Search Documents

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • AUSIMM
    Processing Copper-Gold Ore at Ok Tedi

    By Kanau JL, Kilgour I

    This paper describes the metallurgical processes at the 80 000tpd Ok Tedi Mining Limited concentrator, which treats copper- gold ore by single-stage crushing, SAG and ball milling and flotation to

    Jan 1, 1991

  • ISEE
    Applications of Metrics to Blast Designs

    By Thomas Hans Kleine

    In general the software required by a blast designer includes tools that graphically present blast designs (surface & underground), can analyze a design or predict its result, and can assess blasting

    Jan 1, 1995

  • SME
    Prediction And Design Control Of Surface Subsidence By Global Simulation Of Mine Behavior Using Finite Element Mode

    By Shosei Ph. D Serata

    The Stress Control Method of mine design provides enhanced engineering control over the behavior of underground structures in comparison to conventional mine design methods. The same Method can be app

    Jan 1, 1986

  • NIOSH
    RI 3586 Preliminary Report On The Flotation Of Bauxite ? Introduction

    By J. B. Clemmer

    This report summarizes the results of u laboratory study of the beneficiation of Arkansas bauxite by flotation. Although the investigation is not yet completed, a preliminary retort of the results on

    Jan 1, 1941

  • NIOSH
    IC 6878 Notes On Testing The Explosibility Of Coal Dusts And A Proposal To Have An International Test Method

    By George S. Rice

    The following paper was presented at an International Conference on Mine Safety Research held at Dortmund, Germany, September 23-28, 1935, inclusive. This conference was attended by representatives of

    Jan 1, 1936

  • NIOSH
    RI 3586 Preliminary Report On The Flotation Of Bauxite ? Introduction (ac12c6b0-21f7-4176-bc03-aa490cce21e2)

    By J. B. Clemmer

    This report summarizes the results of u laboratory study of the beneficiation of Arkansas bauxite by flotation. Although the investigation is not yet completed, a preliminary retort of the results on

    Jan 1, 1941

  • SME
    DREYER AWARD - How Orebodies are Found

    By J. David Lowell

    The first part of this article is a review of industry techniques and styles during the past 50 years. It is followed by my career history during the same period. The second part covers my ideas abo

    Jan 1, 2000

  • AUSIMM
    Discrete Element Method - Computational Fluid Dynamics Modelling of Flow Behaviour in a Stirred Mill - Effect of Operation Conditions

    Discrete Element Method - Computational Fluid Dynamics Modelling of Flow Behaviour in a Stirred Mill - Effect of Operation Conditions

    Sep 13, 2010

  • CIM
    Evidence of an iron-gold corrosion cell during the Zadra pressure elution of loaded carbon

    By C. Taschereau, G. A. Vickell, A. R. Laplante

    Evidence in support of an iron-gold corrosion cell during the high-temperature/highpressure elution of loaded carbon is presented herein including, but not limited to, its discovery, mode of genesis,

    Jan 1, 2006

  • AUSIMM
    Washability Characteristics of the Liddell Seam

    CONTENTSSummary.Introduction.Location and Geology.Historical and Exploitation.Part 1. Washability Characteristics of the Liddell.Seam.Foybrook Open Cut, Top Bench.Sampling.Size and Ash Distribution.Wa

    Jan 1, 1954

  • AUSIMM
    Effects of Ore Type and Binder Addition on the Formation of Quasi-Particles and Green Bed Permeability at Different Sintering Bed Depths

    By T C. Ooi, L Lu

    Owing to ongoing development of new orebodies and changes to existing mining operations, new ore types with distinct mineralogy, porosity and textures are generated as feed for iron and steelmaking. M

    Aug 12, 2013

  • SME
    Raise Boring - The Reaming Cycle

    By Euclid P. Worden

    INTRODUCTION Today, conventional raise boring is an accepted method of development in underground mines and on major construction projects. Over the years that this technique, and its associated ma

    Jan 1, 1985

  • CIM
    Evolution and Optimization of the Gravity Recoverable Gold Test - In memory of Professor Andre Robert Laplante - 1953-2006 Outstanding Mineral Processing Professor, Engineer and Scientist

    By Sunil Koppalkar, Liming Huang

    "Since late 1980s the research group led by late Professor Andre Robert Laplante at McGill University undertook fundamental studies and applied research of the Knelson Concentrator (KC) and developed

    Jan 1, 2007

  • NIOSH
    OFR-33-81 Detection Instrumentation For Cable Shield Defects

    By James R. Cosby

    This report describes work performed for the Bureau of Mines to evaluate available portable instruments for their effectiveness in detecting and locating damaged metallic shields in Types SHD and SHC

    Jan 1, 1980

  • IOM3
    Alkaline roasting of low-grade chromite

    By G. X. Wang, R. E. Siemens, M. C. Fuerstenau, D. Chandra

    Soda roasting of concentrates from Mouat, Montana, was performed in a temperature range of 450 to 650 degrees C and chromium was solubilised by water leaching at room temperature. It was found that hi

    Jun 18, 1905

  • AUSIMM
    Wire Netting Paddocking in Stopes-Broken Hill South Limited

    In the extraction of level bridge pillars in the South Mine by square-setting methods the general practice is to work transversely from the hanging wall in narrow sections three or four sets wide to t

    Jan 1, 1942

  • CIM
    The Development of Process Mineralogy at Falcon Bridge Limited, and Application to the Raglan Mill

    By Norman O. Lotter, Lori Kormos, Greg J. Wilkie, Peter J. Whittaker, Johannes S. Stickling

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • CIM
    Altered Mining Extraction Sequence and Rock Mass Response in Vale 402 OB at Creighton Mine

    By Denis Thibodeau

    his paper describes a study of an altered mining extraction and the resulting Rockmass response at VALE?s Creighton Mine. Typically, the deep mining zones have strict stope extraction guidelines to

    May 1, 2013

  • CIM
    SPOC Project Software and Manual

    By R. F. Pilgrim

    "This first chapter of the SPOC Manual 1s intended as a general introduction to all the other chapters in which the mineral process evaluation and optimization methodology is presented. This chapter a

    Jan 1, 1986