A Case Study Of Grouted Roof Bolt Loading In A Two-Entry Gate RoadBy Stephen P. Signer
A field test was conducted by the U.S. Bureau of Mines at the Cyprus Plateau Starpoint No. 2 Mine. near Price. UT. to study the support rock interaction mechanics. Twelve instrumented. fully grouted r
Jan 1, 1990
-
Protecting Underground Coal Miners From Rib FallsBy Michael Gauna
In 2010, the number of fatal rib falls in U.S. underground coal mines exceeded fatal roof falls for the first time ever. While recent trends have seen roof fall fatalities reduced by about 62% since t
Jan 1, 2011
-
Economic Evaluation Of Subsidence Damage Mitigation TechniquesBy David C. Johnson
Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m
Jan 1, 1993
-
The Ground Response Curve, Pillar Loading and Pillar Failure in Coal MinesBy Essie Esterhuizen, Michael M. Murphy, Chris Mark
"The response of the surrounding rock mass to the creation of mining excavations determines the ultimate load on a pillar support system. In conditions where the ground is relatively soft and weak, th
Jan 1, 2010
-
Study on Eco-Friendly Underground Mining System for Ultra-Thick Coal Seams in ThailandBy Takashi Sasaoka
EGAT Mae Moh Lignite Mine in Thailand produces about 16 million tons of lignite annually from open-cut mining. The coal is used to generate 2,400 MW of electricity. In the near future, however, the co
Jan 1, 2011
-
Geomechanical Criteria of Longwall Face Support Selection at Consol MinesBy D. W. H. Su
This paper describes geomechanical criteria employed by Consol Energy for selecting mine-specific longwall face supports in the past decade. The criteria include immediate and main roof rock character
Jan 1, 2004
-
Status Of Longwall Research In CSIROBy Michael Kelly
Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th
Jan 1, 2001
-
The Utilisation of Numerical Modelling to Predict Water and Gas Flows Around Longwall Panels; Two Case Studies from the UK Coal Mining IndustryBy D. J. Reddish
This paper illustrates how numerical modelling has been utilised to predict water and gas pathways around active longwall panels using two case studies. This information has proved invaluable m the de
Jan 1, 2003
-
Analysis of Cutter Roof Using the Boundary Element MethodBy Mikko Ahola
This paper describes recent innovative analyses conducted by the Bureau of Mines to demonstrate the application of the boundary-element method in evaluating the effectiveness of caving chambers or sac
Jan 1, 1987
-
Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of CoverBy Ashok Kumar, Rajendra Singh, Petr Waclawik
High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill
Jan 1, 2018
-
Rock Slope Stability Comparison Between Deterministic and Probabilistic Block Theory Analyses for An Open Pit MineBy Pinnaduwa H. S. W. Kulatilake
A new formulation is given to conduct a probabilistic block theory analysis. A new computer code (BTAC) has been developed to perform both deterministic and probabilistic block theory analyses. The va
Jan 1, 2014
-
Integrating Ground Control And Mine Site Data Through A Geographic Information SystemBy Douglas C. Peters
Part of the ground control research at the U.S. Bureau of Mines is involved with improving ground control data collection and analysis methods. A geographic information system (GIs) is being used with
Jan 1, 1990
-
Worldwide Implementation Of Continuous Miner System - Integrating Ground Control With TechnologyBy Thomas W. McClain
This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Eac
Jan 1, 2001
-
Mechanism of Strata Pressure Characteristics and Its Control Techniques in Faulted Areas Subjected to Longwall MiningBy Ke Yang
"Engineering practices have shown that the skip-fault longwall mining is frequently used when faults with offsets larger than 1 Om are present. Since the skip-fault longwall mining not only reduces th
Jan 1, 2016
-
A Critical Study of Strata Behaviour During Extraction of Pillars in a Thick Coal SeamBy S. Jayanthu
This paper presents analysis of strata behaviour with special reference to convergence and stress variation during an experimental trial of extraction of pillars with cable bolts as major support syst
Jan 1, 1998
-
Ground Control Monitoring of Retreat Room-and-Pillar Mine in Central AppalachiaBy William J. Conrad, Ryan J. Molka, Erik C. Westman
"In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian mine. The program consisted of several monitoring methods including
Jan 1, 2016
-
The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)By G. Skybey
The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen
Jan 1, 1992
-
A Decade of Mobile Roof Support Application in the United StatesBy Larry Howe
Second, or retreat mhng with Mobile Roof Supports (MRS) has now been part of coal mining in the United States for a decade Their utilization has evolved into mining applications which vary in seam hei
Jan 1, 1998
-
Pillar SizingBy Marek J. Mrugala
Coal strength based on scaled uniaxial compressive strength from the laboratory and back calculations from in-mine observations of pillar stability indicate that material strength scaling rules are op
Jan 1, 1989
-
Development And Demonstration Of An Alternate Mining Geometry For Improved Ground Control In An Illinois Coal MineBy Y. P. Chugh
About 60-70% of the underground mined coal in Illinois is extracted using a room-and-pillar mining method that permits extraction of about 50% of the coal. The remaining coal is left behind in the for
Jan 1, 2004