Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Coal Pillar Design in Tabas Central Mine of Iran

    By Mostafa Sharifzadeh, Ebrahim Ghasemi, Kourosh Shahriar

    "The Tabas Central Mine (TCM) is one of the underground coal mines located in the Tabas coal region, in the mid-eastern part of Iran. This mine is the first mechanized coal mine in Iran that uses the

    Jan 1, 2010

  • SME-ICGCM
    A Roof Model and Its Application in Solid Backfilling Mining

    By Meng Xiao, Peng Huang, Lizin Lan, Feng Ju, Shuai Guo

    "Through changing the axial load on backfilling material compaction test to reflect different overlying strata pressure on backfilling material, the stress-strain relations in the compaction process o

    Jan 1, 2016

  • SME-ICGCM
    The Development and Planning of Multiple Level Underground Limestone Mines

    By Bruce W. King, David A. Newman

    "Underground mines have always been an integral part of the limestone industry. However, beginning in the 1990s, the number of underground limestone mines has increased for many reasons including• Str

    Jan 1, 2016

  • SME-ICGCM
    Simulation Test on Accumulation Laws of Paste-Like Slurry in Cavity Goaf of a Coal Mine

    By Boqiang Wu, Ganggang Xu, Xiaodong Wang, Hai Wang, Shibin Zhu

    "Using a paste-like slurry as a filling from the ground surface to the goaf, artificial pillars can be built in the cavity goaf to support the goaf roof to prevent roof collapse and ground subsidence.

    Jan 1, 2018

  • SME-ICGCM
    Shear Testing of 28 mm Hollow Strand "TG" Cable Bolt

    By Naj Aziz, Peter Craig

    "Double shearing tests were carried out on the 28 mm (1 in) hollow strand Jennmar TG cable bolt to gain a better understanding of the shearing behavior of the cable. The first test was limited to a 50

    Jan 1, 2010

  • SME-ICGCM
    In Situ Stress Measurement and Stress Change Monitoring in a Longwall Mine to Monitor Overburden Caving Behaviour and to Design a Hydraulic Fracture Treatment Program

    By Rob G. Jeffrey, Ken W. Mills, Jesse W. Puller

    "A coal mine in New South Wales is longwall mining 300m wide panels at a depth of 160-180m directly below a 16-20 m thick conglomerate strata. As part of a strategy to use hydraulic fracturing to mana

    Jan 1, 2015

  • SME-ICGCM
    Investigations into the Corrosive Environments Contributing to Premature Failure of Australian Coal Mine Rock Bolts

    By Elia Elias, Alan Crosky, Paul Hagan, Damon Vandermaat, Serkan Saydam, Peter H. Craig

    "The University of New South Wales (UNSW Australia) had been involved in the study of premature failure of rock bolts in Australian coal mines from the initial identification of the problem in 1999 (C

    Jan 1, 2015

  • SME-ICGCM
    Rockburst Control Measures at INCO's Creighton Mine

    By P. Oliver

    Rockburst conditions were first encountered at Inco's Sudbury area operations in the mid 1930's when mining advanced to below the 610 m (2000 ft.) horizon. Now, mining is being carried out a

    Jan 1, 1987

  • SME-ICGCM
    Rib Access Boom for a Roof Bolter

    By Joe McQuerrey, William Kendall, Gene Wilson

    "Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.

    Jan 1, 2010

  • SME-ICGCM
    Review and Estimation of the Hydraulic Conductivity of the Overburden above Longwall Panels. Experience from Australia

    By Winton Gale

    "The aim of this paper is to summarise the results and conclusions of Australian Coal Association Research Project (ACARP) Report Cl3013 which relate to water inflows into a mine which occur through t

    Jan 1, 2010

  • SME-ICGCM
    Study on the Top Caving Mining Technology in Thick Coal Seam beneath the Earth-Rock Dam and Its Influence

    By Wenbing Guo, Yi Tan, Erhu Bai

    "It is important to study the mining technology under structures for raising the coal resources recovery ratio. Based on the geological and mining conditions, the top coal caving harmonic mining techn

    Jan 1, 2016

  • SME-ICGCM
    Stress And Stability In Coal Ribsides And Pillars

    By A. H. PH. D Wilson

    Compared to the rocks encountered in, say, metalliferous mining or tunnel drivage in igneous and metamorphic rocks, the strata associated with the coal measures are relatively soft. If excavations are

    Jan 1, 1981

  • SME-ICGCM
    Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining Area

    By Andre Zingano

    An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se

    Jan 1, 2013

  • SME-ICGCM
    Stress Analysis and Support Design for Longwall Mine-Through Entries (A Case Study)

    By Keith Heasley

    An eastern longwall mine was required to mine through a set of three entries located midway down the length of a panel. Of course, the mine desired to design a successful support system for the mine-t

    Jan 1, 2003

  • SME-ICGCM
    Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas

    Jan 1, 2001

  • SME-ICGCM
    Ground Response As a Longwall Advances Into a Backfilled Recovery Room under Low Cover

    By David F. Gearhart

    A cooperative study was conducted between Signal Peak Energy and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the behavior of a pre-driven recovery room under less tha

    Jan 1, 2014

  • SME-ICGCM
    Critical Appraisal Of Pillar Design As Required By Coal Mines Regulations Of India VIS-VIS Latest Rock Mechanics Formulae

    By S. K. Sharma

    The present study attempts to critically review the pillar-design as required by Coal Mines Regulations of India vis-a-vis latest rockmechanics formulae, Equivalent material modelling was the approach

    Jan 1, 1992

  • SME-ICGCM
    Mine Design Considerations For Surface Subsidence Control

    By John L. Edwards

    The underground coal mines in the Lake Macquarie area of the Newcastle Coalfield, New South Wales, Australia are constrained by surface subsidence restrictions as low as 150 mm. The mining environment

    Jan 1, 1993

  • SME-ICGCM
    Numerical Modeling Of Longwalls In Deep Coal Mines

    By Salah Badr

    Longwall mine layouts with their entries, chain pillars, face support systems, advancing mining faces and compacting gobs represent a geomechanically complex mining operation. Geomechanical aspects ar

    Jan 1, 2003

  • SME-ICGCM
    Tensioned Cable Bolts As Primary Support: Update

    By John C. Stankus

    At the 19th International Conference on Ground Control in Mining, a paper was presented detailing new types of Jennmar INSTáL tensionable cable bolts (Stankus and Taylor, 2000). Since that time, signi

    Jan 1, 2001