Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    Weatherability Test of Rocks for Underground Mines

    By Kot F. Unrug

    The shale response to moisture changes and the major finding of the appropriate research concerning this subject are briefly reported in this paper. Also described are mine ambient atmospheric condit

    Jan 1, 1997

  • SME-ICGCM
    Monitoring Of Longwall Seal Behaviour For Permeability And Stress Changes

    By Ken Mills

    Dartbrook Mine (Australia) works the Wynn seam, which has a moderate propensity for spontaneous combustion. Prior to any mining a commitment was made to place a segregation barrier pillar between long

    Jan 1, 1999

  • SME-ICGCM
    Rock Mass Classification As An Aid To Estimating The Strength Of Coal Pillars (77026f3a-8230-4eb0-afbc-609f7a2ad471)

    Coal mass strength properties must be estimated to obtain realistic estimates of coal pillar strength. The limitations of existing techniques for approximating these properties are discussed. The coal

    Jan 1, 1992

  • SME-ICGCM
    Safety and Productivity Innovations in Mechanized Bolting

    By Gregory Hinshaw

    Underground mine bolting machines have evolved since inception in the 1940's due to the need for increased safety and productivity. However, major design innovations historically came from change

    Jan 1, 1998

  • SME-ICGCM
    An Approach To Identifying Geological Properties From Roof Bolter Drilling Parameters

    By Gerald I. Finfinger

    Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.

    Jan 1, 2000

  • SME-ICGCM
    Numerical Modeling of the Gob Loading Mechanism in Longwall Coal Mines

    By Khaled Morsy

    Longwall mining is one of the most widely practiced underground coal mining method. The behavior of the longwall gob is very critical in the understanding of the complex ground response to longwall mi

    Jan 1, 2002

  • SME-ICGCM
    FDM Prediction Of A Yield Pillar Performance In Conjunction With A Field Trial

    By H. Yavuz

    A Numerical modelling study using the two dimensional finite difference code "FLAC" was performed for investigating the ability of numerical modelling to predict the performance of yielding pillars. T

    Jan 1, 2001

  • SME-ICGCM
    A New Method For Longwall Pillar Design

    By P. Tsang

    In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed

    Jan 1, 1993

  • SME-ICGCM
    Evaluation Of Low-Coal ATRS Systems

    By M. Terry Hoch

    This paper presents information on low-coal ATRS systems that are now in use. A study was conducted consisting of an in-mine evaluation of ATRS- equipped roof bolters capable of bolting in seams below

    Jan 1, 1988

  • SME-ICGCM
    Analysis of the Effect of Rate of Extraction on Strain Development in Interaction Subsidence Data Using a Neural Network

    By Peter Cain

    In 1993 an opportunity presented to monitor the effects of undermining an abandoned roadway by a longwall panel in the Sydney. N.S. coal field. Interaction subsidence data was collected by survey leve

    Jan 1, 1998

  • SME-ICGCM
    Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)

    By Ed Mchugh

    Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co

    Jan 1, 1999

  • SME-ICGCM
    Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field Conditions

    By Hui Chen

    The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en

    Jan 1, 1993

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    Longwall Pace Bursts and Inadequate Caving: A Came Study

    By K. Y. Haramy

    Deep coal mines with strong roof and floor strata frequently encounter face and rib bursts. The burst problem becomes more severe with increased depth. While the exact causes of bursts are often diffi

    Jan 1, 1987

  • SME-ICGCM
    Roof-Pillar Interface Affecting the Pillar Behavior

    By Andre Cezar Zingano

    "The empirical approach for pillar design assumes that geological conditions should be perfect, such as horizontal seams, and that pillar strength and behavior will only depend on the coal seam streng

    Jan 1, 2016

  • SME-ICGCM
    A Comparison Of Support Reactions To Retreat Longwall Front Abutment For Two Different Gateroad Support Techniques

    By Gary R. Corbett

    The federally owned Cape Breton Development Corporation (CBDC) mines approximately 2.5-3.0 Mt of coal per annum from its Phalen Colliery. As part of an ongoing process to become more commercially viab

    Jan 1, 1993

  • SME-ICGCM
    How to Design an Efficient Roof Bolting Plan Based on Simple In-Mine Measurements

    By C. J. H. Brest van Kempen

    The techniques developed should provide a useful tool, not only during the initial formulation of a suitable bolting plan for a new section, but also for periodic check¬ing on the utilization factor

    Jan 1, 1986

  • SME-ICGCM
    Application of Highwall Mining System at Surface Coal Mine in Thailand

    By Takashi Sasaoka, Pinyo Meechumna, Hiroshi Takamoto, Pipat Laowattanabandit, Akihiro Hamanaka, Kikuo Matsui, Hideki Shimada

    "The EGAT Mae Moh coal mine is an open-cut coal mine in Thailand that produces about 16 million tons of lignite annually to generate 2,400 mw of electricity. The surface mine pit covers is 4 by 7 km (

    Jan 1, 2010

  • SME-ICGCM
    Truss Bolting On-Cycle in Jane Mine Lower Freeport Seam

    By Ken Barish

    Jane Mine of the Keystone Coal Mining Corporation was started in 1962 and is in the Lower Freeport seas located in Armstrong County, Pennsylvania, approximately 45 miles northeast of Pittsburgh. The

    Jan 1, 1984