Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Void Fill and Support Techniques to Stabilize Drift Excavated Through a Transition Zone Mined By a TBM at the Stillwater Mine

    By Josh Johnson, Stephen Tadolini, Mark Ferster, Curt Jacobs

    "Stillwater Mining Company is the only U.S. producer of platinum group metals (PGMs) and the largest producer outside of South Africa and Russia. The Company controls a considerable portion of the J-M

    Jan 1, 2016

  • SME-ICGCM
    3D Modelling of Mine Backfill

    By Muhammad Zaka Emad, Rangzeb Goraya, Muhammad Usman Khan

    "Numerical modeling has been used extensively to assess the stability of surface and underground mines. Tabular, steeply dipping ore bodies are generally mined out by open stoping methods with delayed

    Jan 1, 2017

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Effect of High Horizontal Stress on Coal Mine Entry Intersection Stability

    By K. Hanna

    This manuscript describes an extensive ground control study at the Inland Steel No. 2 Mine near McLeansboro, IL, conducted by the U.S. Department of the Interior's Bureau of Mines (USEM) in coope

    Jan 1, 1986

  • SME-ICGCM
    The Impact Of Three Longwall Coal Mines On Streamflow In The Appalachian Coalfield

    By Denise Y. Dizon

    The objectives of this study were to document the hydrologic impacts of longwall mining on streams, identify the factors affecting the extent of stream dewatering, and develop empirical trends to pred

    Jan 1, 1990

  • SME-ICGCM
    Downhole Overcoring Stress Measurement at a Western Underground Coal Mine

    By David Conover

    Knowledge of the magnitude and direction of the horizontal secondary principal stresses is a critical factor in designing the layout and mining sequence of underground openings. Typically, horizontal

    Jan 1, 2004

  • SME-ICGCM
    The Science of Empirical Design in Mining Rock Mechanics

    By Christopher Mark

    "Many problems in rock mechanics are limited by our imperfect knowledge of the material properties and failure mechanics of rock masses. Mining problems are somewhat unique, however, in that plenty of

    Jan 1, 2015

  • SME-ICGCM
    Techniques To Increase Yield Pillar Residual Strength

    By Dennis R. Dolinar

    The U.S. Bureau of Mines has modeled yield pillars to determine the effects of reinforcement techniques on pillar performance. Model pillars with width-to-height (w/h) ratios ranging from one to four

    Jan 1, 1993

  • SME-ICGCM
    Optimun Mining Plan for Multiple Seam Mining

    By Wen H. Su

    Multiple seam mining and its associated problems are very serious in Southern West Virginia where poor planning or lack of knowledge in seam interaction often results in complete loss of coal propert

    Jan 1, 1984

  • SME-ICGCM
    How Interface Friction and W/H Ratio Affect the Mode of Failure of Coal Specimens

    By Syd Peng, Gamal Rashed

    "Bumps in coal mines have been recognized as a major hazard for many years. These sudden violent failures around mine openings have compromised safety, ventilation and access to mine workings. Previou

    Jan 1, 2015

  • SME-ICGCM
    UK Experience and Numerical Modelling for Planning and Supporting Deep Longwall Over-Mining Operations

    By Bowler Jonathan, Lorraine Kent, Tereza Crisu, Stuart Walker, Nicholas Lightfoot

    "It has been the practice in Europe to extract the most economic seams first: taking the seams sequentially, top down, to avoid operating within the fractured strata formed by the subsidence trough ab

    Jan 1, 2016

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006

  • SME-ICGCM
    Introduction of a Measurement Based Ground Control Management System to a Deep Level Potash Mine

    By Alexandra Garcia

    A measurement-based ground control management system, commonly employed in coal mines, has been successfully implemented in a UK potash mine operating at a depth of over 800 m. This system includes th

    Jan 1, 2014

  • SME-ICGCM
    A Study of the Performance of Glass Fibre Rock Reinforcement Components

    By Jonathan P. Furniss

    The paper describes a range of laboratory tests undertaken on full column resin anchored glass fibre rockbolt systems, to assess all aspects of their performance. Laboratory instrumentation has been d

    Jan 1, 1997

  • SME-ICGCM
    Multi?Seam Mining Over Old Workings with Small Pillars - A Case Study

    By Peter Zhang

    Room and pillar mining under shallow depth is usually conducted with a high extraction ratio, which leaves small pillars with a low safety factor in some old workings in abandoned mines. Pillar slough

    Jan 1, 2014

  • SME-ICGCM
    Development of Road Header Roof Bolting Module

    By Sean C. Farrell

    In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P

    Jan 1, 2014

  • SME-ICGCM
    Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery Optimization

    By David P. Conover, Jake Bain, Christopher M. Ross

    "Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining

    Jan 1, 2017

  • SME-ICGCM
    Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine

    By Steve P. Signer

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p

    Jan 1, 2001

  • SME-ICGCM
    A Pipeliner's Perspective on Longwall Mining

    By Robert B. Francini

    Longwall mining and pipelines have coexisted since longwall mining was introduced into the United States. How the pipeline operator reacts to longwall mining under their line depends on many factors.

    Jan 1, 2011

  • SME-ICGCM
    Remote Detection Of Abandoned Mine Workings Using Radio Imaging Method Techniques

    By James G. Schotsch

    Unmapped abandoned mines are hazards for under¬ground mines, surface mines and surface structures. The Radio Imaging Method (RIM) provides a cross borehole technique to remotely detect abandoned mine

    Jan 1, 1990