Underground Application Of OptimizationBy S. J. Jung
The goal of this research is to demonstrate how optimization methodology can be coupled with the finite element method for greater stability of underground mine openings. As a result of increasing min
Jan 1, 1993
-
A comparison between two- and three-dimensional numerical models of a Coeur d'Alene District mineBy T. J. McMahon
This Bureau of Mines study describes the development of a large-scale, three-dimensional, finite-element model of a deep-vein Coeur d?Alene District mine. The three-dimensional model was prepared from
Jan 1, 1989
-
Problems in "Void" Detection in Coal Mine Water HazardsBy Francis Kendorski
One of the most dangerous events in underground coal mining is unexpectedly encountering water inrushes from undetected abandoned mines in the same seam. The surest and most confident method is probe
Jan 1, 2004
-
User-Friendly Finite Element Design of Main Entries, Barrier Pillars, and Bleeder EntriesBy William G. Pariseau, Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson
"This contribution describes development and application of a user-friendly finite element program, UT3PC, to address three important problems in underground coal mine design: (1) safety of main entri
Jan 1, 2017
-
Barrier Pillar Design for Safe and Productive Longwall MiningBy Stephen C. Tadolini
Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use
Jan 1, 2013
-
Methods Of Controlling Thick And Strong Roof In Longwall MiningBy Deren Zhu
The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat
Jan 1, 1990
-
Entry Design For Optimum Stability In A Multi-Seam EnvironmentBy Mohummad Akram
Statistical analysis of multi-seam mining case studies demonstrated that geologic structure and lithological type and sequencing were predominant factors in entry failures. Finite element analysis was
Jan 1, 1993
-
The Autowarning Telltale: A New Safety Monitoring Device for Pillar Extraction OperationsBy David Bigby
Room and pillar mining with full pillar extraction is one of the most hazardous systems of underground coal mining, a significant hazard being the potential for sudden goaf override. The Autowarning
Jan 1, 2011
-
Development of a Numerical Model for the Approximation of Stress Distribution for a Single Vertical Backfilled StopeBy Christopher Newman, Zach Agioutantis, Gabriel S. Esterhuizen
"As conventional underground deposits are continuing to be depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging conditions.
Jan 1, 2018
-
Yielding Cement Roof Supports for Longwall MiningBy Alan A. Campoli
Fosroc continues as a leader in the development of cementitious technology for the mining industry. The considerable expertise accumulated in the development of the Fm cement line has been employed in
Jan 1, 1997
-
Methods Used To Monitor Roof Geology And Entry SupportsBy James M. Tennant
In the mid 1970's, American Electric Power significantly expanded its internal coal production. This involved opening several large mines in seams that had never been mined on a large commercial
Jan 1, 1982
-
The Importance of Underground Stone Mine Roof GeologyBy Frank Kendorski
Several startup or longtime underground stone mines have experienced unanticipated roof control difficulties due to the variable geologic character of the roof strata. Careful mapping of roof conditio
Jan 1, 2002
-
Longwall Moves At Twentymile Recovery Mesh SystemBy Michael A. Berdine
In early 1997, Twentymile Coal Company took a dramatic departure from traditional longwall recovery methods. Previously, Twentymile's standard longwall meshing procedure included the use of chain
Jan 1, 2001
-
The Design And Application Of Propsetter? In Underground Coal MinesBy Clifford McCartney
The PropsetterTM System has been designed and developed to cost effectively solve problems experienced with conventional underground supports used in tailgates, headgates, bleeder entries and as suppl
Jan 1, 1995
-
Investigation Of Subsidence Event Over Multiple Seam Mining Area (b421bdde-19e7-491b-bc6d-a4cce9ef42b4)By Kewal K. Kohli
An investigation was performed to determine the sequence of events which caused the 1987 surface subsidence and related damage to several homes in Walker County, Alabama, USA (see Figure 1). Surface a
Jan 1, 1992
-
Determination Of Plate Size Effect On Ultimate Bearing Capacity Of Weak Floor In Underground Coal Mines Using A Boundary Integral ApproachBy Zhanjing Yu
In this paper, an equation is developed to characterize the relationship between the UBC and plate size using a boundary integral approach. The equation was validated by the results from mo& than seve
Jan 1, 1993
-
Geo-Mechanical Property And Failures Of Weak Roof Shales In Coal MinesBy Yunqing Zhang
Weak shales refer to those with lower strength, thinly- laminated structure, sensitivity to moisture and weathering as well as significant time dependent behavior. It has been said that many future co
Jan 1, 2004
-
36 Years of Subsidence Reporting at the ICGCMBy Nicole E. Evanek, Anthony T. Iannacchione
"Over the past 36 years, a great deal of information has been presented and discussed at the International Conference on Ground Control in Mining (ICGCM). The topic of surface subsidence engineering h
Jan 1, 2018
-
Shear Strength Characteristics of Soft Rock Joints Based on Constant Normal Stiffness TestingLarge-scale shear apparatus is designed to investigate the shear hehaviour of simulated soft rock joints under constant normal stifmess condition. Regular saw-teeth profiles having inclinations betwee
Jan 1, 1997
-
Case Studies Of Progressive Pillar Failure In Two Mines Using Wide PillarsBy Hamid Maleki
Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv
Jan 1, 2000