Search Documents

  • ISEE
    Vibrating Wire Gages Watch Dynamical Structural Integrity During Blasting

    By A. Feldman

    Measuring dynamic effects on existing structures such as dams and bridges during earthquakes or blasting is frequently done using strong motion detectors. However, a more comprehensive dynamic structu

    Jan 1, 2006

  • SME
    Testing Flotation Frothers

    In practice, frothers are selected following general guidenlies and verification by laboratory and/or plant flotation tests. The terms “powerful” or “selective,” which are commonly used to characetriz

    Jan 1, 2004

  • IIMP
    Medición del desempeño social en el proyecto La Granja – Perú

    By Dirk Arts

    En el 2012 Río Tinto minera inició el diseño del sistema de monitoreo y evaluación para medir el desarrollo social del proyecto La Granja en Cajamarca, Perú. En este sentido, el presente texto señal

    Aug 1, 2014

  • NIOSH
    Determining the Spatial Variability of Personal Sampler Inlet Locations

    By Robert Vinson

    This article examines the spatial variability of dust concentrations within a coal miner?s breathing zone and the impact of sampling location at the cap lamp, nose, and lapel. Tests were conducted in

    Jan 1, 2007

  • SME
    Reclamation At The Santa Fe/Calvada Mine Breaks New Ground

    By Leslie Burnside

    Homestake Mining Co. set out to complete final reclamation at a former open-pit gold mine in west central Nevada. The goal was to exceed regulatory standards by satisfying the company's own high

    Jan 1, 1999

  • AUSIMM
    Application of a Property-Based Flotation Model in Circuit Simulations

    By D Wiseman, D Weedon, T Akroyd

    Models of the size specific processes of particle collision, attachment and detachment have been combined in a form suitable for analysis of a full-scale flotation plant. The model is based on a first

    Jan 1, 2004

  • SME
    Rock Mass Characterization for the WSSC Bi-County Water Tunnel

    By Paul Headland

    The Washington Suburban Sanitary Commission (WSSC) has recently completed design for the Bi-County Water Tunnel Project. The project will include a 10-foot diameter, 5.3-mile long hard rock tunnel loc

    Jan 1, 2008

  • AUSIMM
    An Integrated Agency Approach to Mine Site Environmental Management and Control in New South Wales, Australia

    The Department of Mineral Resources is the lead agency in mine site environment management and control inNew South Wales. The Department introduced a Mining, Rehabilitation and Environmental Managemen

    Jan 1, 1995

  • CIM
    Changing Company Culture

    By Frank B. Amon

    Highland Valley Copper had to make some significant changes in the way it was working in order to counter the effects of ever-increasing costs and decreasing metal prices. A mine/mill optimization pla

    May 1, 2004

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • SAIMM
    Residual stresses in cylindrical rock samples

    By G. Vouille, P. Bérest

    Residual stresses observed in rocks often result from non-compatible initial strains. These stresses can be determined when the incompatibility tensor associated with the initial strain tensor is know

    Jan 1, 2003

  • DFI
    Effect Of Slope On P-Y Curves; Under Passive Loading

    By K. [Muthukkumaran

    An extensive program of laboratory model tests was undertaken to study the effect of slope on p-y curves under passive loading in dry sand. The paper concerns the method developed in a series of labor

    Jan 1, 2006

  • CIM
    Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine Faces

    By Dolea Gabriel Gheorghe

    In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo

    Oct 1, 2009

  • CIM
    The Use of Diagnostic Testwork and CIP/CIL Modeling to Improve the Metallurgical Performance at Two IAMGOLD Operations

    "A simple approach to optimizing the performance of an operating carbon in pulp (CIP) or carbon in leach (CIL) plant is presented. It is possible to reproduce the performance of an operating CIP or CI

    Jan 1, 2011

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • AUSIMM
    Iron sinter process control using X-ray diffraction – part : monitoring of low temperature degradation

    By U König, N Norberg

    To cope with varying raw material qualities and increasing prices for energy, a more frequent and accurate monitoring of the processing of iron ore became the focus in sinter plant operations. Traditi

    Jul 24, 2017

  • SAIMM
    Optimization Of The Operating Density And Particle Size Distribution Of The Cyclone Overflow To Enhance The Recovery Of The Flotation Of Copper Sulphide And Oxide Minerals ? Synopsis

    By F. Ntengwe

    The Konkola Mine, a subsidiary of the Konkola Copper Mines Plc (KCM) which is owned by the Vedanta group of companies of India and Zambia Consolidated Copper Mines Holding limited, is located at Chili

    Jan 1, 2011

  • CIM
    Significant Canadian Developments in Mineral Processing Technology 1961-2011

    By J. E. Nesset

    "I had been requested earlier this year by MetSoc, our sister society of CIM, to contribute a chapter on technical developments in Canadian mineral processing over the past 50 years to their 50th Anni

    Jan 1, 2012

  • CIM
    Outlook for Gold

    By Martin Murenbeeld

    Outlook: Nine Bullish Arguments 1. Global fiscal and monetary reflation: PIIGS, US, etc. 2. Global imbalances: the dollar must decline 3. Global FX reserves are ?excessive?: diversification 4. Cen

    May 1, 2010

  • SAIMM
    Disclaimer Of Warranty

    This publication is provided on an "as is" basis without warranties of any kind, either expressed or implied including, but not limited to warranties of title or implied warranties of merchantability

    Jan 1, 2004