Gold Recovery From Molybdenum Concentrates At Island Copper MineBy M. R. Lastra
Island Copper Mine began gold recovery Tom molybdenum sulfide concentrates in April, 1985. Plant design capacity is 20 tons of molybdenum concentrate per day. The molybdenum concentrate is produced in
Jan 1, 1986
-
Upgrading Flue-Gas Scrubber Sludge By Froth Flotation, Using Octadecylamine/Octadecylguanidine CollectorBy K. J. Shoop
Coal-fired power plants in the U. S. produce approximately 20 million metric tons of Hue-gas desulfurization sludge every year. The sludge mainly consists of calcium sulfite and calcium sulfate. This
Jan 1, 1998
-
A Review Of The Programs And Activities Of The Generic Mineral Technology Center For Respirable DustBy Robert L. Frantz
The U.S. Bureau of Mines (USBM) established on August 15, 1983, a Generic Mineral f Technology Center (GTC) for Respirable Dust within the Mining and Mineral Resources Research Institutes (MRIs) at Th
Jan 1, 1986
-
A Kinetic Model For Dissolution Of Metals - The Role Of Heterogeneous Reaction And Mass TransferA kinetic model for leaching of various metals with different lixiviants in a batch system has been developed. Material balances for reactants and products at the solid/liquid interface were formulate
Jan 1, 1992
-
Production Of Construction Aggregates In Urban AreasBy B. Salopek
The greatest part of crushed stone, gravel and sand production is extracted through open pit operations, whereas gravel and sand are also partially extracted from riverbeds. Its obvious that such a mi
Jan 1, 2003
-
Ace Hydrocyclone: A Fast Froth Cyclonic Beneficiation Technology For Fine And Ultrafine Minerals - SME Annual Meeting 2023By H. Fayed
Froth flotation technology is the backbone of the minerals pro-cessing industry where minerals are concentrated by selective separa-tion; either direct or in-direct flotation. In direct flotation usef
Feb 1, 2023
-
Portable 42" Gyratory Crusher ? IntroductionBy V. W. Smith
For the past 50 years, the primary crushing of stone at the Dolase Bros. Co. Richards Spur Quarry. 13 miles north of Lawton, Oklahoma, has been accomplished by a Traylor 42-inch gyratory crusher. The
Jan 1, 1986
-
In-Situ Electromagnetic Probing Of Coal SeamsBy Sidney A. Suhler
The persistent requirement for methods and equipment capable of detecting hazardous anomalies in advance of underground mining has led to the development by the U.S. Bureau of Mines of a directional r
Jan 1, 1983
-
Bubble Generation In Swirl Flow During Air-Sparged Hydrocyclone Flotation (Preprint 95-173)By D. Lelinski
Air-sparged hydrocyclone (ASH) flotation is one of the new promising technologies. Numerous applications have been successfully tested since its conception; nevertheless, research and development effo
Jan 1, 1995
-
The Influence Of Oxygen Defect States On The Surface Chemistry Of Sylvite And Its Flotation ResponseBy M. R. Yalamanchili
Recently, noequilbrium electrokinetic measurements using laser-Doppler electrophoresis were reported by Miller et al. (1992) for alkali halides and the sign of their surface charge thus determined. Th
Jan 1, 1994
-
An Engineering Approach To Reduce The Cost Of Roof Support In A Coal Mine Experiencing Complex Ground Control ProblemsBy A. W. Khair
This paper presents an engineering approach to solve a complex ground control problem at reduced cost, allowing the mine to be operated safely and economically. The mine has experienced serious and co
Jan 1, 1990
-
Optimal Drillhole Location Using GeostatisticsBy Mark E. Gershon
Conventional methods of drillhole site selection are reviewed briefly. Two approaches using geostatistics are then discussed, both of which have been shown to yield improved results. Finally, a branch
Jan 1, 1983
-
Crushing In The Pit - Ore Fracture and TransportationBy S. D. Michaelson
Open pits and quarries are the major sources of all "hard rock" tonnage mined today. Normally, ore is fractured from the pit face by blasting and then truck-hauled to a primary crusher where processin
Jan 1, 1968
-
Reprocessing Of A French Guyana Operation?s Tailings Using Flotation For Gold ConcentrationCompagnie Minière Espérance mines a primary gold orebody in an openpit. The ore is processed through crushing, primary gravity concentration, grinding and secondary gravity separation, generating tail
Jan 1, 2010
-
Realizing CAD's Full Potential In Ventilation SimulationBy S. B. Patton, T. Novak
To fully utilize a ventilation simulator as a planning and production tool, the network database must keep pace with mining progress. By using AutoCAD's™ attribute-definition function, the branch
Jan 1, 1995
-
Mine Plan Response To Western Geological ConditionsBy J. M. Mercier
Approximately seven (7) years of recent intensive mining activity in the Wasatch Plateau Coal Field of Utah has revealed distinct geologic patterns which, at times, profoundly influence reserve estima
Jan 1, 1984
-
Geophysical Techniques Being Used To Study Gulf Coast Salt Domes For The Storage Of Nuclear WasteBy R. M. White
Abstract. Gulf Coast Salt Domes are being considered for radioactive waste disposal and this paper describes the geophysical techniques currently being used and those being considered for later phases
Jan 1, 1980
-
Rock Cutter Evaluation from Performance Curves: PDC Core BitsBy Alfred W. Eustes III
The first of a series on the evaluation of rock cutting tools, this paper discusses the results of full-scale laboratory drilling tests that compare the performances of several polycrystalline diamond
Jan 1, 1998
-
Hydrolytic Precipitation Of Fine Oxide Powders By Supercritical FluidsBy P. R. Taylor
A reaction is evaluated by which heated and pressurized water is used to precipitate metal oxides from loaded Kelex 100 complexes. Pure copper oxide (CuO) and pure nickel (Nio) in powder form, and ran
Jan 1, 1992
-
Case History of the Orme Street Combined Trunk Relief Sewer Phase IIIBy Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold
Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do
Jan 1, 2003