    Room-and-Pillar Method of Open- Stope Mining - Open Stope Mining at the Magmont Mine, Bixby, MO

    By G. D. Bates

    INTRODUCTION The Magmont mine is a joint venture of Cominco American Inc. (operator) and Dresser Minerals, Inc. The mine-mill operation is located approximately 160 km (100 miles) southwest of St.

    Jan 1, 1982

  • SME
    Ore Bodies, The Movie

    By R. Sandefur

    Recent advances in personal computer technology allow movies of various types to be made and displayed on PC and Macintosh computers. An interesting application of this movie technology is animation o

    Jan 1, 1994

  • SME
    Istanbul Strait Road Tunnel Project—Seismic Joint and Passive Fire Protection in Double Deck TBM Tunnel

    By Basar Arioglu, Jaeung Kim, Mehmet Öztürk, Jinmoo Lee, Dongho Lee, Taek-Kon Kim

    "Istanbul Strait Road Tube Crossing Project (Eurasia Tunnel) includes 3.34 km of a bored double-deck tunnel under the Bosphorus Strait, at a maximum depth of 106 m from the sea level, and 1 km of twin

    Jan 1, 2016

  • SME
    Optimizing Complex Gold Mill Metallurgy For Cash Flow Improvement

    By M. I. Brittan

    A technique has been developed that analyzes routine mill operating data to determine the key operating parameters responsible for gold losses to tails. These parameters represent the prime operating

    Jan 1, 2010

  • SME
    Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021

    By D. Nebbia, R. Aliberti, F. Solesin

    The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren

    Jun 13, 2021

  • SME
    Initial Filling of 15 km Long, 10.50 m Diameter Voluminous Water Conductor System Constructed in Fragile Himalayan Geology - With Specific Reference to SJVN’s Rampur Hydro Electric Project (412 MW) - India

    By Rakesh Sehgal, Pushkar Verma, Mohit Sharma

    "SJVN Limited successfully commissioned its Rampur HEP (412 MW) in 2014. The project has been planned to operate in tandem by directly utilizing the Tail Water of SJVN’s prestigious Nathpa Jhakri Hydr

    Jan 1, 2016

  • SME
    The Use of Low-Density Cellular Concrete (LDCC) in Annular Fill Applications: Kaneohe-Kailua Sewer Tunnel Case Study - RETC2021

    By Don Painter, Nico Sutmoller, Lori M. K. Kahikina, Brian Dorwart

    This paper will address the feasibility of using low-density cellular concrete (LDCC) for an annular fill application where project conditions required pumping the LDCC material for distances of up to

    Jun 13, 2021

  • SME
    Meandu Rising: The Second Life Of Tarong Coal Project's Meandu Mine - Introduction

    By J. G. Pippenger

    Rio Tinto Coal Australia (RTCA) developed Meandu Mine in Queensland, Australia in 1983 to supply thermal coal to the adjacent newly constructed Tarong Power Station (TPS). In designing the mine, RTCA

    Jan 1, 2011

  • SME
    Opportunities and Challenges for Autonomous Shuttle Car Operation in Underground Coal Mines

    By J. Sottile, V. Androulakis

    Operators of underground coal mine shuttle cars are exposed to numerous hazards including noise, dust and musculoskeletal trauma. The repetitive nature of shuttle car operation leads to fatigue-relate

    Jan 1, 2019

  • SME
    Metallurgy, Process Control and Mineralogy Integration at the Kittila Mine, Finland

    By R. Thorpe, M. Dosbaba, A. Kopriva, A. Niiranen, J. Ruokanen

    "Automated Mineralogy (AM) is an important diagnostic tool in flotation plants as it adds ore and particle mineralogical properties to traditional mass and chemical data. AM is used in project develop

    Jan 1, 2017

  • SME
    Mining-induced subsidence and deformation characteristics with thick unconsolidated overlying strata

    By Dapeng JIANG, Haixiao YANG, Shanxi WU, Jinwang Zhang, Guoliang XU, Yipeng ZHANG

    The subsidence and deformation characteristics of strata with thick unconsolidated overlying strata is quite different from that with consolidated overlying strata. In this paper, based on the enginee

  • SME
    Evaluating Tailgate Spray Manifolds to Reduce Dust Exposures for Shearer Face Personnel

    By G. J. Joy, J. P. Rider

    "Technical advances in longwall mining over the last several years have resulted in much larger and faster shearers that have the capability of mining at speeds over 100 ft./min. This has resulted in

    Jan 1, 2015

  • SME
    Latest Development In Hot Material Coolers

    By H. Weber

    This paper is in three parts. Part I discusses the various types of cement clinker coolers now in full-scale operation. Part II is a detailed study of the criteria for selection of the type of cement

    Jan 1, 1980

  • SME
    Understanding the Subsurface Conditions for the Cemetery Brook Drain Tunnel Project - RETC2023

    By Frederick McNeill, Mahmood Khwaja, Benjamin Lundsted, David Polcari, Michael S. Schultz, Timothy Clougherty

    The City of Manchester, New Hampshire, is embarking on one of its largest public works projects in history to construct a 12,000 foot long, large-diameter, conveyance tunnel through downtown Mancheste

    Jun 13, 2023

  • SME
    Considerations for Sublevel Open Stoping

    By Brain W. Lawrence

    Sublevel stoping generally is a large-scale open stoping method. It sometimes is referred to as long-hole or blasthole stoping. This method usually is applied to strong ore bodies that require minimal

    Jan 1, 1982

  • SME
    The Good, The Bad, And The Ugly Lessons Learned In The Design And Construction Of Heap Leach Pads

    By Allan J. Breitenbach

    Heap leach operations provide a low-cost method for recovering gold, silver, and copper metals from low grade ore materials. The processed ore materials are stacked in controlled lifts on a lined pad

    Jan 1, 1999

  • SME
    Impact of Using Synchronous Condenser for Power System Stability and Improvement of Short Circuit Power in Mining Projects

    By M. Nambiar

    Due to the remote locations of the mining projects and the demand for long transmission lines to provide electrical power, mining sites often operate with poor network power quality and low short circ

    Feb 23, 2014

  • SME
    Exploration Of P.T. Inco's Nickel Laterite Deposits In Sulawesi, Indonesia

    By H. O. Harju

    In July 1968, P.T. Inco Indonesia was granted a Contract of Work to explore and develop the nickel laterite resources on the southeastern peninsula of the island of Sulawesi. Since 1970, exploration h

    Jan 1, 1979

  • SME
    Increasing the recovery of thick and closely spaced coal seams in the western US - some geologic and longwall considerations

    By Donna L. Boreck

    Introduction Coal has been mined in the western United States since the mid-1800s. The resource is abundant in the West. Despite recent economic conditions, it remains an important part of the nation

    Jan 3, 1988

  • SME
    Quarry Reclamation And Reversionary Value

    By E. G. Hoover

    In the mid-I 970s the rallying cry sent out by the aggregate trade associations to aggregate operators was to come to Washington and help design national legislation mandating reclamation of pits and

    Jan 1, 1998