Search Documents

  • AUSIMM
    The Physical Basis of Non-Random Breakage in an Iron-Oxide Ore Hosted Copper Gold Ore

    The Physical Basis of Non-Random Breakage in an Iron-Oxide Ore Hosted Copper Gold Ore

    Sep 13, 2010

  • DFI
    Peak And Post-Peak Shear Strength Of Cement-Bentonite

    By Paul J. Axtell

    Self-hardening cement-bentontie (c-b) slurry walls were constructed as shear walls to stabilize the downstream slope of Tuttle Creek Dam near Manhattan, Kansas. The slope stabilization was required t

    Jan 1, 2010

  • CIM
    Experiences on Process Control Computers at the Concentrator of Outokumpu Oy

    By Olli Aulio, Outokumpu Oy

    "GENERALThe Outokumpu Company is today an important European producer of metals from its own mines: copper nickel cobalt, ferro chrome and zinc being the main products. In 1972 about 4 million tons of

    Jan 1, 1973

  • AUSIMM
    Geochemical Studies in the Coromandel Peninsula - The Merits of Mercury in Soils as a Pathfinder for Precious Metal Mineralisation in the Thames-Waihi Area

    The mercury, gold, silver, copper, lead and zinc values of soils over altered and mineralised rock were determined to establish the potential use of mercury as an indicator element in geochemical pros

    Jan 1, 1979

  • SME
    Coal - Clean Coal Technology: A Holistic Approach

    By Phil Shelton

    What exactly does clean coal mean? Mining coal creates dust and releases methane gas. And burning coal liberates CO2 and emits particulates, including SO2 and NOx. Coal creates wastes that are often s

    Jan 1, 2010

  • NIOSH
    MLA 10-81 - Mineral Resources Of The Domeland Addition (5207) And Woodpecker (5206) Rare II Areas, Tulare And Kern Counties, California

    By James M. Spear

    The U.S. Bureau of Mines conducted a mineral survey of the Domeland Addition (5207) and Woodpecker (5206) RARE II areas during the summer of 1979. These study areas were examined to determine the pres

    Jan 1, 1981

  • NIOSH
    IC 8041 Peat Producers In The United States In 1960 ? Introduction

    By Eugene T. Sheridan

    The Bureau of Mines annually canvasses the peat producers in the United states and publishes economic data on the peat industry, based upon reports submitted by producers. This publication lists all p

    Jan 1, 1961

  • AUSIMM
    Long-Term Mine Planning at the Largest Phosphate Mine in Brazil

    Tapira Mine (Tapira, MG, Brazil) is the largest phosphate ore and concentrate producer in Brazil. The mine is an open pit, which until recently operated with a large equipment fleet and now uses a sma

    May 1, 2010

  • CIM
    LIDAR Geotechnical Mapping for the Construction of Deep Underground Science and Engineering Laboratory at the Former Homestake Mine

    By Zbigniew J. Hladysz

    A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the US National Science Fou

    May 1, 2011

  • CIM
    Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill

    By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin

    "The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr

    Jan 1, 2001

  • NIOSH
    OFR-148-77 Blasthole Underreamers For Surface And In Situ Mining

    By William A. Hustrulid

    A technical and economic evaluation of the potential for improving mining productivity through the use of underreamers in blastholes, specifically in relation to Minnesota taconite, Arizona surface co

    Jan 1, 1977

  • AUSIMM
    The emerging role of the operational geotechnical engineer

    By C G. Sweeney

    The underground mining industry is seeing unprecedented shortages in skilled labour. Migration to Australia being at an all-time low is a leading concern, with pandemic-induced border closures and loc

    Nov 29, 2022

  • AUSIMM
    The Greymouth Coal Project

    The Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn

    Jan 1, 1997

  • AIME
    Part XI - Papers - Techniques for Analyzing Combined First- and Second-Stage Creep Data

    By M. J. Mullikin, J. B. Conway

    Equations capable of representing combined first -and second-stage creep behavior include the Andrade, Cottrell-Aytekin, Garofalo, and de Lacombe equations along with a third-degree polynomial in t1/3

    Jan 1, 1967

  • TMS
    Visualizing the Evolutions of Microstructure through Quenching Processes

    By Makiko Takahashi

    A tool is being developed to predict and visualize the microstructural evolution of steels during quenching. This tool utilizes experimental data and reference data that are stored in a database to pr

    Jan 1, 2003

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • NIOSH
    Bulletin 122 The Principles and Practice of Sampling Metallic Metallurgical Materials

    By Edward Keller

    The work covered by this report was undertaken at the request of Dr. J. A. Holmes, late Director of the Bureau of Mines, to whom the writer had been recommended by C. W. Goodale and E. P. Mathewson, o

    Jan 1, 1916

  • DFI
    Sheetpile Installation Vibration Study

    By Kenneth A. Pidgeon

    This paper presents a case history on mitigating vibration problems associated with the installation of steel sheetpiles. The project in-cludes installation of steel sheetpiles for a utility trench wi

    Jan 1, 1995

  • NIOSH
    OFR-199-83 Determination Of Velocity Measurement Correction Factors And Guidelines

    The investigation summarized in this report addressed two primary issues: the determination and use of correction factors, and the development of guidelines for velocity measurement site selection. Ot

    Jan 1, 1983

  • DFI
    Wharf Damage Due To Settlement Of Deep Soft Subsoil ? Synopsis

    By Z. Y. Ding

    This paper emphasize two points in piled wharf design which are important than structure calculation. First, during design of piled wharf on soft stratum, the bank slope stability is the first importa

    Jan 1, 1991