal face strata control practice, the study of theoretical calculations and detailed engineering analysis have been combined to design and select a powered roof support s

    Jan 1, 1994

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • SME
    Effects Of Joint Persistence On Jointed Rock Masses

    By W. G. Pariseau

    Equivalent elastic properties of discontinuously jointed rock masses are computed using a non-representative volume element(NRVE) approach within a three dimensional finite element program. Joint pers

    Jan 1, 2003

  • ISEE
    Managing Risk – Evaluating Existing and New Tools Used in Industry

    By Kristen R. Bingham

    "Today, more than ever, drilling and blasting contractors are challenged to manage the ever-changing risks associated with blasting operations. New neighborhoods are encroaching upon mine sites and bl

    Jan 1, 2017

  • AUSIMM
    Geological Features and Origin of Gold Deposits Occurring within the Jiamosi Precambrian Massif, Northeast China

    By G Liu

    Seventy-nine gold deposits and prospects have been discovered in theJiamusi region of northeast China, and constitute one of the most important gold metallogenic belts in China. All these endogenic go

    Jan 1, 1995

  • AIME
    Discussion Of The Papers Presented At The Salt Lake City Meeting, September, 1925

    CONTENTS PAGE ANDERSON, ARVID E., and CAMERON, FRANK K.-Recovery of Copper by Leaching, Ohio Copper Co. of Utah. Discussed by Thomas B. Brighton, H. C. Goodrich, Arvid E. Anderson, Thos. P. Billings

    Jan 12, 1925

  • AUSIMM
    Proper Tyre Management Reduces Tyre Costs (8cc3f990-94b6-4b55-8abb-8c65d8f8d45b)

    By Gordon DM

    Tyres account for 25-30 per cent of the operating costs of large capacity haul units as used in open-cut mines.Tyre operating costs can be substantially reduced and often contained in real terms by ap

    Jan 1, 1983

  • AUSIMM
    Prediction of Near-Field Rock Damage Due to Production Blasting in Limestone Quarries, Japan

    This paper presents the near-field rock damage owing to production blasting in limestone quarry in the western region of Japan. The study's purpose is to learn the mechanism of crack development

    Dec 6, 2010

  • DFI
    Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary

    By Alec C. Bloem

    A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of

    Jan 1, 1991

  • NIOSH
    OFR-42(4)-74 Protection And Troubleshooting Of Coalmine Electrical Cables - I. Introduction And Background - A. Introduction

    Electrical trailing cable used to power coal mining machinery is frequently damaged by tensile strain or crushing by mining machines running over the cable. A major problem is finding the exact locati

    Jan 1, 1973

  • AUSIMM
    Paper No. 172. An Automatic Electrical System For Indicating The Position of ôChairsö in Shafts.

    SEVERAL serious accidents, which had occurred owing to the platman leaving the plat without first withdrawing the "chairs" from the shaft, set the writer scheming to devise a mechanically op

    Jan 1, 1909

  • NIOSH
    IC 7115 Cars for Transporting Explosives

    By O. W. Owings

    "The handling and transportation of explosives and explosives supplies are inherently hazardous owing to their sensitiveness to impact and flame or electric arcs and sparks. Many accidents have occurr

    May 1, 1940

  • AUSIMM
    The Broader Aspects of Secondary Mineralization at Mount Isa, Queensland

    As far as is known at the present time, important ore occurrences at Mount Isa are restricted to the Urquhart Shale. These occur at Mount Isa itself, and some 13 miles north along strike at the Northe

    Jan 1, 1966

  • SME
    Boring At High Thrust And Its Potential In The Hard-Rock Mining Industry In South Africa

    By J. W. Wilson, P. C. Graham

    SUMMARY The Witwatersrand quartzites in which South African gold mining operations are moat exclusively conducted, are notoriously difficult and costly to drill. Despite this situation, however, wi

    Jan 1, 1974

  • ISEE
    Study of Blasting Produced Air Overpressure in Urban Area

    By Zou Dingxiang

    Rock blasting in the project of “Site Formation and Associated Infrastructure Works at Choi Wan Road and Jordan Valley” is the largest urban blasting project in the history of Hong Kong and also is ra

    Jan 1, 2007

  • CIM
    Z1600 Jameson Cell Test Rig – From Rental to Revenue

    By A. Taylor, M. Blanchette, J. Doucet

    "A Z1600 Jameson Cell Test Rig was rented for test work at Vale’s Clarabelle Mill operation. This paper discusses the evolution of renting the unit for test purposes to owning the unit and operating i

    Jan 1, 2012

  • DFI
    Bacteria Help Civil Engineers; Report Of A Pilot Project

    By John W. M. Lambert

    This paper describes the execution and the results of a new method to seal off leaks in water retaining constructions. The new method, called BioSealing is based on activating the bacteries, present i

    Jan 1, 2006

  • NIOSH
    OFR-33-73 A Seismic Communications Investigation Employing A Piezoelextric Transducer

    By Craig C. Johnson

    The purpose of this effort was to investigate the feasibility of employing a piezoelectric transducer for seismic communications applications in mine environments. The transducer, a government furnish

    Jan 1, 1972